25 CFR 169.8 - Public survey.

§ 169.8 Public survey.
(a) The terminal of the line of route shall be fixed by reference of course and distance to the nearest existing corner of the public survey. The maps, as well as the engineer's affidavit and the certificate, shall show these connections.
(b) When either terminal of the line of route is upon unsurveyed land, it must be connected by traverse with an established corner of the public survey if not more than 6 miles distant from it, and the single bearing and distance from the terminal point to the corner computed and noted on the maps, in the engineer's affidavit, and in the certificate. The notes and all data for the computation of the traverse must be given.

Title 25 published on 2014-04-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 25 published on 2014-04-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 25 CFR 169 after this date.

  • 2014-11-04; vol. 79 # 213 - Tuesday, November 4, 2014
    1. 79 FR 65360 - Rights-of-Way on Indian Land
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Indian Affairs
      Proposed rule; Extension of comment period.
      Comments on the proposed rule published June 17, 2014 (79 FR 34455) must be received by November 28, 2014.
      25 CFR Part 169