21 CFR 58.31 - Testing facility management.

§ 58.31 Testing facility management.
For each nonclinical laboratory study, testing facility management shall:
(a) Designate a study director as described in § 58.33, before the study is initiated.
(b) Replace the study director promptly if it becomes necessary to do so during the conduct of a study.
(c) Assure that there is a quality assurance unit as described in § 58.35.
(d) Assure that test and control articles or mixtures have been appropriately tested for identity, strength, purity, stability, and uniformity, as applicable.
(e) Assure that personnel, resources, facilities, equipment, materials, and methodologies are available as scheduled.
(f) Assure that personnel clearly understand the functions they are to perform.
(g) Assure that any deviations from these regulations reported by the quality assurance unit are communicated to the study director and corrective actions are taken and documented.
[43 FR 60013, Dec. 22, 1978, as amended at 52 FR 33780, Sept. 4, 1987]

Title 21 published on 2013-04-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code