29 CFR 1926.1400 - Scope.
Title 29 published on 2012-07-01
The following are only the Rules published in the Federal Register after the published date of Title 29.
For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-01416 RIN 1218-AC20 Docket No. H022K) DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule: correction and technical amendment. Effective: February 8, 2013. 29 CFR Parts 1910, 1915, and 1926 OSHA is correcting its regulations that were amended by the Hazard Communication Standard final rule, published in the Federal Register on March 26, 2012. The majority of the corrections are to references inadvertently missed in the original publication of the final rule. Other corrections include correcting values or notations in tables, and updating references to terms.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-02777 RIN 1218-AC75 Docket No. OSHA-2012-0025 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Withdrawal of direct final rule. OSHA published the direct final rule for revising the exemption for digger derricks on November 9, 2012 (77 FR 67270), and is withdrawing that direct final rule as of February 7, 2013. 29 CFR Part 1926 OSHA published a direct final rule and a companion notice of proposed rulemaking on November 9, 2012, to broaden the exemption for digger derricks in its construction standard for cranes and derricks. OSHA received a significant adverse comment on the direct final rule and is, therefore, withdrawing the direct final rule. OSHA will issue a final rule at a later date based on the notice of proposed rulemaking.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27792 RIN 1218-AC65 Docket No. OSHA-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; confirmation of effective date. The direct final rule published on June 22, 2012 (77 FR 37587), was effective on September 20, 2012. For the purposes of judicial review, OSHA considers November 16, 2012, as the date of issuance. 29 CFR Parts 1910, 1915, 1917, 1918, and 1926 OSHA is confirming the effective date of its direct final rule that revises the Head Protection standards for general industry, shipyard employment, marine terminals, longshoring, and construction by updating the reference to a standard published by a standards-developing organization, the American National Standards Institute. In the June 22, 2012, direct final rule, OSHA stated that it would withdraw the companion proposed rule and confirm the effective date of the direct final rule if the Agency received no significant adverse comments. OSHA did not receive significant adverse comments on the direct final rule. Therefore, OSHA is confirming that the direct final rule became effective on September 20, 2012.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27210 RIN 1218-AC75 Docket No. ID-OSHA-2012-0025 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule. This direct final rule will become effective on February 7, 2013, unless OSHA receives significant adverse comment to this direct final rule by December 10, 2012. All submissions, whether transmitted, mailed, or delivered, must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 OSHA is broadening the exemption for digger derricks in its standard for cranes and derricks. OSHA issued a final standard updating the requirements for cranes and derricks on August 9, 2010, and the Edison Electric Institute (EEI) petitioned for review of the standard in the United States Court of Appeals. After petitioning, EEI provided OSHA with new information regarding digger derricks. OSHA reviewed the additional information and the rulemaking record, and decided to broaden the exemption for digger derricks used in the electric-utility industry by means of this direct final rule.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-24595 RIN 1218-AC20 Docket No. OSHA-H022K-2006-0062 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; notice of the Office of Management and Budget's (OMB) approval of information collection requirements. The collections of information contained in the final rule published March 26, 2012 (77 FR 17573) are effective October 15, 2012. 29 CFR Parts 1910, 1915, and 1926 The Occupational Safety and Health Administration (OSHA) is announcing that the Office of Management and Budget (OMB) approved the revised information collection requirements contained in the Hazard Communication Standard (HCS) (29 CFR parts 1910, 1915, and 1926) under the Paperwork Reduction Act of 1995 (PRA-95). The OMB control number is 1218-0072.