(a) Prior to submission of an application pursuant to § 806.13, a project sponsor seeking approval to withdraw or increase a withdrawal of groundwater shall perform a constant-rate aquifer test in accordance with this section.
(b) The project sponsor shall prepare a constant-rate aquifer test plan for prior review and approval by Commission staff before testing is undertaken. Such plan shall include a groundwater availability analysis to determine the availability of water during a 1-in-10-year recurrence interval.
(c) Unless otherwise specified, approval of a test plan is valid for two years from the date of approval.
(d) Approval of a test plan shall not be construed to limit the authority of the Commission to require additional testing or monitoring.
(e) The project sponsor may be required, at its expense, to provide temporary water supply if an aquifer test results in interference with an existing water use.

Title 18 published on 2014-04-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


Statutes at Large
Public Laws

91-575

Title 18 published on 2014-04-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 18 CFR 806 after this date.

  • 2014-09-26; vol. 79 # 187 - Friday, September 26, 2014
    1. 79 FR 57850 - Review and Approval of Projects
      GPO FDSys XML | Text
      SUSQUEHANNA RIVER BASIN COMMISSION
      Notice of proposed rulemaking and public hearing.
      Comments on these proposed rules may be submitted to the Commission on or before November 17, 2014. The Commission has scheduled a public hearing on the proposed rulemaking, to be held November 6, 2014, in Harrisburg, Pennsylvania. The location of the public hearing is listed in the ADDRESSES section of this document.
      18 CFR Part 806