30 CFR 285, Subpart G - Facility Design, Fabrication, and Installation
- — Reports
- § 285.700 — What reports must I submit to MMS before installing facilities described in my approved SAP, COP, or GAP?
- § 285.701 — What must I include in my Facility Design Report?
- § 285.702 — What must I include in my Fabrication and Installation Report?
- § 285.703 — What reports must I submit for project modifications and repairs?
- § 285.704 — [Reserved]
- — Certified Verification Agent
- § 285.705 — When must I use a Certified Verification Agent (CVA)?
- § 285.706 — How do I nominate a CVA for MMS approval?
- § 285.707 — What are the CVA's primary duties for facility design review?
- § 285.708 — What are the CVA's or project engineer's primary duties for fabrication and installation review?
- § 285.709 — When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
- § 285.710 — When conducting onsite installation inspections, what must the CVA or project engineer do?
- § 285.711 — [Reserved]
- § 285.712 — What are the CVA's or project engineer's reporting requirements?
- § 285.713 — What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease?
- § 285.714 — What records relating to SAPs, COPs, and GAPs must I keep?
Title 30 published on 2012-07-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.