18 CFR 4.81 - Contents of application.

Status message

There are 2 Updates appearing in the Federal Register for 18 CFR 4. View below or at eCFR (GPOAccess)
§ 4.81 Contents of application.
Each application for a preliminary permit must include the following initial statement and numbered exhibits containing the information and documents specified:
(a) Initial statement:
Before the Federal Energy Regulatory Commission
Application for Preliminary Permit
(1) [Name of applicant] applies to the Federal Energy Regulatory Commission for a preliminary permit for the proposed [name of project] water power project, as described in the attached exhibits. This application is made in order that the applicant may secure and maintain priority of application for a license for the project under Part I of the Federal Power Act while obtaining the data and performing the acts required to determine the feasibility of the project and to support an application for a license.
(2) The location of the proposed project is:
State or territory:
County:
Township or nearby town:
Stream or other body of water:
(3) The exact name, business address, and telephone number of the applicant are:
The exact name and business address of each person authorized to act as agent for the applicant in this application are:
(4) [Name of applicant] is a [citizen, association, citizens, domestic corporation, municipality, or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power Act. [If the applicant is a municipality, the applicant must submit copies of applicable state or local laws or a municipal charter or, if such laws or documents are not clear, any other appropriate legal authority, evidencing that the municipality is competent under such laws to engage in the business of development, transmitting, utilizing, or distributing power].
(5) The proposed term of the requested permit is [period not to exceed 36 months].
(6) If there is any existing dam or other project facility, the applicant must provide the name and address of the owner of the dam and facility. If the dam is federally owned or operated, provide the name of the agency.
(b) Exhibit 1 must contain a description of the proposed project, specifying and including, to the extent possible:
(1) The number, physical composition, dimensions, general configuration and, where applicable, age and condition, of any dams, spillways, penstocks, powerhouses, tailraces, or other structures, whether existing or proposed, that would be part of the project;
(2) The estimated number, surface area, storage capacity, and normal maximum surface elevation (mean sea level) of any reservoirs, whether existing or proposed, that would be part of the project;
(3) The estimated number, length, voltage, interconnections, and, where applicable, age and condition, of any primary transmission lines whether existing or proposed, that would be part of the project [see 16 U.S.C. 796(11)];
(4) The total estimated average annual energy production and installed capacity (provide only one energy and capacity value), the hydraulic head for estimating capacity and energy output, and the estimated number, rated capacity, and, where applicable, the age and condition, of any turbines and generators, whether existing or proposed, that would be part of the project works;
(5) All lands of the United States that are enclosed within the proposed project boundary described under paragraph (d)(3)(i) of this section, identified and tabulated on a separate sheet by legal subdivisions of a public land survey of the affected area, if available. If the project boundary includes lands of the United States, such lands must be identified on a completed land description form (FERC Form 587), provided by the Commission. The project location must identify any Federal reservation, Federal tracts, and townships of the public land surveys (or official protractions thereof if unsurveyed). A copy of the form must also be sent to the Bureau of Land Management state office where the project is located;
(6) Any other information demonstrating in what manner the proposed project would develop, conserve, and utilize in the public interest the water resources of the region.
(c) Exhibit 2 is a description of studies conducted or to be conducted with respect to the proposed project, including field studies. Exhibit 2 must supply the following information:
(1) General requirement. For any proposed project, a study plan containing a description of:
(i) Any studies, investigations, tests, or surveys that are proposed to be carried out, and any that have already taken place, for the purposes of determining the technical, economic, and financial feasibility of the proposed project, taking into consideration its environmental impacts, and of preparing an application for a license for the project; and
(ii) The approximate locations and nature of any new roads that would be built for the purpose of conducting the studies; and
