40 CFR 112.5 - Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators.

§ 112.5 Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators.
If you are the owner or operator of a facility subject to this part, you must:
(a) Amend the SPCC Plan for your facility in accordance with the general requirements in § 112.7, and with any specific section of this part applicable to your facility, when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § 112.1(b). Examples of changes that may require amendment of the Plan include, but are not limited to: commissioning or decommissioning containers; replacement, reconstruction, or movement of containers; reconstruction, replacement, or installation of piping systems; construction or demolition that might alter secondary containment structures; changes of product or service; or revision of standard operation or maintenance procedures at a facility. An amendment made under this section must be prepared within six months, and implemented as soon as possible, but not later than six months following preparation of the amendment.
(b) Notwithstanding compliance with paragraph (a) of this section, complete a review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months of the review to include more effective prevention and control technology if the technology has been field-proven at the time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. You must implement any amendment as soon as possible, but not later than six months following preparation of any amendment. You must document your completion of the review and evaluation, and must sign a statement as to whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), and will (will not) amend the Plan as a result.”
(c) Except as provided in § 112.6, have a Professional Engineer certify any technical amendments to your Plan in accordance with § 112.3(d).
[67 FR 47140, July 17, 2002, as amended at 71 FR 77291, Dec. 26, 2006; 73 FR 74301, Dec. 5, 2008; 74 FR 58809, Nov. 13, 2009]

Title 40 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 1251 - Congressional declaration of goals and policy

§ 1252 - Comprehensive programs for water pollution control

§ 1252a - Reservoir projects, water storage; modification; storage for other than for water quality, opinion of Federal agency, committee...certain prescribed water quality benefits in relation to total project benefits

§ 1253 - Interstate cooperation and uniform laws

§ 1254 - Research, investigations, training, and information

§ 1254a - Research on effects of pollutants

§ 1255 - Grants for research and development

§ 1256 - Grants for pollution control programs

§ 1257 - Mine water pollution control demonstrations

§ 1257a - State demonstration programs for cleanup of abandoned mines for use as waste disposal sites; authorization of appropriations

§ 1258 - Pollution control in the Great Lakes

§ 1259 - Training grants and contracts

§ 1260 - Applications; allocation

§ 1261 - Scholarships

§ 1262 - Definitions and authorizations

§ 1263 - Alaska village demonstration projects

§ 1263a - Grants to Alaska to improve sanitation in rural and Native villages

§ 1264 - Omitted

§ 1265 - In-place toxic pollutants

§ 1266 - Hudson River reclamation demonstration project

§ 1267 - Chesapeake Bay

§ 1268 - Great Lakes

§ 1269 - Long Island Sound

§ 1270 - Lake Champlain Basin Program

§ 1271 - Sediment survey and monitoring

§ 1271a - Research and development program

§ 1272 - Environmental dredging

§ 1273 - Lake Pontchartrain Basin

§ 1274 - Watershed pilot projects

§ 2720 - Differentiation among fats, oils, and greases

Presidential Documents

Executive Order ... 12777

Reorganization ... 1970 Plan No. 3

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 112 after this date.

  • 2014-10-24; vol. 79 # 206 - Friday, October 24, 2014
    1. 79 FR 63594 - Definition of “Waters of the United States” Under the Clean Water Act Proposed Rule; Notice of Availability
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY, DEPARTMENT OF DEFENSE, Department of the Army, Corps of Engineers
      Proposed rule; notice of availability.
      The public comment for the proposed rule closes on November 14, 2014.
      33 CFR Part 328