33 CFR 150.619 - What are the fall arrest system requirements?

prev | next
§ 150.619 What are the fall arrest system requirements?
(a) The deepwater port operator must ensure that all personnel who are exposed to the risk of falling more than 6 feet, or who are at risk of falling any distance onto equipment with irregular surfaces, exposed moving components, electrically energized cables or connectors, or water, are protected against such a fall by guardrails or other measures that comply with 29 CFR 1910.23 or 1910.28, or by the use of suitable lifesaving equipment that complies with 46 CFR part 160.
(b) In addition, the operator must take measures to control the risk of falling, tripping, or slipping in work areas and walkways due to the presence of loose material or wet conditions, including spills.

Title 33 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Presidential Documents

Executive Order ... 12777

Executive Order ... 13286

Title 33 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 33 CFR 150 after this date.

  • 2014-05-08; vol. 79 # 89 - Thursday, May 8, 2014
    1. 79 FR 26391 - Workplace Safety and Health for Merchant Mariners
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Request for comments on petition for rulemaking.
      Comments and related material must either be submitted to our online docket via http://www.regulations.gov on or before August 6, 2014, or reach the Docket Management Facility by that date.
      33 CFR Parts 140, 142, and 150