10 CFR 71.85 - Preliminary determinations.

§ 71.85 Preliminary determinations.
Before the first use of any packaging for the shipment of licensed material—
(a) The licensee shall ascertain that there are no cracks, pinholes, uncontrolled voids, or other defects that could significantly reduce the effectiveness of the packaging;
(b) Where the maximum normal operating pressure will exceed 35 kPa (5 lbf/in2) gauge, the licensee shall test the containment system at an internal pressure at least 50 percent higher than the maximum normal operating pressure, to verify the capability of that system to maintain its structural integrity at that pressure; and
(c) The licensee shall conspicuously and durably mark the packaging with its model number, serial number, gross weight, and a package identification number assigned by NRC. Before applying the model number, the licensee shall determine that the packaging has been fabricated in accordance with the design approved by the Commission.

Title 10 published on 2014-01-01

no entries appear in the Federal Register after this date.

Title 10 published on 2014-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 10 CFR 71 after this date.

  • 2014-02-11; vol. 79 # 28 - Tuesday, February 11, 2014
    1. 79 FR 8097 - Deliberate Misconduct Rule and Hearings on Challenges to the Immediate Effectiveness of Orders
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Proposed rule.
      Submit comments by May 12, 2014. Comments received after this date will be considered if it is practical to do so. However, the NRC is able to ensure consideration only of comments received on or before this date.
      10 CFR Parts 2, 30, 40, 50, 52, 60, 61, 63, 70, 71, 72, 76, 110, and 150