24 CFR § 965.407 - Reevaluations of mastermeter systems.

prev | next
§ 965.407 Reevaluations of mastermeter systems.

Because of changes in the cost of utility services and the periodic changes in utility regulations, PHAs with mastermeter systems are required to reevaluate mastermeter systems without checkmeters by making benefit/cost analyses at least every 5 years. These analyses may be omitted under the conditions specified in § 965.406.