40 CFR 147.304 - Existing Class II enhanced recovery and hydrocarbon storage wells authorized by rule.

§ 147.304 Existing Class II enhanced recovery and hydrocarbon storage wells authorized by rule.
(a) Maximum injection pressure.
(1) To meet the operating requirements of § 144.28(f)(3)(ii) (A) and (B) of this chapter, the owner or operator:
(i) Shall use an injection pressure no greater than the pressure established by the Regional Administrator for the field or formation in which the well is located. The Regional Administrator shall establish such a maximum pressure after notice, opportunity for comment, and opportunity for a public hearing, according to the provisions of part 124, subpart A of this chapter, and will inform owners and operators in writing of the applicable maximum pressure; or
(ii) May inject at pressures greater than those specified in paragraph (a)(1)(i) of this section for the field or formation in which he is operating provided he submits a request in writing to the Regional Administrator and demonstrates to the satisfaction of the Regional Administrator that such injection pressure will not violate the requirements of § 144.28(f)(3)(ii) (A) and (B). The Regional Administrator may grant such a request after notice, opportunity for comment, and opportunity for a public hearing, according to the provisions of part 124, subpart A of this chapter.
(2) Prior to such time as the Regional Administrator establishes rules for maximum injection pressures based on data provided pursuant to paragraph (a)(2)(ii) of this section the owner or operator shall:
(i) Limit injection pressure to a value which will not exceed the operating requirements of § 144.28(f)(3)(ii); and
(ii) Submit data acceptable to the Regional Administrator which defines the fracture pressure of the formation in which injection is taking place. A single test may be submitted on behalf of two or more operators conducting operations in the same formation, if the Regional Administrator approves such submission. The data shall be submitted to the Regional Administrator within one year of the effective date of this program.
(b) Casing and cementing. Where the Regional Administrator determines that the owner or operator of an existing enhanced recovery or hydrocarbon storage well may not be in compliance with the requirements of §§ 144.28(e) and 146.22, the owner or operator shall comply with paragraphs (b) (1) through (4) of this section, when required by the Regional Administrator:
(1) Protect USDWs by:
(i) Cementing surface casing by recirculating the cement to the surface from a point 50 feet below the lowermost USDW; or
(ii) Isolating all USDWs by placing cement between the outermost casing and the well bore; and
(2) Isolate any injection zones by placing sufficient cement to fill the calculated space between the casing and the well bore to a point 250 feet above the injection zone; and
(3) Use cement:
(i) Of sufficient quantity and quality to withstand the maximum operating pressure;
(ii) Which is resistent to deterioration from formation and injection fluids; and
(iii) In quantity no less than 120% of the calculated volume necessary to cement off a zone.
(4) The Regional Administrator may specify other requirements in addition to or in lieu of the requirements set forth in paragraphs (b) (1) through (3) as needed to protect USDWs.

Title 40 published on 2013-07-01

no entries appear in the Federal Register after this date.

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 147 after this date.

  • 2013-08-09; vol. 78 # 154 - Friday, August 9, 2013
    1. 78 FR 48639 - North Dakota Underground Injection Control Program Revision Application
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of public comment period and opportunity to request a public hearing.
      Comments will be accepted until September 9, 2013. Any member of the public can request a public hearing on this matter. A public hearing will only be held if requests indicate there is significant public interest. Request for a public hearing will be accepted until September 9, 2013. Requests for a public hearing may be mailed to: Craig Boomgaard EPA Region 8, 1595 Wynkoop Street, MSC 8P-W-UIC, Denver, Colorado, 80202. For additional information regarding the public hearing, please contact Craig Boomgaard (303) 312-6794 or boomgaard.craig@epa.gov.
      40 CFR Part 147