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-20171 RIN 1218-AC61 Docket No. ID-OSHA-2007-0066 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule. This direct final rule will become effective on November 15, 2012 unless OSHA receives a significant adverse comment to this direct final rule or the companion proposal by September 17, 2012. If OSHA receives adverse comment, it will publish a timely withdrawal of the rule in the Federal Register . Submit comments to this direct final rule, including comments to the information-collection (paperwork) determination (described under the section titled AGENCY DETERMINATIONS), hearing requests, and other information by September 17, 2012. All submissions must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 On August 9, 2010, OSHA issued a final standard updating the requirements for cranes and derricks used in construction work. For most construction work, the final rule replaced a prior cranes and derricks standard. However, the prior standard continues to apply to demolition and underground construction work. Through this direct final rule, OSHA is applying the updated requirements to that work. With this direct final rule, OSHA also is correcting inadvertent errors made to the demolition and underground construction standards when it issued the final rule for cranes and derricks in construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-19077 RIN Docket No. OSHA-2006-0049 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; correction and technical amendment. The effective date for the corrections and technical amendment to the standards is August 7, 2012. 29 CFR Parts 1910 and 1926 OSHA is correcting the medical evaluation questionnaire in Appendix C of its Respiratory Protection standard by removing the term “fits” in a question. OSHA also is correcting its Mechanical Power Presses standard for general industry by restoring requirements that were removed inadvertently from the regulatory text. Finally, the Agency is correcting a cross reference made in two paragraphs in Appendix A to subpart L of its scaffold standards for construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-17872 RIN 1218-AC65 Docket No. OSHA-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule; correction. This correction to the direct final rule will become effective on September 20, 2012. 29 CFR Part 1926 OSHA is correcting a direct final rule (DFR) with regard to the construction industry head protection standards to eliminate confusion resulting from a drafting error. OSHA published the DFR on June 22, 2012 (77 FR 37587). OSHA also is publishing a correction to the proposed rule that it published the same day in the Federal Register (77 FR 37617).
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
§ 553 - Rule making
§ 653 - Geographic applicability; judicial enforcement; applicability to existing standards; report to Congress on duplication and coordination of Federal laws; workmen’s compensation...statutory rights, duties, or liabilities of employers and empl
§ 655 - Standards
§ 655 note - Standards
§ 3701 - Definition and application
§ 4853 - Worker protection
Title 29 published on 2012-07-01
The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 29 CFR 1926 after this date.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-09153 RIN 1218-AC61 Docket No. OSHA-2007-0066 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule. This final rule is effective May 23, 2013. Petitions for review of the final rule are due on June 24, 2013. 29 CFR Part 1926 On August 17, 2012, OSHA issued a notice of proposed rulemaking, as well as a companion direct final rule, that proposed applying the requirements in OSHA's 2010 cranes and derricks construction standard to underground construction work and demolition work. The notice of proposed rulemaking also proposed to correct inadvertent errors in the underground construction and demolition standards. After receiving a comment recommending that OSHA clarify the proposed regulatory text of the demolition standard, OSHA clarified the text and is issuing this final rule to apply the cranes and derricks standard to underground construction work and demolition work.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-01416 RIN 1218-AC20 Docket No. H022K) DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule: correction and technical amendment. Effective: February 8, 2013. 29 CFR Parts 1910, 1915, and 1926 OSHA is correcting its regulations that were amended by the Hazard Communication Standard final rule, published in the Federal Register on March 26, 2012. The majority of the corrections are to references inadvertently missed in the original publication of the final rule. Other corrections include correcting values or notations in tables, and updating references to terms.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-02777 RIN 1218-AC75 Docket No. OSHA-2012-0025 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Withdrawal of direct final rule. OSHA published the direct final rule for revising the exemption for digger derricks on November 9, 2012 (77 FR 67270), and is withdrawing that direct final rule as of February 7, 2013. 29 CFR Part 1926 OSHA published a direct final rule and a companion notice of proposed rulemaking on November 9, 2012, to broaden the exemption for digger derricks in its construction standard for cranes and derricks. OSHA received a significant adverse comment on the direct final rule and is, therefore, withdrawing the direct final rule. OSHA will issue a final rule at a later date based on the notice of proposed rulemaking.