30 CFR 784.200 - Interpretive rules related to General Performance Standards.

Status message

There is 1 rule appearing in the Federal Register for 30 CFR 784. View below or at eCFR (GPOAccess)
prev | next
§ 784.200 Interpretive rules related to General Performance Standards.
The following interpretation of rules promulgated in part 784 of this chapter have been adopted by the Office of Surface Mining Reclamation and Enforcement.
(a) Interpretation of § 784.15: Reclamation plan: Postmining land uses.
(1) The requirements of § 784.15(a)(2), for approval of an alternative postmining land use, may be met by requesting approval through the permit revision procedures of § 774.13 rather than requesting such approval in the original permit application. The original permit application, however, must demonstrate that the land will be returned to its premining land use capability as required by § 817.133(a). An application for a permit revision of this type, (i) must be submitted in accordance with the filing deadlines of § 774.13, (ii) shall constitute a significant alteration from the mining operations contemplated by the original permit, and (iii) shall be subject to the requirements of 30 CFR parts 773 and 775.
(b) [Reserved]
[45 FR 64908, Oct. 1, 1980, as amended at 48 FR 44780, Sept. 30, 1983]

Title 30 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 30.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-12-22; vol. 79 # 245 - Monday, December 22, 2014
    1. 79 FR 76227 - Excess Spoil, Coal Mine Waste, Diversions, and Buffer Zones for Perennial and Intermittent Streams
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Office of Surface Mining Reclamation and Enforcement
      Final rule.
      This regulation is effective December 22, 2014. The incorporation by reference of the publication listed in 30 CFR 780.25(a)(2) and 784.16(a)(2) was approved by the Director of the Federal Register on December 22, 2014.
      30 CFR Parts 780, 784, 816, and 817

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 30 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR 784 after this date.

  • 2014-12-22; vol. 79 # 245 - Monday, December 22, 2014
    1. 79 FR 76227 - Excess Spoil, Coal Mine Waste, Diversions, and Buffer Zones for Perennial and Intermittent Streams
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Office of Surface Mining Reclamation and Enforcement
      Final rule.
      This regulation is effective December 22, 2014. The incorporation by reference of the publication listed in 30 CFR 780.25(a)(2) and 784.16(a)(2) was approved by the Director of the Federal Register on December 22, 2014.
      30 CFR Parts 780, 784, 816, and 817