Skip to main content
 

33 CFR 151.43 - Control of discharge of NLS residues.

There are 2 Updates appearing in the Federal Register for 33 CFR 151. Select the tab below to view, or View eCFR (GPOAccess)
§ 151.43
Control of discharge of NLS residues.
(a) Unless the ship is a fixed or floating drilling rig or other platform operating under an National Pollution Discharge Elimination System (NPDES) permit, the master or person in charge of an oceangoing ship that cannot discharge NLS residue into the sea in accordance with 46 CFR 153.1126 or 153.1128 shall ensure that the NLS residue is—
(1) Retained on board; or
(2) Discharged to a reception facility.
(b) If Category A, B, or C NLS cargo or NLS residue is to be transfered at a port or terminal in the United States, the master or person in charge of each oceangoing ship carrying NLS cargo or NLS residue shall notify the port or terminal at least 24 hours before entering the port or terminal of—
(1) The name of the ship;
(2) The name, category and volume of NLS cargo to be unloaded;
(3) If the cargo is a Category B or C high viscosity NLS cargo or solidifying NLS cargo listed in Table 1 of 46 CFR Part 153 with a reference to “ § 153.908(a) ” or “ § 153.908(b) ” in the “Special Requirements” column of that table, the time of day the ship is estimated to be ready to discharge NLS residue to a reception facility;
(4) If the cargo is any Category B or C NLS cargo not under paragraph (b)(3) of this section, whether or not the ship meets the stripping requirements under 46 CFR 153.480, 153.481, or 153.482 ;
(5) The name and the estimated volume of NLS in the NLS residue to be discharged;
(6) The total volume of NLS residue to be discharged; and
(7) The name and amount of any cleaning agents to be used during the prewash required by 46 CFR 153.1120.
(c) The master or person in charge of a U.S. ship in a special area shall operate the ship in accordance with 46 CFR 153.903.
Note: The master or person in charge of a ship carrying Category A NLS that is required to prewash tanks under the procedures in 46 CFR Part 153.1120 is required under 46 CFR 153.1101 to notify the COTP at least 24 hours before a prewash surveyor is needed.

Title 33 published on 2012-07-01

The following are only the Rules published in the Federal Register after the published date of Title 33.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-02-28; vol. 78 # 40 - Thursday, February 28, 2013
    1. 78 FR 13481 - Implementation of MARPOL Annex V Amendments
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Interim rule with request for comments.
      This interim rule is effective April 1, 2013. Comments and related material must either be submitted to our online docket via http://www.regulations.gov on or before May 29, 2013 or reach the Docket Management Facility by that date.
      33 CFR Part 151

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
USC : Title 16 - CONSERVATION

§ 4711 - Aquatic nuisance species in waters of United States

USC : Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 1321 - Oil and hazardous substance liability

§ 1903 - Administration and enforcement

§ 1908 - Penalties for violations

§ 2602 - Vessel permits and numbers

USC : Title 46 - SHIPPING

§ 6101 - Marine casualties and reporting

Statutes at Large

110 Stat. 3034

Presidential Documents

Executive Order ... 12777

Title 33 published on 2012-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 33 CFR 151 after this date.

  • 2013-02-28; vol. 78 # 40 - Thursday, February 28, 2013
    1. 78 FR 13481 - Implementation of MARPOL Annex V Amendments
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Interim rule with request for comments.
      This interim rule is effective April 1, 2013. Comments and related material must either be submitted to our online docket via http://www.regulations.gov on or before May 29, 2013 or reach the Docket Management Facility by that date.
      33 CFR Part 151