33 CFR 222 - ENGINEERING AND DESIGN
- § 222.2 — Acquisition of lands downstream from spillways for hydrologic safety purposes.
- § 222.3 — Clearances for power and communication lines over reservoirs.
- § 222.4 — Reporting earthquake effects.
- § 222.5 — Water control management (ER 1110-2-240).
- § 222.6 — National Program for Inspection of Non-Federal Dams.
Title 33 published on 2012-07-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
68 Stat. 303