(2) Work plan for new dam construction. For any development within the project that would entail new dam construction, a work plan and schedule containing:
(i) A description, including the approximate location, of any field study, test, or other activity that may alter or disturb lands or waters in the vicinity of the proposed project, including floodplains and wetlands; measures that would be taken to minimize any such disturbance; and measures that would be taken to restore the altered or disturbed areas; and
(ii) A proposed schedule (a chart or graph may be used), the total duration of which does not exceed the proposed term of the permit, showing the intervals at which the studies, investigations, tests, and surveys, identified under this paragraph are proposed to be completed.
(iii) For purposes of this paragraph, new dam construction means any dam construction the studies for which would require test pits, borings, or other foundation exploration in the field.
(3) Waiver. The Commission may waive the requirements of paragraph (c)(2) pursuant to § 385.207 of this chapter, upon a showing by the applicant that the field studies, tests, and other activities to be conducted under the permit would not adversely affect cultural resources or endangered species and would cause only minor alterations or disturbances of lands and waters, and that any land altered or disturbed would be adequately restored.
(4) Exhibit 2 must contain a statement of costs and financing, specifying and including, to the extent possible:
(i) The estimated costs of carrying out or preparing the studies, investigations, tests, surveys, maps, plans or specifications identified under paragraph (c) of this section;
(ii) The expected sources and extent of financing available to the applicant to carry out or prepare the studies, investigations, tests, surveys, maps, plans, or specifications identified under paragraph (c) of this section; and
(d) Exhibit 3 must include a map or series of maps, to be prepared on United States Geological Survey topographic quadrangle sheets or similar topographic maps of a State agency, if available. The maps need not conform to the precise specifications of § 4.39 (a) and (b). If the scale of any base map is not sufficient to show clearly and legibly all of the information required by this paragraph, the maps submitted must be enlarged to a scale that is adequate for that purpose. (If Exhibit 3 comprises a series of maps, it must also include an index sheet showing, by outline, the parts of the entire project covered by each map of the series.) The maps must show:
(1) The location of the project as a whole with reference to the affected stream or other body of water and, if possible, to a nearby town or any permanent monuments or objects that can be noted on the maps and recognized in the field;
(2) The relative locations and physical interrelationships of the principal project features identified under paragraph (b) of this section;
(3) A proposed boundary for the project, enclosing:
(i) All principal project features identified under paragraph (b) of this section, including but not limited to any dam, reservoir, water conveyance facilities, powerplant, transmission lines, and other appurtenances; if the project is located at an existing Federal dam, the Federal dam and impoundment must be shown, but may not be included within the project boundary;
(ii) Any non-Federal lands and any public lands or reservations of the United States [see 16 U.S.C. 796 (1) and (2)] necessary for the purposes of the project. To the extent that those public lands or reservations are covered by a public land survey, the project boundary must enclose each of and only the smallest legal subdivisions (quarter-quarter section, lots, or other subdivisions, identified on the map by subdivision) that may be occupied in whole or in part by the project.
(4) Areas within or in the vicinity of the proposed project boundary which are included in or have been designated for study for inclusion in the National Wild and Scenic Rivers System; and
(5) Areas within the project boundary that, under the provisions of the Wilderness Act, have been:
(i) Designated as wilderness area;
(ii) Recommended for designation as wilderness area; or
(iii) Designated as wilderness study area.
(Federal Power Act, as amended, 16 U.S.C. 792-828c (1976); Department of Energy Organization Act, 42 U.S.C. 7101-7352 (Supp. IV 1980); E.O. 12009, 3 CFR part 142 (1978); 5 U.S.C. 553 (Supp. IV 1980))
[Order 54, 44 FR 61336, Oct. 25, 1979, as amended by Order 123, 46 FR 9029, Jan. 28, 1981; 46 FR 11811, Feb. 11, 1981; Order 225, 47 FR 19056, May 3, 1982; Order 413, 50 FR 11685, Mar. 25, 1985; Order 2002, 68 FR 51120, Aug. 25, 2003; Order 655, 70 FR 33828, June 10, 2005; Order 699, 72 FR 45324, Aug. 14, 2007; Order 756, 77 FR 4894, Feb. 1, 2012]

