21 CFR 26.14 - Transmission of preapproval inspection reports.

§ 26.14 Transmission of preapproval inspection reports.
(a) A preliminary notification that an inspection may have to take place will be made as soon as possible.
(b) Within 15-calendar days, the relevant authority will acknowledge receipt of the request and confirm its ability to carry out the inspection. In the European Community (EC), requests will be sent directly to the relevant authority, with a copy to the European Agency for the Evaluation of Medicinal Products (EMEA). If the authority receiving the request cannot carry out the inspection as requested, the requesting authority shall have the right to conduct the inspection.
(c) Reports of preapproval inspections will be sent within 45-calendar days of the request that transmitted the appropriate information and detailed the precise issues to be addressed during the inspection. A shorter time may be necessary in exceptional cases and these will be described in the request.

Title 21 published on 2013-04-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 5 - GOVERNMENT ORGANIZATION AND EMPLOYEES
U.S. Code: Title 15 - COMMERCE AND TRADE
U.S. Code: Title 18 - CRIMES AND CRIMINAL PROCEDURE
U.S. Code: Title 21 - FOOD AND DRUGS
U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE