30 CFR 780.14 - Operation plan: Maps and plans.

Status message

There is 1 rule appearing in the Federal Register for 30 CFR 780. View below or at eCFR (GPOAccess)
§ 780.14 Operation plan: Maps and plans.
Each application shall contain maps and plans as follows:
(a) The maps and plans shall show the lands proposed to be affected throughout the operation and any change in a facility or feature to be caused by the proposed operations, if the facility or feature was shown under 30 CFR 779.24 through 779.25.
(b) The following shall be shown for the proposed permit area:
(1) Buildings, utility corridors and facilities to be used;
(2) The area of land to be affected within the proposed permit area, according to the sequence of mining and reclamation;
(3) Each area of land for which a performance bond or other equivalent guarantee will be posted under subchapter J of this chapter;
(4) Each coal storage, cleaning and loading area;
(5) Each topsoil, spoil, coal waste, and non-coal waste storage area;
(6) Each water diversion, collection, conveyance, treatment, storage, and discharge facility to be used;
(7) Each air pollution collection and control facility;
(8) Each source of waste and each waste disposal facility relating to coal processing or pollution control;
(9) Each facility to be used to protect and enhance fish and wildlife and related environmental values;
(10) Each explosive storage and handling facility; and
(11) Locations of each siltation structure, permanent water impoundment, refuse pile, and coal mine waste impoundment for which plans are required by § 780.25 of this part, and the location of each fill for the disposal of excess spoil for which plans are required under § 780.35 of this part.
(c) Except as provided in §§ 780.25(a)(2), 780.25(a)(3), 780.35, 816.73(c), 816.74(c), and 816.81(c) of this chapter, cross-sections, maps, and plans required under paragraphs (b)(4), (5), (6), (10), and (11) of this section must be prepared by, or under the direction of, and certified by a qualified registered professional engineer, a professional geologist, or, in any state that authorizes land surveyors to prepare and certify cross-sections, maps, and plans, a qualified, registered, professional land surveyor, with assistance from experts in related fields such as landscape architecture.
[44 FR 15357, Mar. 13, 1979; 44 FR 49685, Aug. 24, 1979, as amended at 45 FR 51550, Aug. 4, 1980; 48 FR 14822, Apr. 5, 1983; 50 FR 16199, Apr. 24, 1985; 56 FR 65635, Dec. 17, 1991; 73 FR 75875, Dec. 12, 2008]

Title 30 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 30.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-12-22; vol. 79 # 245 - Monday, December 22, 2014
    1. 79 FR 76227 - Excess Spoil, Coal Mine Waste, Diversions, and Buffer Zones for Perennial and Intermittent Streams
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Office of Surface Mining Reclamation and Enforcement
      Final rule.
      This regulation is effective December 22, 2014. The incorporation by reference of the publication listed in 30 CFR 780.25(a)(2) and 784.16(a)(2) was approved by the Director of the Federal Register on December 22, 2014.
      30 CFR Parts 780, 784, 816, and 817

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 780 after this date.

  • 2014-12-22; vol. 79 # 245 - Monday, December 22, 2014
    1. 79 FR 76227 - Excess Spoil, Coal Mine Waste, Diversions, and Buffer Zones for Perennial and Intermittent Streams
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Office of Surface Mining Reclamation and Enforcement
      Final rule.
      This regulation is effective December 22, 2014. The incorporation by reference of the publication listed in 30 CFR 780.25(a)(2) and 784.16(a)(2) was approved by the Director of the Federal Register on December 22, 2014.
      30 CFR Parts 780, 784, 816, and 817