Skip to main content
 

30 CFR 250.1203 - Gas measurement.

There are 2 Updates appearing in the Federal Register for 30 CFR 250. Select the tab below to view, or View eCFR (GPOAccess)
§ 250.1203
Gas measurement.
(a) To which meters do MMS requirements for gas measurement apply? MMS requirements for gas measurements apply to all OCS gas royalty and allocation meters.
(b) What are the requirements for measuring gas? You must:
(1) Submit a written application to, and obtain approval from, the Regional Supervisor before commencing gas production, or making any changes to the previously-approved measurement and/or allocation procedures. Your application (which may also include any relevant liquid hydrocarbon measurement and surface commingling requests) must be accompanied by payment of the service fee listed in § 250.125. The service fees are divided into two levels based on complexity, see table in § 250.1202(a)(1).
(2) Design, install, use, maintain, and test measurement equipment to ensure accurate and verifiable measurement. You must follow the recommendations in API MPMS as incorporated by reference in 30 CFR 250.198.
(3) Ensure that the measurement components demonstrate consistent levels of accuracy throughout the system.
(4) Equip the meter with a chart or electronic data recorder. If an electronic data recorder is used, you must follow the recommendations in API MPMS as referenced in 30 CFR 250.198.
(5) Take proportional-to-flow or spot samples upstream or downstream of the meter at least once every 6 months.
(6) When requested by the Regional Supervisor, provide available information on the gas quality.
(7) Ensure that standard conditions for reporting gross heating value (Btu) are at a base temperature of 60 °F and at a base pressure of 14.73 psia and reflect the same degree of water saturation as in the gas volume.
(8) When requested by the Regional Supervisor, submit copies of gas volume statements for each requested gas meter. Show whether gas volumes and gross Btu heating values are reported at saturated or unsaturated conditions; and
(9) When requested by the Regional Supervisor, provide volume and quality statements on dispositions other than those on the gas volume statement.
(c) What are the requirements for gas meter calibrations? You must:
(1) Verify/calibrate operating meters monthly, but do not exceed 42 days between verifications/calibrations. When a force majeure event precludes the required monthly meter verification/calibration, meters must be verified/calibrated within 15 days after being returned to service. The meters must be verified/calibrated monthly thereafter, but do not exceed 42 days between meter verifications/calibrations;
(2) Calibrate each meter by using the manufacturer's specifications;
(3) Conduct calibrations as close as possible to the average hourly rate of flow since the last calibration;
(4) Retain calibration reports at the field location for 2 years, and send the reports to the Regional Supervisor upon request; and
(5) Permit MMS representatives to witness calibrations.
(d) What must I do if a gas meter is out of calibration or malfunctioning? If a gas meter is out of calibration or malfunctioning, you must:
(1) If the readings are greater than the contractual tolerances, adjust the meter to function properly or remove it from service and replace it.
(2) Correct the volumes to the last acceptable calibration as follows:
(i) If the duration of the error can be determined, calculate the volume adjustment for that period.
(ii) If the duration of the error cannot be determined, apply the volume adjustment to one-half of the time elapsed since the last calibration or 21 days, whichever is less.
(e) What are the requirements when natural gas from a Federal lease on the OCS is transferred to a gas plant before royalty determination? If natural gas from a Federal lease on the OCS is transferred to a gas plant before royalty determination:
(1) You must provide the following to the Regional Supervisor upon request:
(i) A copy of the monthly gas processing plant allocation statement; and
(ii) Gross heating values of the inlet and residue streams when not reported on the gas plant statement.
(2) You must permit MMS to inspect the measurement and sampling equipment of natural gas processing plants that process Federal production.
(f) What are the requirements for measuring gas lost or used on a lease? (1) You must either measure or estimate the volume of gas lost or used on a lease.
(2) If you measure the volume, document the measurement equipment used and include the volume measured.
(3) If you estimate the volume, document the estimating method, the data used, and the volumes estimated.
(4) You must keep the documentation, including the volume data, easily obtainable for inspection at the field location for at least 2 years, and must retain the documentation at a location of your choosing for at least 7 years after the documentation is generated, subject to all other document retention and production requirements in 30 U.S.C. 1713 and 30 CFR part 212.
(5) Upon the request of the Regional Supervisor, you must provide copies of the records.
[63 FR 26370, May 12, 1998. Redesignated and amended at 63 FR 29479, 29486, May 29, 1998; 63 FR 33853, June 22, 1998; 64 FR 72794, Dec. 28, 1999; 71 FR 40912, July 19, 2006; 74 FR 40073, Aug. 11, 2009]

