30 CFR 250.297 - What information must a CID contain?

§ 250.297 What information must a CID contain?
(a) You must base the CID on wells drilled before your CID submittal, that define the extent of the reservoirs. You must notify MMS of any well that is drilled to total depth during the CID evaluation period and you may be required to update your CID.
(b) You must include all of the following information if available. Information must be provided for each hydrocarbon-bearing reservoir that is penetrated by a well that would meet the producibility requirements of § 250.115 or § 250.116:
(1) General discussion of the overall development of the reservoir;
(2) Summary spreadsheets of well log data and reservoir parameters (i.e., sand tops and bases, fluid contacts, net pay, porosity, water saturations, pressures, formation volume factor);
(3) Appropriate well logs, including digital well log (i.e., gamma ray, resistivity, neutron, density, sonic, caliper curves) curves in an acceptable digital format;
(4) Sidewall core/whole core and pressure-volume-temperature analysis;
(5) Structure maps, with the existing and proposed penetration points and subsea depths for all wells penetrating the reservoirs, fluid contacts (or the lowest or highest known levels in the absence of actual contacts), reservoir boundaries, and the scale of the map;
(6) Interpreted structural cross sections and corresponding interpreted seismic lines or block diagrams, as necessary, that include all current wellbores and planned wellbores on the leases or units to be developed, the reservoir boundaries, fluid contacts, depth scale, stratigraphic positions, and relative biostratigraphic ages;
(7) Isopach maps of each reservoir showing the net feet of pay for each well within the reservoir identified at the penetration point, along with the well name, labeled contours, and scale;
(8) Estimates of original oil and gas in-place and anticipated recoverable oil and gas reserves, all reservoir parameters, and risk factors and assumptions;
(9) Plat map at the same scale as the structure maps with existing and proposed well paths, as well as existing and proposed penetrations;
(10) Wellbore schematics indicating proposed perforations;
(11) Proposed wellbore utility chart showing all existing and proposed wells, with proposed completion intervals indicated for each borehole;
(12) Appropriate pressure data, specified by date, and whether estimated or measured;
(13) Description of reservoir development strategies;
(14) Description of the enhanced recovery practices you will use or, if you do not plan to use such practices, an explanation of the methods you considered and reasons you do not intend to use them;
(15) For each reservoir you do not intend to develop:
(i) A statement explaining the reason(s) you will not develop the reservoir, and
(ii) Economic justification, including costs, recoverable reserve estimate, production profiles, and pricing assumptions; and
(16) Any other appropriate data you used in performing your reservoir evaluations and preparing your reservoir development strategies.

Title 30 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 250 after this date.

  • 2014-11-24; vol. 79 # 226 - Monday, November 24, 2014
    1. 79 FR 69777 - Oil and Gas and Sulphur Operations on the Outer Continental Shelf (OCS); Helideck and Aviation Fuel Safety for Fixed Offshore Facilities
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Extension of comment period for an advance notice of proposed rulemaking (ANPR).
      Written comments must be received by the extended due date of December 24, 2014. The BSEE may not fully consider comments received after this date.
      30 CFR Part 250