30 CFR Part 816 - PERMANENT PROGRAM PERFORMANCE STANDARDS—SURFACE MINING ACTIVITIES
- § 816.1 — Scope.
- § 816.2 — Objectives.
- § 816.10 — Information collection.
- § 816.11 — Signs and markers.
- § 816.13 — Casing and sealing of drilled holes: General requirements.
- § 816.14 — Casing and sealing of drilled holes: Temporary.
- § 816.15 — Casing and sealing of drilled holes: Permanent.
- § 816.22 — Topsoil and subsoil.
- § 816.41 — Hydrologic-balance protection.
- § 816.42 — Hydrologic balance: Water quality standards and effluent limitations.
- § 816.43 — Diversions.
- § 816.45 — Hydrologic balance: Sediment control measures.
- § 816.46 — Hydrologic balance: Siltation structures.
- § 816.47 — Hydrologic balance: Discharge structures.
- § 816.49 — Impoundments.
- § 816.56 — Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
- § 816.57 — Hydrologic balance: Activities in or adjacent to perennial or intermittent streams.
- § 816.59 — Coal recovery.
- § 816.61 — Use of explosives: General requirements.
- § 816.62 — Use of explosives: Preblasting survey.
- § 816.64 — Use of explosives: Blasting schedule.
- § 816.66 — Use of explosives: Blasting signs, warnings, and access control.
- § 816.67 — Use of explosives: Control of adverse effects.
- § 816.68 — Use of explosives: Records of blasting operations.
- § 816.71 — Disposal of excess spoil: General requirements.
- § 816.72 — Disposal of excess spoil: Valley fills/head-of-hollow fills.
- § 816.73 — Disposal of excess spoil: Durable rock fills.
- § 816.74 — Disposal of excess spoil: Preexisting benches.
- § 816.79 — Protection of underground mining.
- § 816.81 — Coal mine waste: General requirements.
- § 816.83 — Coal mine waste: Refuse piles.
- § 816.84 — Coal mine waste: Impounding structures.
- § 816.87 — Coal mine waste: Burning and burned waste utilization.
- § 816.89 — Disposal of noncoal mine wastes.
- § 816.95 — Stabilization of surface areas.
- § 816.97 — Protection of fish, wildlife, and related environmental values.
- § 816.99 — Slides and other damage.
- § 816.100 — Contemporaneous reclamation.
- § 816.101 — Backfilling and grading: Time and distance requirements.
- § 816.102 — Backfilling and grading: General requirements.
- § 816.104 — Backfilling and grading: Thin overburden.
- § 816.105 — Backfilling and grading: Thick overburden.
- § 816.106 — Backfilling and grading: Previously mined areas.
- § 816.107 — Backfilling and grading: Steep slopes.
- § 816.111 — Revegetation: General requirements.
- § 816.113 — Revegetation: Timing
- § 816.114 — Revegetation: Mulching and other soil stabilizing practices.
- § 816.116 — Revegetation: Standards for success.
- § 816.131 — Cessation of operations: Temporary.
- § 816.132 — Cessation of operations: Permanent.
- § 816.133 — Postmining land use.
- § 816.150 — Roads: general.
- § 816.151 — Primary roads.
- § 816.180 — Utility installations.
- § 816.181 — Support facilities.
- § 816.200 — Interpretative rules related to general performance standards.
Authority:
30 U.S.C. 1201
et seq.
Source:
44 FR 15395, Mar. 13, 1979, unless otherwise noted.
Title 30 published on 2012-07-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.