Title 18 published on 2014-04-01

The following are only the Rules published in the Federal Register after the published date of Title 18.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-10-01; vol. 79 # 190 - Wednesday, October 1, 2014
    1. 79 FR 59105 - Revisions and Technical Corrections To Conform the Commission's Regulations to the Hydropower Regulatory Efficiency Act of 2013
      GPO FDSys XML | Text
      DEPARTMENT OF ENERGY, Federal Energy Regulatory Commission
      Final rule.
      Effective Date: This rule will become effective February 23, 2015.
      18 CFR Parts 4 and 380

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 16 - CONSERVATION
U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE

§ 7101 - Definitions

§ 7111 - Congressional findings

§ 7112 - Congressional declaration of purpose

§ 7113 - Relationship with States

§ 7131 - Establishment

§ 7132 - Principal officers

§ 7133 - Assistant Secretaries; appointment and confirmation; identification of responsibilities

§ 7134 - Federal Energy Regulatory Commission; compensation of Chairman and members

§ 7135 - Energy Information Administration

§ 7135a - Delegation by Secretary of Energy of energy research, etc., functions to Administrator of Energy Information...Administration; prohibition against required delegation; utilization of capabilities by Secretary

§ 7136 - Economic Regulatory Administration; appointment of Administrator; compensation; qualifications; functions

§ 7137 - Functions of Comptroller General

§ 7138 - Repealed.

§ 7139 - Office of Science; establishment; appointment of Director; compensation; duties

§ 7140 - Leasing Liaison Committee; establishment; composition

§ 7141 - Office of Minority Economic Impact

§ 7142 - National Atomic Museum and National Atomic Testing Museum

§ 7142a - Designation of American Museum of Science and Energy

§ 7142b - Authority

§ 7142c - Museum volunteers

§ 7142d - Definitions

§ 7143 - Repealed.

§ 7144 - Establishment of policy for National Nuclear Security Administration

§ 7144a - Establishment of security, counterintelligence, and intelligence policies

§ 7144b - Office of Counterintelligence

§ 7144c - Office of Intelligence

§ 7144d - Office of Arctic Energy

§ 7144e - Office of Indian Energy Policy and Programs

§ 7151 - General transfers

§ 7151a - Jurisdiction over matters transferred from Energy Research and Development Administration

§ 7152 - Transfers from Department of the Interior

§ 7153 - Administration of leasing transfers

§ 7154 - Transfers from Department of Housing and Urban Development

§ 7155 - Repealed.

§ 7156 - Transfers from Department of the Navy

§ 7156a - Repealed.

§ 7157 - Transfers from Department of Commerce

§ 7158 - Naval reactor and military application programs

§ 7159 - Transfer to Department of Transportation

§ 7171 - Appointment and administration

§ 7172 - Jurisdiction of Commission

§ 7173 - Initiation of rulemaking procedures before Commission

§ 7174 - Referral of other rulemaking proceedings to Commission

§ 7175 - Right of Secretary to intervene in Commission proceedings

§ 7176 - Reorganization

§ 7177 - Access to information

§ 7178 - Federal Energy Regulatory Commission fees and annual charges

§ 7191 - Procedures for issuance of rules, regulations, or orders

§ 7192 - Judicial review

§ 7193 - Remedial orders

§ 7194 - Requests for adjustments

§ 7195 - Report to Congress; contents

§ 7211, 7212 - Repealed.

§ 7213 to 7217 - Repealed.

§ 7218 - Repealed.

§ 7231 - Officers and employees

§ 7232 - Senior positions

§ 7233 - Experts and consultants

§ 7234 - Advisory committees

§ 7235 - Armed services personnel

§ 7236 - Transferred

§ 7237 - Priority placement, job placement, retraining, and counseling programs for United States Department of Energy employees affected by reduction in force

§ 7238 - Temporary appointments for scientific and technical experts in Department of Energy research and development programs

§ 7239 - Transferred

§ 7251 - General authority

§ 7252 - Delegation

§ 7253 - Reorganization

§ 7254 - Rules and regulations

§ 7255 - Subpoena

§ 7256 - Contracts, leases, etc., with public agencies and private organizations and persons

§ 7256a, 7256b - Transferred

§ 7257 - Acquisition, construction, etc., of laboratories, research and testing sites, etc.

