10 CFR 60, Subpart E - Technical Criteria
- § 60.101 — Purpose and nature of findings.
- § 60.102 — Concepts.
- — Performance Objectives
- § 60.111 — Performance of the geologic repository operations area through permanent closure.
- § 60.112 — Overall system performance objective for the geologic repository after permanent closure.
- § 60.113 — Performance of particular barriers after permanent closure.
- — Land Ownership and Control
- § 60.121 — Requirements for ownership and control of interests in land.
- — Siting Criteria
- § 60.122 — Siting criteria.
- — Design Criteria for the Geologic Repository Operations Area
- § 60.130 — General considerations.
- § 60.131 — General design criteria for the geologic repository operations area.
- § 60.132 — Additional design criteria for surface facilities in the geologic repository operations area.
- § 60.133 — Additional design criteria for the underground facility.
- § 60.134 — Design of seals for shafts and boreholes.
- — Design Criteria for the Waste Package
- § 60.135 — Criteria for the waste package and its components.
- — Preclosure Controlled Area
- § 60.136 — Preclosure controlled area.
- — Performance Confirmation Requirements
- § 60.137 — General requirements for performance confirmation.
Title 10 published on 2013-01-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.