30 CFR § 250.528 - What must I include in my casing pressure request?

§ 250.528 What must I include in my casing pressure request?

The following information must be included in the casing pressure request:

(a) API number;

(b) Lease number;

(c) Area name and OCS block number;

(d) Well number;

(e) Company name and mailing address;

(f) All casing, riser, and tubing sizes, weights, grades, and MIYP;

(g) All casing/riser calculated MAWOPs;

(h) All casing/riser pre-bleed down pressures;

(i) Shut-in tubing pressure;

(j) Flowing tubing pressure;

(k) Date and the calculated daily production rate during last well test (oil, gas, basic sediment, and water);

(l) Well status (shut-in, temporarily abandoned, producing, injecting, or gas lift);

(m) Well type (dry tree, hybrid, or subsea);

(n) Date of diagnostic test;

(o) Well schematic;

(p) Water depth;

(q) Volumes and types of fluid bled from each casing or riser evaluated;

(r) Type of diagnostic test performed:

(1) Bleed down/buildup test;

(2) Shut-in the well and monitor the pressure drop test;

(3) Constant production rate and decrease the annular pressure test;

(4) Constant production rate and increase the annular pressure test;

(5) Change the production rate and monitor the casing pressure test; and

(6) Casing pressure and tubing pressure history plot;

(s) The casing diagnostic test data for all casing exceeding 100 psig;

(t) Associated shoe strengths for casing shoes exposed to annular fluids;

(u) Concentration of any H2S that may be present;

(v) Whether the structure on which the well is located is manned or unmanned;

(w) Additional comments; and

(x) Request date.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]