33 CFR 325.6 - Duration of permits.

§ 325.6 Duration of permits.
(a) General. DA permits may authorize both the work and the resulting use. Permits continue in effect until they automatically expire or are modified, suspended, or revoked.
(b) Structures. Permits for the existence of a structure or other activity of a permanent nature are usually for an indefinite duration with no expiration date cited. However, where a temporary structure is authorized, or where restoration of a waterway is contemplated, the permit will be of limited duration with a definite expiration date.
(c) Works. Permits for construction work, discharge of dredged or fill material, or other activity and any construction period for a structure with a permit of indefinite duration under paragraph (b) of this section will specify time limits for completing the work or activity. The permit may also specify a date by which the work must be started, normally within one year from the date of issuance. The date will be established by the issuing official and will provide reasonable times based on the scope and nature of the work involved. Permits issued for the transport of dredged material for the purpose of disposing of it in ocean waters will specify a completion date for the disposal not to exceed three years from the date of permit issuance.
(d) Extensions of time. An authorization or construction period will automatically expire if the permittee fails to request and receive an extension of time. Extensions of time may be granted by the district engineer. The permittee must request the extension and explain the basis of the request, which will be granted unless the district engineer determines that an extension would be contrary to the public interest. Requests for extensions will be processed in accordance with the regular procedures of § 325.2 of this part, including issuance of a public notice, except that such processing is not required where the district engineer determines that there have been no significant changes in the attendant circumstances since the authorization was issued.
(e) Maintenance dredging. If the authorized work includes periodic maintenance dredging, an expiration date for the authorization of that maintenance dredging will be included in the permit. The expiration date, which in no event is to exceed ten years from the date of issuance of the permit, will be established by the issuing official after evaluation of the proposed method of dredging and disposal of the dredged material in accordance with the requirements of 33 CFR parts 320 to 325. In such cases, the district engineer shall require notification of the maintenance dredging prior to actual performance to insure continued compliance with the requirements of this regulation and 33 CFR parts 320 to 324. If the permittee desires to continue maintenance dredging beyond the expiration date, he must request a new permit. The permittee should be advised to apply for the new permit six months prior to the time he wishes to do the maintenance work.

Title 33 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 401 - Construction of bridges, causeways, dams or dikes generally; exemptions

§ 402 - Construction of bridges, etc., over Illinois and Mississippi Canal

§ 403 - Obstruction of navigable waters generally; wharves; piers, etc.; excavations and filling in

§ 403a - Creation or continuance of obstruction of navigable waters

§ 403b - Lighting at docks and boat launching facilities

§ 404 - Establishment of harbor lines; conditions to grants for extension of piers, etc.

§ 405 - Establishment and modification of harbor lines on Potomac and Anacostia Rivers

§ 406 - Penalty for wrongful construction of bridges, piers, etc.; removal of structures

§ 407 - Deposit of refuse in navigable waters generally

§ 407a - Deposit of debris of mines and stamp works

§ 408 - Taking possession of, use of, or injury to harbor or river improvements

§ 409 - Obstruction of navigable waters by vessels; floating timber; marking and removal of sunken vessels

§ 410 - Exception as to floating loose timber, sack rafts, etc.; violation of regulations; penalty

§ 411 - Penalty for wrongful deposit of refuse; use of or injury to harbor improvements, and obstruction of navigable waters generally

§ 412 - Liability of masters, pilots, etc., and of vessels engaged in violations

§ 413 - Duty of United States attorneys and other Federal officers in enforcement of provisions; arrest of offenders

§ 414 - Removal by Secretary of the Army of sunken water craft generally; liability of owner, lessee, or operator

§ 415 - Summary removal of water craft obstructing navigation; liability of owner, lessee, or operator

§ 416 - Appropriations for removal of sunken water craft

§ 417 - Expenses of investigations by Department of the Army

§ 418 - Provisions for protection of New York Harbor unaffected

§ 419 - Regulation by Secretary governing transportation and dumping of dredgings, refuse, etc., into navigable waters; oyster lands; appropriations

§ 419a - Management practices to extend capacity and useful life of dredged material disposal areas

§ 420 - Piers and cribs on Mississippi and St. Croix Rivers

§ 421 - Deposit of refuse, etc., in Lake Michigan near Chicago

§ 422 - Modification and extension of harbor lines at Chicago

§ 423 - Establishment of pierhead and bulkhead lines in Wilmington Harbor, California

§ 424 - Establishment of pierhead or bulkhead lines in Newport Harbor, California

§ 424a - Modification of harbor lines in Newport Harbor, California

§ 425 - Omitted

§ 426 - Investigations concerning erosion of shores of coastal and lake waters

33 U.S. Code § 426–1 - Coastal Engineering Research Center; establishment; powers and functions

33 U.S. Code § 426–2 - Board on Coastal Engineering Research

33 U.S. Code § 426–3 - Transfer of functions of Beach Erosion Board

§ 426a - Additional investigations concerning erosion of shores of coastal and lake waters; payment of costs; “shores” defined

§ 426b - Applicability of existing laws; projects referred to Board of Engineers for Rivers and Harbors

§ 426c - Report by Coastal Engineering Research Center

§ 426d - Payment of expenses

§ 426e - Federal aid in protection of shores

33 U.S. Code § 426e–1 - Shore protection projects

§ 426f - Reimbursements

§ 426g - Storm and hurricane restoration and impact minimization program

33 U.S. Code § 426g–1 - State and regional plans

§ 426h - Repealed.

33 U.S. Code § 426h–1 - Definitions

§ 426i - Shore damage prevention or mitigation

33 U.S. Code § 426i–1 - Construction of shoreline protection projects by non-Federal interests

33 U.S. Code § 426i–2 - National coastal data bank

§ 426j - Repealed.

§ 426k - Five year demonstration program to temporarily increase diversion of water from Lake Michigan at Chicago, Illinois

33 U.S. Code § -

§ 426m - Collection and removal of drift and debris from publicly maintained commercial boat harbors and adjacent land and water areas

§ 426n - Technical assistance to States and local governments; cost sharing

33 U.S. Code § -

33 U.S. Code § -

33 U.S. Code § -

§ 426p - Corps of Engineers

§ 427 to 430 - Repealed. July 31, 1945, ch. 334,

§ 1344 - Permits for dredged or fill material

§ 1413 - Dumping permit program for dredged material