§ 250.1610
Blowout preventer systems and system components.
(a) General. The blowout preventer (BOP) systems and system components shall be designed, installed, used, maintained, and tested to assure well control.
(b) BOP stacks. The BOP stacks shall consist of an annular preventer and the number of ram-type preventers as specified under paragraphs (e) and (f) of this section. The pipe rams shall be of proper size to fit the drill pipe in use.
(c) Working pressure. The working-pressure rating of any BOP shall exceed the surface pressure to which it may be anticipated to be subjected.
(d) BOP equipment. All BOP systems shall be equipped and provided with the following:
(1) An accumulator system that provides sufficient capacity to supply 1.5 times the volume necessary to close and hold closed all BOP equipment units with a minimum pressure of 200 psi above the precharge pressure, without assistance from a charging system. Accumulator regulators supplied by rig air that do not have a secondary source of pneumatic supply must be equipped with manual overrides or other devices alternately provided to ensure capability of hydraulic operations if rig air is lost.
(2) An automatic backup to the accumulator system. The backup system shall be supplied by a power source independent from the power source to the primary accumulator system. The automatic backup system shall possess sufficient capability to close the BOP and hold it closed.
(3) At least one operable remote BOP control station in addition to the one on the drilling floor. This control station shall be in a readily accessible location away from the drilling floor.
(4) A drilling spool with side outlets, if side outlets are not provided in the body of the BOP stack, to provide for separate kill and choke lines.
(5) A choke line and a kill line each equipped with two full-opening valves. At least one of the valves on the choke line and one valve on the kill line shall be remotely controlled, except that a check valve may be installed on the kill line in lieu of the remotely controlled valve, provided that two readily accessible manual valves are in place and the check valve is placed between the manual valve and the pump.
(6) A fill-up line above the uppermost preventer.
(7) A choke manifold designed with consideration of anticipated pressures to which it may be subjected, method of well control to be employed, surrounding environment, and corrosiveness, volume, and abrasiveness of fluids. The choke manifold shall also meet the following requirements:
(i) Manifold and choke equipment subject to well and/or pump pressure shall have a rated working pressure at least as great as the rated working pressure of the ram-type BOP's or as otherwise approved by the District Manager;
(ii) All components of the choke manifold system shall be protected from freezing by heating, draining, or filling with proper fluids; and
(iii) When buffer tanks are installed downstream of the choke assemblies for the purpose of manifolding the bleed lines together, isolation valves shall be installed on each line.
(8) Valves, pipes, flexible steel hoses, and other fittings upstream of, and including, the choke manifold with a pressure rating at least as great as the rated working pressure of the ram-type BOP's unless otherwise approved by the District Manager.
(9) A wellhead assembly with a rated working pressure that exceeds the pressure to which it might be subjected.
(10) The following system components:
(i) A kelly cock (an essentially full-opening valve) installed below the swivel and a similar valve of such design that it can be run through the BOP stack installed at the bottom of the kelly. A wrench to fit each valve shall be stored in a location readily accessible to the drilling crew;
(ii) An inside BOP and an essentially full-opening, drill-string safety valve in the open position on the rig floor at all times while drilling operations are being conducted. These valves shall be maintained on the rig floor to fit all connections that are in the drill string. A wrench to fit the drill-string safety valve shall be stored in a location readily accessible to the drilling crew;
(iii) A safety valve available on the rig floor assembled with the proper connection to fit the casing string being run in the hole; and
(iv) Locking devices installed on the ram-type preventers.
(e) BOP requirements. Prior to drilling below cap rock casing, a BOP system shall be installed consisting of at least three remote-controlled, hydraulically operated BOP's including at least one equipped with pipe rams, one with blind rams, and one annular type.
(f) Tapered drill-string operations. Prior to commencing tapered drill-string operations, the BOP stack shall be equipped with conventional and/or variable-bore pipe rams to provide either of the following:
(1) One set of variable bore rams capable of sealing around both sizes in the string and one set of blind rams, or
(2) One set of pipe rams capable of sealing around the larger size string, provided that blind-shear ram capability is present, and crossover subs to the larger size pipe are readily available on the rig floor.
[56 FR 32100, July 15, 1991. Redesignated at 63 FR 29479, May 29, 1998, as amended at 74 FR 46909, Sept. 14, 2009]

