14 CFR 25.111 - Takeoff path.

Status message

There are 10 Updates appearing in the Federal Register for 14 CFR 25. View below or at eCFR (GPOAccess)
§ 25.111 Takeoff path.
(a) The takeoff path extends from a standing start to a point in the takeoff at which the airplane is 1,500 feet above the takeoff surface, or at which the transition from the takeoff to the en route configuration is completed and VFTO is reached, whichever point is higher. In addition—
(1) The takeoff path must be based on the procedures prescribed in § 25.101(f);
(2) The airplane must be accelerated on the ground to V EF, at which point the critical engine must be made inoperative and remain inoperative for the rest of the takeoff; and
(3) After reaching V EF, the airplane must be accelerated to V 2.
(b) During the acceleration to speed V 2, the nose gear may be raised off the ground at a speed not less than V R. However, landing gear retraction may not be begun until the airplane is airborne.
(c) During the takeoff path determination in accordance with paragraphs (a) and (b) of this section—
(1) The slope of the airborne part of the takeoff path must be positive at each point;
(2) The airplane must reach V 2 before it is 35 feet above the takeoff surface and must continue at a speed as close as practical to, but not less than V 2, until it is 400 feet above the takeoff surface;
(3) At each point along the takeoff path, starting at the point at which the airplane reaches 400 feet above the takeoff surface, the available gradient of climb may not be less than—
(i) 1.2 percent for two-engine airplanes;
(ii) 1.5 percent for three-engine airplanes; and
(iii) 1.7 percent for four-engine airplanes.
(4) The airplane configuration may not be changed, except for gear retraction and automatic propeller feathering, and no change in power or thrust that requires action by the pilot may be made until the airplane is 400 feet above the takeoff surface; and
(5) If § 25.105(a)(2) requires the takeoff path to be determined for flight in icing conditions, the airborne part of the takeoff must be based on the airplane drag:
(i) With the takeoff ice accretion defined in appendix C, from a height of 35 feet above the takeoff surface up to the point where the airplane is 400 feet above the takeoff surface; and
(ii) With the final takeoff ice accretion defined in appendix C, from the point where the airplane is 400 feet above the takeoff surface to the end of the takeoff path.
(d) The takeoff path must be determined by a continuous demonstrated takeoff or by synthesis from segments. If the takeoff path is determined by the segmental method—
(1) The segments must be clearly defined and must be related to the distinct changes in the configuration, power or thrust, and speed;
(2) The weight of the airplane, the configuration, and the power or thrust must be constant throughout each segment and must correspond to the most critical condition prevailing in the segment;
(3) The flight path must be based on the airplane's performance without ground effect; and
(4) The takeoff path data must be checked by continuous demonstrated takeoffs up to the point at which the airplane is out of ground effect and its speed is stabilized, to ensure that the path is conservative relative to the continous path.
The airplane is considered to be out of the ground effect when it reaches a height equal to its wing span.
(e) For airplanes equipped with standby power rocket engines, the takeoff path may be determined in accordance with section II of appendix E.
[Doc. No. 5066, 29 FR 18291, Dec. 24, 1964, as amended by Amdt. 25-6, 30 FR 8468, July 2, 1965; Amdt. 25-42, 43 FR 2321, Jan. 16, 1978; Amdt. 25-54, 45 FR 60172, Sept. 11, 1980; Amdt. 25-72, 55 FR 29774, July 20, 1990; Amdt. 25-94, 63 FR 8848, Feb. 23, 1998; Amdt. 25-108, 67 FR 70826, Nov. 26, 2002; Amdt. 25-115, 69 FR 40527, July 2, 2004; Amdt. 25-121, 72 FR 44666; Aug. 8, 2007]

Title 14 published on 2014-01-01

The following are only the Rules published in the Federal Register after the published date of Title 14.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-03-11; vol. 79 # 47 - Tuesday, March 11, 2014
    1. 79 FR 13515 - Requirements for Chemical Oxygen Generators Installed on Transport Category Airplanes
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Aviation Administration
      Final rule.
      This action becomes effective May 12, 2014.
      14 CFR Part 25

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 14 published on 2014-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 14 CFR 25 after this date.

  • 2014-03-11; vol. 79 # 47 - Tuesday, March 11, 2014
    1. 79 FR 13515 - Requirements for Chemical Oxygen Generators Installed on Transport Category Airplanes
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Aviation Administration
      Final rule.
      This action becomes effective May 12, 2014.
      14 CFR Part 25