Title 30 published on 2012-07-01

The following are only the Rules published in the Federal Register after the published date of Title 30.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-04-05; vol. 78 # 66 - Friday, April 5, 2013
    1. 78 FR 20423 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Revisions to Safety and Environmental Management Systems
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Final rule.
      This rule becomes effective on June 4, 2013. You must comply with the provisions of this rule on or before June 4, 2014, except the auditing requirements under § 250.1920. You must be in compliance with § 250.1920 by June 5, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of June 4, 2013.
      30 CFR Part 250

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
USC : Title 31 - MONEY AND FINANCE

§ 9701 - Fees and charges for Government services and things of value

USC : Title 43 - PUBLIC LANDS

§ 1331 - Definitions

§ 1332 - Congressional declaration of policy

§ 1333 - Laws and regulations governing lands

§ 1334 - Administration of leasing

§ 1335 - Validation and maintenance of prior leases

§ 1336 - Controversies over jurisdiction; agreements; payments; final settlement or adjudication; approval of notice concerning oil and gas operations in Gulf of Mexico

§ 1337 - Leases, easements, and rights-of-way on the outer Continental Shelf

§ 1338 - Disposition of revenues

§ 1338a - Moneys received as a result of forfeiture by Outer Continental Shelf permittee, lessee, or right-of-way holder; return of excess amounts

§ 1339 - Repealed.

§ 1340 - Geological and geophysical explorations

§ 1341 - Reservation of lands and rights

§ 1342 - Prior claims as unaffected

§ 1343 - Repealed.

§ 1344 - Outer Continental Shelf leasing program

§ 1345 - Coordination and consultation with affected State and local governments

§ 1346 - Environmental studies

§ 1347 - Safety and health regulations

§ 1348 - Enforcement of safety and environmental regulations

§ 1349 - Citizens suits, jurisdiction and judicial review

§ 1350 - Remedies and penalties

§ 1351 - Oil and gas development and production

§ 1352 - Oil and gas information program

§ 1353 - Federal purchase and disposition of oil and gas

§ 1354 - Limitations on export of oil or gas

§ 1355 - Restrictions on employment of former officers or employees of Department of the Interior

§ 1356 - Documentary, registry and manning requirements

§ 1356a - Coastal impact assistance program

USC : Title 44 - PUBLIC PRINTING AND DOCUMENTS

§ 3501 - Purposes

§ 3502 - Definitions

§ 3503 - Office of Information and Regulatory Affairs

§ 3504 - Authority and functions of Director

§ 3505 - Assignment of tasks and deadlines

§ 3506 - Federal agency responsibilities

§ 3507 - Public information collection activities; submission to Director; approval and delegation

§ 3508 - Determination of necessity for information; hearing

§ 3509 - Designation of central collection agency

§ 3510 - Cooperation of agencies in making information available

§ 3511 - Establishment and operation of Government Information Locator Service

§ 3512 - Public protection

§ 3513 - Director review of agency activities; reporting; agency response

§ 3514 - Responsiveness to Congress

§ 3515 - Administrative powers

§ 3516 - Rules and regulations

§ 3517 - Consultation with other agencies and the public

§ 3518 - Effect on existing laws and regulations

§ 3519 - Access to information

§ 3520 - Establishment of task force on information collection and dissemination

§ 3521 - Authorization of appropriations

Title 30 published on 2012-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 250 after this date.

  • 2013-04-05; vol. 78 # 66 - Friday, April 5, 2013
    1. 78 FR 20423 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Revisions to Safety and Environmental Management Systems
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Final rule.
      This rule becomes effective on June 4, 2013. You must comply with the provisions of this rule on or before June 4, 2014, except the auditing requirements under § 250.1920. You must be in compliance with § 250.1920 by June 5, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of June 4, 2013.
      30 CFR Part 250