30 CFR 550.218 - What air emissions information must accompany the EP?

§ 550.218 What air emissions information must accompany the EP?
The following air emissions information, as applicable, must accompany your EP:
(a) Projected emissions. Tables showing the projected emissions of sulphur dioxide (SO2), particulate matter in the form of PM10 and PM2.5 when applicable, nitrogen oxides (NOX), carbon monoxide (CO), and volatile organic compounds (VOC) that will be generated by your proposed exploration activities.
(1) For each source on or associated with the drilling unit (including well test flaring and well protection structure installation), you must list:
(i) The projected peak hourly emissions;
(ii) The total annual emissions in tons per year;
(iii) Emissions over the duration of the proposed exploration activities;
(iv) The frequency and duration of emissions; and
(v) The total of all emissions listed in paragraphs (a)(1)(i) through (iv) of this section.
(2) You must provide the basis for all calculations, including engine size and rating, and applicable operational information.
(3) You must base the projected emissions on the maximum rated capacity of the equipment on the proposed drilling unit under its physical and operational design.
(4) If the specific drilling unit has not yet been determined, you must use the maximum emission estimates for the type of drilling unit you will use.
(b) Emission reduction measures. A description of any proposed emission reduction measures, including the affected source(s), the emission reduction control technologies or procedures, the quantity of reductions to be achieved, and any monitoring system you propose to use to measure emissions.
(c) Processes, equipment, fuels, and combustibles. A description of processes, processing equipment, combustion equipment, fuels, and storage units. You must include the characteristics and the frequency, duration, and maximum burn rate of any well test fluids to be burned.
(d) Distance to shore. Identification of the distance of your drilling unit from the mean high water mark (mean higher high water mark on the Pacific coast) of the adjacent State.
(e) Non-exempt drilling units. A description of how you will comply with § 550.303 when the projected emissions of SO2, PM, NOX, CO, or VOC, that will be generated by your proposed exploration activities, are greater than the respective emission exemption amounts “E” calculated using the formulas in § 550.303(d). When BOEM requires air quality modeling, you must use the guidelines in appendix W of 40 CFR part 51 with a model approved by the Director. Submit the best available meteorological information and data consistent with the model(s) used.
(f) Modeling report. A modeling report or the modeling results (if § 550.303 requires you to use an approved air quality model to model projected air emissions in developing your EP), or a reference to such a report or results if you have already submitted it to the Regional Supervisor.

Title 30 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 550 after this date.

  • 2014-08-19; vol. 79 # 160 - Tuesday, August 19, 2014
    1. 79 FR 49027 - Risk Management, Financial Assurance and Loss Prevention
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Ocean Energy Management
      Advance notice of proposed rulemaking (ANPR).
      BOEM will consider all comments received by midnight of October 20, 2014. BOEM cannot commit to considering comments received after midnight on October 20, 2014.
      30 CFR Parts 550, 551, 556, 581, 582 and 585