(a) An environmental assessment will normally be prepared first for the actions identified in this section. Depending on the outcome of the environmental assessment, the Commission may or may not prepare an environmental impact statement. However, depending on the location or scope of the proposed action, or the resources affected, the Commission may in specific circumstances proceed directly to prepare an environmental impact statement.
(b) The projects subject to an environmental assessment are as follows:
(1) Except as identified in §§ 380.4, 380.6 and 2.55 of this chapter, authorization for the site of new gas import/export facilities under DOE Delegation No. 0204-112 and authorization under section 7 of the Natural Gas Act for the construction, replacement, or abandonment of compression, processing, or interconnecting facilities, onshore and offshore pipelines, metering facilities, LNG peak-shaving facilities, or other facilities necessary for the sale, exchange, storage, or transportation of natural gas;
(2) Prior notice filings under § 157.208 of this chapter for the rearrangement of any facility specified in §§ 157.202 (b)(3) and (6) of this chapter or the acquisition, construction, or operation of any eligible facility as specified in §§ 157.202 (b)(2) and (3) of this chapter ;
(3) Abandonment or reduction of natural gas service under section 7 of the Natural Gas Act unless excluded under § 380.4 (a)(21), (28) or (29) ;
(4) Except as identified in § 380.6, conversion of existing depleted oil or natural gas fields to underground storage fields under section 7 of the Natural Gas Act.
(5) New natural gas curtailment plans, or any amendment to an existing curtailment plan under section 4 of the Natural Gas Act and sections 401 through 404 of the Natural Gas Policy Act of 1978 that has a major effect on an entire pipeline system;
(6) Licenses under Part I of the Federal Power Act and part 4 of this chapter for construction of any water power project—existing dam;
(7) Exemptions under section 405 of the Public Utility Regulatory Policies Act of 1978, as amended, and §§ 4.30(b)(29) and 4.101-4.108 of this chapter for small hydroelectric power projects of 5 MW or less;
(8) Licenses for additional project works at licensed projects under Part I of the Federal Power Act whether or not these are styled license amendments or original licenses;
(9) Licenses under Part I of the Federal Power Act and part 4 of this chapter for transmission lines only;
(10) Applications for new licenses under section 15 of the Federal Power Act;
(11) Approval of electric interconnections and wheeling under section 202(b), 210, 211, and 212 of the Federal Power Act, unless excluded under § 380.4(a)(17) ;
(12) Regulations or proposals for legislation not included under § 380.4(a)(2) ;
(13) Surrender of water power licenses and exemptions where project works exist or ground disturbing activity has occurred and amendments to water power licenses and exemptions that require ground disturbing activity or changes to project works or operations; and
(14) Except as identified in § 380.6, authorization to site new electric transmission facilities under section 216 of the Federal Power Act and DOE Delegation Order No. 00-004.00A.
[Order 486, 52 FR 47910, Dec. 17, 1987; Order 486, 53 FR 4817, Feb. 17, 1988, as amended by 53 FR 8177, Mar. 14, 1988; Order 486-B, 53 FR 26437, July 13, 1988; Order 689, 71 FR 69470, Dec. 1, 2006; Order 756, 77 FR 4895, Feb. 1, 2012]
Title 18 published on 2012-04-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
Executive Order ... 12009
Title 18 published on 2012-04-01
The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 18 CFR 380after this date.
DEPARTMENT OF ENERGY, Federal Energy Regulatory Commission
Notice of Proposed Rulemaking.
Comments are due March 5, 2013.
18 CFR Parts 2 and 380
The Natural Gas Act (NGA) requires that prior to the construction or extension of any natural gas facilities, the Federal Energy Regulatory Commission (Commission) must issue a certificate that authorizes a natural gas company to undertake the proposed activity. However, under the Commission's regulations, the construction of auxiliary installations or replacement facilities, while subject to the Commission's NGA jurisdiction, are not treated as the construction or extension of facilities, and thus do not require certificate authorization. The Commission proposes to revise its regulations to clarify that all activities related to the construction of auxiliary installations and replacement facilities must take place within a company's certificated right-of-way using previously approved work spaces. In addition, the Commission proposes to add landowner notification requirements for auxiliary installations, replacement facilities, and other jurisdictional activities performed within the right-of-way.