30 CFR 250.1153 - When must I conduct a static bottomhole pressure survey?

prev | next
§ 250.1153 When must I conduct a static bottomhole pressure survey?
(a) You must conduct a static bottomhole pressure survey under the following conditions:
If you have . . . Then you must conduct . . .
(1) A new producing reservoir A static bottomhole pressure survey within 90 days after the date of first continuous production.
(2) A reservoir with three or more producing completions Annual static bottomhole pressure surveys in a sufficient number of key wells to establish an average reservoir pressure. The Regional Supervisor may require that bottomhole pressure surveys be performed on specific wells.
(b) Your bottomhole pressure survey must meet the following requirements:
(1) You must shut-in the well for a minimum period of 4 hours to ensure stabilized conditions; and
(2) The bottomhole pressure survey must consist of a pressure measurement at mid-perforation, and pressure measurements and gradient information for at least four gradient stops coming out of the hole.
(c) You must submit to the Regional Supervisor the results of all static bottomhole pressure surveys on Form MMS-140, Bottomhole Pressure Survey Report, within 60 days after the date of the survey.
(d) The Regional Supervisor may grant a departure from the requirement to run a static bottomhole pressure survey. To request a departure, you must submit a justification, along with Form MMS-140, Bottomhole Pressure Survey Report, showing a calculated bottomhole pressure or any measured data.

Title 30 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 250 after this date.

  • 2014-11-24; vol. 79 # 226 - Monday, November 24, 2014
    1. 79 FR 69777 - Oil and Gas and Sulphur Operations on the Outer Continental Shelf (OCS); Helideck and Aviation Fuel Safety for Fixed Offshore Facilities
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Extension of comment period for an advance notice of proposed rulemaking (ANPR).
      Written comments must be received by the extended due date of December 24, 2014. The BSEE may not fully consider comments received after this date.
      30 CFR Part 250