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-29514 RIN 1218-AC67 Docket No. OSHA-2012-0007 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Request for information. Submit comments and additional material by February 4, 2013. All submissions must bear a postmark or provide other evidence of the submission date. 29 CFR Parts 1910 and 1926 OSHA is initiating a regulatory review of its existing safety and health standards in response to the President's Executive Order 13563, “Improving Regulations and Regulatory Review” (76 FR 38210). The Agency conducted similar regulatory reviews of its existing standards previously as “standards improvement projects.” OSHA is issuing this request for information to initiate another of these regulatory reviews, and naming this review the Standards Improvement Project—Phase IV (SIP-IV). The purpose of SIP-IV is to improve and streamline OSHA standards by removing or revising requirements that are confusing or outdated, or that duplicate, or are inconsistent with, other standards. The purpose of the regulatory review is to reduce regulatory burden while maintaining or enhancing employees' safety and health. SIP-IV will focus primarily on OSHA's construction standards. The purpose of this notice is to invite the public, including employers, employees, and employee representatives involved in the construction industry, to submit recommendations for revisions to existing construction standards, including the rationale for these recommendations. OSHA will review this information to determine the need for, and the content of, any subsequent SIP-IV rulemaking.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27792 RIN 1218-AC65 Docket No. OSHA-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; confirmation of effective date. The direct final rule published on June 22, 2012 (77 FR 37587), was effective on September 20, 2012. For the purposes of judicial review, OSHA considers November 16, 2012, as the date of issuance. 29 CFR Parts 1910, 1915, 1917, 1918, and 1926 OSHA is confirming the effective date of its direct final rule that revises the Head Protection standards for general industry, shipyard employment, marine terminals, longshoring, and construction by updating the reference to a standard published by a standards-developing organization, the American National Standards Institute. In the June 22, 2012, direct final rule, OSHA stated that it would withdraw the companion proposed rule and confirm the effective date of the direct final rule if the Agency received no significant adverse comments. OSHA did not receive significant adverse comments on the direct final rule. Therefore, OSHA is confirming that the direct final rule became effective on September 20, 2012.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27791 RIN 1218-AC65 Docket No. OSH-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Proposed rule; withdrawal. Effective November 16, 2012, the proposed rule published June 22, 2012 (77 FR 37617), is withdrawn. 29 CFR Parts 1910, 1915, 1917, 1918, and 1926 With this notice, OSHA is withdrawing the proposed rule that accompanied its direct-final rule revising its Head Protection standards for general industry, shipyard employment, marine terminals, longshoring, and construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27210 RIN 1218-AC75 Docket No. ID-OSHA-2012-0025 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule. This direct final rule will become effective on February 7, 2013, unless OSHA receives significant adverse comment to this direct final rule by December 10, 2012. All submissions, whether transmitted, mailed, or delivered, must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 OSHA is broadening the exemption for digger derricks in its standard for cranes and derricks. OSHA issued a final standard updating the requirements for cranes and derricks on August 9, 2010, and the Edison Electric Institute (EEI) petitioned for review of the standard in the United States Court of Appeals. After petitioning, EEI provided OSHA with new information regarding digger derricks. OSHA reviewed the additional information and the rulemaking record, and decided to broaden the exemption for digger derricks used in the electric-utility industry by means of this direct final rule.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-27209 RIN 1218-AC75 Docket No. ID-OSHA-2012-0025 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Notice of proposed rulemaking. Comment by December 10, 2012. All submissions, whether transmitted, mailed, or delivered, must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 OSHA is broadening the exemption for digger derricks in its standard for cranes and derricks. OSHA issued a final standard updating the requirements for cranes and derricks on August 9, 2010, and the Edison Electric Institute (EEI) petitioned for review of the standard in the United States Court of Appeals. After petitioning, EEI provided OSHA with new information regarding digger derricks. OSHA reviewed the additional information and the rulemaking record, and decided to broaden the exemption for digger derricks used in the electric-utility industry by means of this proposed rule.