33 CFR 154.1030 - General response plan contents.

Status message

There is 1 rule appearing in the Federal Register for 33 CFR 154. View below or at eCFR (GPOAccess)
§ 154.1030 General response plan contents.
(a) The plan must be written in English.
(b) A response plan must be divided into the sections listed in this paragraph and formatted in the order specified herein unless noted otherwise. It must also have some easily found marker identifying each section listed below. The following are the sections and subsections of a facility response plan:
(1) Introduction and plan contents.
(2) Emergency response action plan:
(i) Notification procedures.
(ii) Facility's spill mitigation procedures.
(iii) Facility's response activities.
(iv) Fish and wildlife and sensitive environments.
(v) Disposal plan.
(3) Training and Exercises:
(i) Training procedures.
(ii) Exercise procedures.
(4) Plan review and update procedures.
(5) Appendices.
(i) Facility-specific information.
(ii) List of contacts.
(iii) Equipment lists and records.
(iv) Communications plan.
(v) Site-specific safety and health plan.
(vi) List of acronyms and definitions.
(vii) A geographic-specific appendix for each zone in which a mobile facility operates.
(c) The required contents for each section and subsection of the plan are contained in §§ 154.1035, 154.1040, and 154.1041, as appropriate.
(d) The sections and subsections of response plans submitted to the COTP must contain at a minimum all the information required in §§ 154.1035, 154.1040, and 154.1041, as appropriate. It may contain other appropriate sections, subsections, or information that are required by other Federal, State, and local agencies.
(e) For initial and subsequent submission, a plan that does not follow the format specified in paragraph (b) of this section must be supplemented with a detailed cross-reference section to identify the location of the applicable sections required by this subpart.
(f) The information contained in a response plan must be consistent with the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) covering the area in which the facility operates. Facility owners or operators shall ensure that their response plans are in accordance with the ACP in effect 6 months prior to initial plan submission or the annual plan review required under § 154.1065(a). Facility owners or operators are not required to, but may at their option, conform to an ACP which is less than 6 months old at the time of plan submission.

Title 33 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 33.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-07-16; vol. 78 # 136 - Tuesday, July 16, 2013
    1. 78 FR 42596 - Marine Vapor Control Systems
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Final rule.
      This final rule is effective August 15, 2013, except as additional collection of information requirements that appear in several regulations added or revised by this rule and which have not yet been approved by the Office of Management and Budget (OMB) may not be enforced by the Coast Guard pending OMB approval which, if granted, will be noted by the Coast Guard in a subsequent Federal Register document. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of August 15, 2013.
      33 CFR Parts 154, 155, and 156

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 14 - COAST GUARD
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS
U.S. Code: Title 49 - TRANSPORTATION
Presidential Documents

Executive Order ... 12777

Title 33 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 33 CFR 154 after this date.

  • 2013-07-16; vol. 78 # 136 - Tuesday, July 16, 2013
    1. 78 FR 42596 - Marine Vapor Control Systems
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Final rule.
      This final rule is effective August 15, 2013, except as additional collection of information requirements that appear in several regulations added or revised by this rule and which have not yet been approved by the Office of Management and Budget (OMB) may not be enforced by the Coast Guard pending OMB approval which, if granted, will be noted by the Coast Guard in a subsequent Federal Register document. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of August 15, 2013.
      33 CFR Parts 154, 155, and 156