Title 30 published on 2012-07-01

The following are only the Rules published in the Federal Register after the published date of Title 30.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-04-05; vol. 78 # 66 - Friday, April 5, 2013
    1. 78 FR 20423 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Revisions to Safety and Environmental Management Systems
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Final rule.
      This rule becomes effective on June 4, 2013. You must comply with the provisions of this rule on or before June 4, 2014, except the auditing requirements under § 250.1920. You must be in compliance with § 250.1920 by June 5, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of June 4, 2013.
      30 CFR Part 250

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
USC : Title 31 - MONEY AND FINANCE

§ 9701 - Fees and charges for Government services and things of value

USC : Title 43 - PUBLIC LANDS

§ 1331 - Definitions

§ 1332 - Congressional declaration of policy

§ 1333 - Laws and regulations governing lands

§ 1334 - Administration of leasing

§ 1335 - Validation and maintenance of prior leases

§ 1336 - Controversies over jurisdiction; agreements; payments; final settlement or adjudication; approval of notice concerning oil and gas operations in Gulf of Mexico

§ 1337 - Leases, easements, and rights-of-way on the outer Continental Shelf

§ 1338 - Disposition of revenues

§ 1338a - Moneys received as a result of forfeiture by Outer Continental Shelf permittee, lessee, or right-of-way holder; return of excess amounts

§ 1339 - Repealed.

§ 1340 - Geological and geophysical explorations

§ 1341 - Reservation of lands and rights

§ 1342 - Prior claims as unaffected

§ 1343 - Repealed.

§ 1344 - Outer Continental Shelf leasing program

§ 1345 - Coordination and consultation with affected State and local governments

§ 1346 - Environmental studies

§ 1347 - Safety and health regulations

§ 1348 - Enforcement of safety and environmental regulations

§ 1349 - Citizens suits, jurisdiction and judicial review

§ 1350 - Remedies and penalties

§ 1351 - Oil and gas development and production

§ 1352 - Oil and gas information program

§ 1353 - Federal purchase and disposition of oil and gas

§ 1354 - Limitations on export of oil or gas

§ 1355 - Restrictions on employment of former officers or employees of Department of the Interior

§ 1356 - Documentary, registry and manning requirements

§ 1356a - Coastal impact assistance program

USC : Title 44 - PUBLIC PRINTING AND DOCUMENTS

§ 3501 - Purposes

§ 3502 - Definitions

§ 3503 - Office of Information and Regulatory Affairs

§ 3504 - Authority and functions of Director

§ 3505 - Assignment of tasks and deadlines

§ 3506 - Federal agency responsibilities

§ 3507 - Public information collection activities; submission to Director; approval and delegation

§ 3508 - Determination of necessity for information; hearing

§ 3509 - Designation of central collection agency

§ 3510 - Cooperation of agencies in making information available

§ 3511 - Establishment and operation of Government Information Locator Service

§ 3512 - Public protection

§ 3513 - Director review of agency activities; reporting; agency response

§ 3514 - Responsiveness to Congress

§ 3515 - Administrative powers

§ 3516 - Rules and regulations

§ 3517 - Consultation with other agencies and the public

§ 3518 - Effect on existing laws and regulations

§ 3519 - Access to information

§ 3520 - Establishment of task force on information collection and dissemination

§ 3521 - Authorization of appropriations

Title 30 published on 2012-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 250 after this date.

  • 2013-04-05; vol. 78 # 66 - Friday, April 5, 2013
    1. 78 FR 20423 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf—Revisions to Safety and Environmental Management Systems
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Final rule.
      This rule becomes effective on June 4, 2013. You must comply with the provisions of this rule on or before June 4, 2014, except the auditing requirements under § 250.1920. You must be in compliance with § 250.1920 by June 5, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of June 4, 2013.
      30 CFR Part 250