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-24595 RIN 1218-AC20 Docket No. OSHA-H022K-2006-0062 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; notice of the Office of Management and Budget's (OMB) approval of information collection requirements. The collections of information contained in the final rule published March 26, 2012 (77 FR 17573) are effective October 15, 2012. 29 CFR Parts 1910, 1915, and 1926 The Occupational Safety and Health Administration (OSHA) is announcing that the Office of Management and Budget (OMB) approved the revised information collection requirements contained in the Hazard Communication Standard (HCS) (29 CFR parts 1910, 1915, and 1926) under the Paperwork Reduction Act of 1995 (PRA-95). The OMB control number is 1218-0072.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-20171 RIN 1218-AC61 Docket No. ID-OSHA-2007-0066 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule. This direct final rule will become effective on November 15, 2012 unless OSHA receives a significant adverse comment to this direct final rule or the companion proposal by September 17, 2012. If OSHA receives adverse comment, it will publish a timely withdrawal of the rule in the Federal Register . Submit comments to this direct final rule, including comments to the information-collection (paperwork) determination (described under the section titled AGENCY DETERMINATIONS), hearing requests, and other information by September 17, 2012. All submissions must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 On August 9, 2010, OSHA issued a final standard updating the requirements for cranes and derricks used in construction work. For most construction work, the final rule replaced a prior cranes and derricks standard. However, the prior standard continues to apply to demolition and underground construction work. Through this direct final rule, OSHA is applying the updated requirements to that work. With this direct final rule, OSHA also is correcting inadvertent errors made to the demolition and underground construction standards when it issued the final rule for cranes and derricks in construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-20170 RIN 1218-AC61 Docket No. ID-OSHA-2007-0066 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Notice of proposed rulemaking. Submit comments to this proposed rule, including comments to the information-collection (paperwork) determination (described under the section titled AGENCY DETERMINATIONS), hearing requests, and other information by September 17, 2012. All submissions must bear a postmark or provide other evidence of the submission date. 29 CFR Part 1926 On August 9, 2010, OSHA issued a final standard updating the requirements for cranes and derricks used in construction work. For most construction work, the final rule replaced a prior cranes and derricks standard. However, the prior standard continues to apply to demolition and underground construction work. Through this proposed rule, OSHA is proposing to apply the updated requirements to that work. With this proposed rule, OSHA also is proposing to correct inadvertent errors made to the demolition and underground construction standards when it issued the final rule for cranes and derricks in construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-19077 RIN Docket No. OSHA-2006-0049 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Final rule; correction and technical amendment. The effective date for the corrections and technical amendment to the standards is August 7, 2012. 29 CFR Parts 1910 and 1926 OSHA is correcting the medical evaluation questionnaire in Appendix C of its Respiratory Protection standard by removing the term “fits” in a question. OSHA also is correcting its Mechanical Power Presses standard for general industry by restoring requirements that were removed inadvertently from the regulatory text. Finally, the Agency is correcting a cross reference made in two paragraphs in Appendix A to subpart L of its scaffold standards for construction.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-17872 RIN 1218-AC65 Docket No. OSHA-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Direct final rule; correction. This correction to the direct final rule will become effective on September 20, 2012. 29 CFR Part 1926 OSHA is correcting a direct final rule (DFR) with regard to the construction industry head protection standards to eliminate confusion resulting from a drafting error. OSHA published the DFR on June 22, 2012 (77 FR 37587). OSHA also is publishing a correction to the proposed rule that it published the same day in the Federal Register (77 FR 37617).
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-17871 RIN 1218-AC65 Docket No. OSHA-2011-0184 DEPARTMENT OF LABOR, Occupational Safety and Health Administration Notice of proposed rulemaking; correction. 29 CFR Part 1926 OSHA is correcting a notice of proposed rulemaking (NPRM) with regard to the construction industry head protection standards to eliminate confusion resulting from a drafting error. OSHA published the NPRM on June 22, 2012 (77 FR 37617). OSHA also is publishing a correction to the direct final rule that it published the same day in the Federal Register (77 FR 37587).