30 CFR 550.211 - What must the EP include?

prev | next
§ 550.211 What must the EP include?
Your EP must include the following:
(a) Description, objectives, and schedule. A description, discussion of the objectives, and tentative schedule (from start to completion) of the exploration activities that you propose to undertake. Examples of exploration activities include exploration drilling, well test flaring, installing a well protection structure, and temporary well abandonment.
(b) Location. A map showing the surface location and water depth of each proposed well and the locations of all associated drilling unit anchors.
(c) Drilling unit. A description of the drilling unit and associated equipment you will use to conduct your proposed exploration activities, including a brief description of its important safety and pollution prevention features, and a table indicating the type and the estimated maximum quantity of fuels, oil, and lubricants that will be stored on the facility (see definition of “facility” under § 550.105(3)).
(d) Service fee. You must include payment of the service fee listed in § 550.125.

Title 30 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 550 after this date.

  • 2014-08-19; vol. 79 # 160 - Tuesday, August 19, 2014
    1. 79 FR 49027 - Risk Management, Financial Assurance and Loss Prevention
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Ocean Energy Management
      Advance notice of proposed rulemaking (ANPR).
      BOEM will consider all comments received by midnight of October 20, 2014. BOEM cannot commit to considering comments received after midnight on October 20, 2014.
      30 CFR Parts 550, 551, 556, 581, 582 and 585