§ 205.351 Reporting requirements.
For the purpose of this section, a report or a part of a report may be made jointly by two or more entities. Every electric utility or other entity engaged in the generation, transmission or distribution of electric energy for delivery and/or sale to the public shall report promptly, through the DOE Emergency Operations Center, by telephone, the occurrence of any event such as described in paragraphs (a) through (d) of this section. These reporting procedures are mandatory. Entities that fail to comply within 24 hours will be contacted and reminded of their reporting obligation.
(a) Loss of Firm System Loads, caused by:
(1) Any load shedding actions resulting in the reduction of over 100 megawatts (MW) of firm customer load for reasons of maintaining the continuity of the bulk electric power supply system.
(2) Equipment failures/system operational actions attributable to the loss of firm system loads for a period in excess of 15 minutes, as described below:
(i) Reports from entities with a previous year recorded peak load of over 3000 MW are required for all such losses of firm loads which total over 300 MW.
(ii) Reports from all other entities are required for all such losses of firm loads which total over 200 MW or 50 percent of the system load being supplied immediately prior to the incident, whichever is less.
(3) Other events or occurrences which result in a continuous interruption for 3 hours or longer to over 50,000 customers, or more than 50 percent of the total customers being served immediately prior to the interruption, whichever is less.
(b) Voltage Reductions or Public Appeals:
(1) Reports are required for any anticipated or actual system voltage reductions of 3 percent or greater for purposes of maintaining the continuity of the bulk electric power supply system.
(2) Reports are required for any issuance of a public appeal to reduce the use of electricity for purposes of maintaining the continuity of the bulk electric power system.
(c) Vulnerabilities that could Impact System Reliability:
(1) Reports are required for any actual or suspected act(s) of physical sabotage (not vandalism) or terrorism directed at an electric power supply system, local or regional, in an attempt to either:
(i) Disrupt or degrade the service reliability of the local or regional bulk electric power supply system, or
(ii) Disrupt, degrade, or deny bulk electric power service to:
(A) A specific facility (industrial, military, governmental, private), or
(B) A specific service (transportation, communications), or
(C) A specific locality (town, city, county).
(2) Reports are required for any abnormal emergency system operating condition(s) or other event(s) which in the judgment of the reporting entity could or would constitute a hazard to maintaining the continuity of the bulk electric power supply system. Examples will be provided in the DOE pamphlet on reporting procedures.
(d) Fuel Supply Emergencies:
(1) Reports are required for any anticipated or existing fuel supply emergency situation which would threaten the continuity of the bulk electric power supply system, such as:
(i) Fuel stocks or hydro project water storage levels are at 50 percent (or less) of normal for that time of the year, and a continued downward trend is projected.
(ii) Unscheduled emergency generation is dispatched causing an abnormal use of a particular fuel type, such that the future supply or stocks of that fuel could reach a level which threatens the reliability or adequacy of electric service.
(Approved by the Office of Management and Budget under control number 1901-0288)

Title 10 published on 2014-01-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 16 - CONSERVATION

§ 791 - Repealed. Aug. 26, 1935, ch. 687, title II,

§ 791a - Short title

§ 792 - Federal Power Commission; creation; number; appointment; term; qualifications; vacancies; quorum; chairman; salary; place of holding sessions

§ 793 - Appointment of officers and employees of Commission; duties, and salaries; detail of officers and employees from other departments; expenditures authorized

§ 793a - Repealed.

§ 794, 795 - Omitted

§ 796 - Definitions

§ 797 - General powers of Commission

§ 797a - Congressional authorization for permits, licenses, leases, or authorizations for dams, conduits, reservoirs, etc., within national parks or monuments

§ 797b - Duty to keep Congress fully and currently informed

§ 797c - Dams in National Park System units

§ 797d - Third party contracting by FERC

§ 798 - Purpose and scope of preliminary permits; transfer and cancellation

§ 799 - License; duration, conditions, revocation, alteration, or surrender

§ 800 - Issuance of preliminary permits or licenses

§ 801 - Transfer of license; obligations of transferee

§ 802 - Information to accompany application for license; landowner notification

§ 803 - Conditions of license generally

§ 804 - Project works affecting navigable waters; requirements insertable in license

§ 805 - Participation by Government in costs of locks, etc.

§ 806 - Time limit for construction of project works; extension of time; termination or revocation of licenses for delay

§ 807 - Right of Government to take over project works

§ 808 - New licenses and renewals

§ 809 - Temporary use by Government of project works for national safety; compensation for use

§ 810 - Disposition of charges arising from licenses

§ 811 - Operation of navigation facilities; rules and regulations; penalties

§ 812 - Public-service licensee; regulations by State or by commission as to service, rates, charges, etc.

§ 813 - Power entering into interstate commerce; regulation of rates, charges, etc.

§ 814 - Exercise by licensee of power of eminent domain

§ 815 - Contract to furnish power extending beyond period of license; obligations of new licensee

§ 816 - Preservation of rights vested prior to June 10, 1920

§ 817 - Projects not affecting navigable waters; necessity for Federal license, permit or right-of-way; unauthorized activities

§ 818 - Public lands included in project; reservation of lands from entry

§ 819 - Repealed. Aug. 26, 1935, ch. 687, title II,

§ 820 - Proceedings for revocation of license or to prevent violations of license

§ 821 - State laws and water rights unaffected

§ 822 - Reservation of right to alter or repeal chapter

§ 823 - Repeal of inconsistent laws

§ 823a - Conduit hydroelectric facilities

§ 823b - Enforcement

§ 823c - Alaska State jurisdiction over small hydroelectric projects

§ 823d - Alternative conditions and prescriptions

U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE
Statutes at Large
Public Laws
Presidential Documents

Executive Order ... 10485

Executive Order ... 11790

Executive Order ... 12009

Executive Order ... 12038