24 CFR 242.48 - Insured advances for certain equipment and long lead items.

§ 242.48 Insured advances for certain equipment and long lead items.
The Commissioner may allow advances for certain pieces of equipment or other construction materials for which a manufacturer, fabricator, or other source requires an interim payment(s) in order to assure the timely manufacture or fabrication and delivery to the project site. Such advances can be made only if a bill of sale or an invoice describes the material or equipment and its completion and delivery dates in no uncertain terms, and that such displayed timetable is necessary to meet the requirements of the overall construction schedule cited in the construction contract.

Title 24 published on 2014-04-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code