10 CFR Part 1021, Subpart D, Appendix C to Subpart D of Part 1021 - Classes of Actions that Normally Require EAs but not Necessarily EISs

View PDF at GPO Pt. 1021, Subpt. D, App. C
Appendix C to Subpart D of Part 1021—Classes of Actions that Normally Require EAs but not Necessarily EISs
Table of Contents
C1[Reserved]
C2[Reserved]
C3Electric Power Marketing Rate Changes, Not Within Normal Operating Limits
C4Upgrading, Rebuilding, or Construction of Powerlines
C5Vegetation Management Program
C6Erosion Control Program
C7Contracts, Policies, and Marketing and Allocation Plans for Electric Power
C8Protection of Cultural Resources and Fish and Wildlife Habitat
C9Wetlands Demonstration Projects
C10[Reserved]
C11Particle Acceleration Facilities
C12Energy System Demonstration Actions
C13Import or Export Natural Gas Involving Minor New Construction
C14Water Treatment Facilities
C15Research and Development Incinerators and Nonhazardous Waste Incinerators
C16Large Waste Packaging and Storage Facilities
C1[Reserved]
C2[Reserved]
C3Electric Power Marketing Rate Changes, Not Within Normal Operating Limits
Rate changes for electric power, power transmission, and other products or services provided by Power Marketing Administrations that are based on changes in revenue requirements if the operations of generation projects would not remain within normal operating limits.
C4Upgrading, Rebuilding, or Construction of Powerlines
Upgrading or rebuilding more than approximately 20 miles in length of existing powerlines; or construction of powerlines (1) More than approximately 10 miles in length outside previously disturbed or developed powerline or pipeline rights-of-way or (2) more than approximately 20 miles in length within previously disturbed or developed powerline or pipeline rights-of-way.
C5Vegetation Management Program
Implementation of a Power Marketing Administration system-wide vegetation management program.
C6Erosion Control Program
Implementation of a Power Marketing Administration system-wide erosion control program.
C7Contracts, Policies, and Marketing and Allocation Plans for Electric Power
Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of, or acquisition of power from, new generation resources that are equal to or less than 50 average megawatts; (2) changes in the normal operating limits of generation resources equal to or less than 50 average megawatts; or (3) service to discrete new loads of less than10 average megawatts over a 12-month period.
C8Protection of Cultural Resources and Fish and Wildlife Habitat
Large-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders and minor diversion channels), or fisheries.
C9Wetlands Demonstration Projects
Field demonstration projects for wetlands mitigation, creation, and restoration.
C10[Reserved]
C11Particle Acceleration Facilities
Siting, construction or modification, operation, and decommissioning of low- or medium-energy (when the primary beam energy exceeds approximately 100 million electron volts and the average beam power exceeds approximately 250 kilowatts or where the average current exceeds 2.5 milliamperes) particle acceleration facilities, including electron beam acceleration facilities, and associated beamlines, storage rings, colliders, and detectors for research and medical purposes, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible).
C12Energy System Demonstration Actions
Siting, construction, operation, and decommissioning of energy system demonstration actions (including, but not limited to, wind resource, hydropower, geothermal, fossil fuel, biomass, and solar energy, but excluding nuclear). For purposes of this category, “demonstration actions” means actions that are undertaken at a scale to show whether a technology would be viable on a larger scale and suitable for commercial deployment.
C13Import or Export Natural Gas Involving Minor New Construction
Approvals or disapprovals of authorizations to import or export natural gas under section 3 of the Natural Gas Act involving minor new construction (such as adding new connections, looping, or compression to an existing natural gas or liquefied natural gas pipeline, or converting an existing oil pipeline to a natural gas pipeline using the same right-of-way).
C14Water Treatment Facilities
Siting, construction (or expansion), operation, and decommissioning of wastewater, surface water, potable water, and sewage treatment facilities with a total capacity greater than approximately 250,000 gallons per day, and of lower capacity wastewater and surface water treatment facilities whose liquid discharges are not subject to external regulation.
C15Research and Development Incinerators and Nonhazardous Waste Incinerators
Siting, construction (or expansion), operation, and decommissioning of research and development incinerators for any type of waste and of any other incinerators that would treat nonhazardous solid waste (as designated in 40 CFR 261.4(b)).
C16Large Waste Packaging and Storage Facilities
Siting, construction, modification to increase capacity, operation, and decommissioning of packaging and unpacking facilities (such as characterization operations) and large storage facilities (greater than approximately 50,000 square feet in area) for waste, except high-level radioactive waste, generated onsite or resulting from activities connected to site operations. These actions do not include storage, packaging, or unpacking of spent nuclear fuel. (See also B6.4, B6.5, B6.6, and B6.10 of appendix B.)