§ 73.72
Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel.
(a) A licensee, other than one specified in paragraph (b) of this section, who, in a single shipment, plans to deliver to a carrier for transport, to take delivery at the point where a shipment is delivered to a carrier for transport, to import, to export, or to transport a formula quantity of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel required to be protected in accordance with § 73.37, shall:
(1) Notify in writing the Director, Division of Security Policy, Office of Nuclear Security and Incident Response, using any appropriate method listed in § 73.4. Classified notifications shall be sent to the NRC headquarters classified mailing address listed in appendix A to this part.
(2) Assure that the notification will be received at least 10 days before transport of the shipment commences at the shipping facility;
(3) Include the following information in the notification:
(i) The name(s), address(es), and telephone number(s) of the shipper, receiver, and carrier(s);
(ii) A physical description of the shipment:
(A) For a shipment other than irradiated fuel, the elements, isotopes, enrichment, and quantity;
(B) For a shipment of irradiated fuel, the physical form, quantity, type of reactor, and original enrichment;
(iii) A listing of the mode(s) of shipment, transfer point(s), and route(s) to be used;
(iv) The estimated time and date that shipment will commence and that each country along the route is scheduled to be entered; and
(v) The estimated time and date of arrival of the shipment at the destination;
(4) The NRC Headquarters Operations Center shall be notified by telephone at least 2 days before commencement of the shipment at the phone numbers listed in appendix A to this part. Classified notifications shall be made by secure telephone.
(5) The NRC Headquarters Operations Center shall be notified by telephone of schedule changes greater than ±6 hours at the numbers listed in appendix A to this part. Classified notifications shall be made by secure telephone.
(b) A licensee who makes a road shipment or transfer with one-way transit times of one hour or less in duration between installations of the licensee is exempt from the requirements of this section for that shipment or transfer.
[52 FR 9653, Mar. 26, 1987, as amended at 53 FR 4111, Feb. 12, 1988; 60 FR 24552, May 9, 1995; 67 FR 3586, Jan. 25, 2002; 68 FR 58820, Oct. 10, 2003; 74 FR 62684, Dec. 1, 2009]

Title 10 published on 2012-01-01

The following are only the Rules published in the Federal Register after the published date of Title 10.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-03-19; vol. 78 # 53 - Tuesday, March 19, 2013
    1. 78 FR 16922 - Physical Protection of Byproduct Material
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Final rule.
      Effective Date: This final rule is effective on May 20, 2013. Compliance Date: Compliance with this final rule is required on March 19, 2014.
      10 CFR Parts 20, 30, 32, 33, 34, 35, 36, 37, 39, 51, 71, and 73

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S.C. : Title 42 - THE PUBLIC HEALTH AND WELFARE

§ 2073 - Domestic distribution of special nuclear material

§ 2167 - Safeguards information

§ 2169 - Fingerprinting for criminal history record checks

§ 2297f - Gaseous diffusion facilities

§ 5841 note - Establishment and transfers

§ 5844 - Office of Nuclear Safety and Safeguards

§ 10155 - Storage of spent nuclear fuel

§ 10161 - Monitored retrievable storage

Statutes at Large

119 Stat. 594

Title 10 published on 2012-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 10 CFR 73 after this date.

  • 2013-04-22; vol. 78 # 77 - Monday, April 22, 2013
    1. 78 FR 23684 - Personnel Access Authorization Requirements for Nuclear Power Plants
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Petition for rulemaking; notice of receipt and request for comments.
      Submit comments by June 6, 2013. Comments received after this date will be considered if it is practical to do so, but the NRC is able to assure consideration only for comments received on or before this date. Because the NRC has determined that the petition should be expedited due to the aforementioned pending arbitration cases, requests for extension of the comment period will not be granted.