§ 7257a to 7257c - Transferred

§ 7257d - Expanded research by Secretary of Energy

§ 7258 - Facilities construction

§ 7259 - Use of facilities

§ 7259a - Activities of Department of Energy facilities

§ 7260 - Field offices

§ 7261 - Acquisition of copyrights, patents, etc.

§ 7261a - Protection of sensitive technical information

§ 7261b - Technology transfer to small businesses

§ 7261c - Technology partnerships ombudsman

§ 7262 - Repealed.

§ 7263 - Capital fund

§ 7264 - Seal of Department

§ 7265 - Regional Energy Advisory Boards

§ 7266 - Designation of conservation officers

§ 7267 - Annual report

§ 7268 - Leasing report

§ 7269 - Transfer of funds

§ 7269a - Repealed.

§ 7269b - Transfer of unexpended appropriation balances

§ 7269c - Funding for Department of Energy activities not included in Fossil Energy account

§ 7270 - Authorization of appropriations

§ 7270a - Guards for Strategic Petroleum Reserve facilities

§ 7270b - Trespass on Strategic Petroleum Reserve facilities

§ 7270c - Annual assessment and report on vulnerability of facilities to terrorist attack

§ 7271 - Transferred

§ 7271a - Repealed.

§ 7271b - Repealed.

§ 7271c - Repealed.

§ 7271d to 7273a - Transferred

§ 7273b - Security investigations

§ 7273c - Transferred

§ 7274 - Environmental impact statements relating to defense facilities of Department of Energy

§ 7274a to 7274d - Transferred

§ 7274e - Scholarship and fellowship program for environmental restoration and waste management

§ 7274f - Transferred

§ 7274g - Environmental restoration and waste management five-year plan and budget reports

§ 7274h, 7274i - Transferred

§ 7274j - Repealed.

§ 7274k - Transferred

42 U.S. Code § -

42 U.S. Code § -

§ 7274p - Transferred

§ 7274q - Transferred

§ 7274r - Transferred

§ 7274s - Transferred

§ 7275 - Definitions

§ 7276 - Regulations to require integrated resource planning

§ 7276a - Technical assistance

§ 7276b - Integrated resource plans

§ 7276c - Miscellaneous provisions

§ 7276d - Property protection program for power marketing administrations

§ 7276e - Provision of rewards

§ 7276f - Western Area Power Administration; deposit and availability of discretionary offsetting collections

§ 7276g - Western Area Power Administration; deposit and availability of funds related to Falcon and Amistad Dams

§ 7277 - Report concerning review of United States coal imports

§ 7278 - Availability of appropriations for Department of Energy for transportation, uniforms, security, and price support and loan guarantee programs; transfer of funds; acceptance of contributions

§ 7279 - Identification in budget materials of amounts for certain Department of Energy pension obligations

§ 7279a - Future-years energy program annual submission and budgeting

§ 7291 - Transfer and allocations of appropriations and personnel

§ 7292 - Effect on personnel

§ 7293 - Agency terminations

§ 7294 - Incidental transfers

§ 7295 - Savings provisions

§ 7296 - Separability

§ 7297 - Cross references

§ 7298 - Presidential authority

§ 7299 - Transition

§ 7300 - Report to Congress; effect on personnel

§ 7301 - Environmental impact statements

§ 7321 - National Energy Policy Plan

§ 7322 - Congressional review

§ 7341 - Effective date

§ 7342 - Interim appointments

§ 7351 - Submission of comprehensive review

§ 7352 - Contents of review

Title 18 published on 2014-04-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 18 CFR 4 after this date.

  • 2014-10-01; vol. 79 # 190 - Wednesday, October 1, 2014
    1. 79 FR 59105 - Revisions and Technical Corrections To Conform the Commission's Regulations to the Hydropower Regulatory Efficiency Act of 2013
      GPO FDSys XML | Text
      DEPARTMENT OF ENERGY, Federal Energy Regulatory Commission
      Final rule.
      Effective Date: This rule will become effective February 23, 2015.
      18 CFR Parts 4 and 380