10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

prev | next
§ 50.90 Application for amendment of license, construction permit, or early site permit.
Whenever a holder of a license, including a construction permit and operating license under this part, and an early site permit, combined license, and manufacturing license under part 52 of this chapter, desires to amend the license or permit, application for an amendment must be filed with the Commission, as specified in §§ 50.4 or 52.3 of this chapter, as applicable, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.
[72 FR 49504, Aug. 28, 2007]

Title 10 published on 2014-01-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Statutes at Large

Title 10 published on 2014-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 10 CFR 50 after this date.

  • 2014-04-22; vol. 79 # 77 - Tuesday, April 22, 2014
    1. 79 FR 22456 - Performance-Based Emergency Core Cooling Systems Cladding Acceptance Criteria
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Proposed rule; extension of comment period.
      The comment periods for the proposed rule, the associated draft guidance, and the information collection aspects (79 FR 16106; March 24, 2014) have been extended and now end on August 21, 2014.
      10 CFR Parts 50 and 52