§ 265.195 Inspections.
(a) The owner or operator must inspect, where present, at least once each operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature gauges, monitoring wells) to ensure that the tank system is being operated according to its design.
Note:
Section 265.15(c) requires the owner or operator to remedy any deterioration or malfunction he finds. Section 265.196 requires the owner or operator to notify the Regional Administrator within 24 hours of confirming a release. Also, 40 CFR part 302 may require the owner or operator to notify the National Response Center of a release.
(b) Except as noted under the paragraph (c) of this section, the owner or operator must inspect at least once each operating day:
(1) Overfill/spill control equipment (e.g., waste-feed cutoff systems, bypass systems, and drainage systems) to ensure that it is in good working order;
(2) Above ground portions of the tank system, if any, to detect corrosion or releases of waste; and
(3) The construction materials and the area immediately surrounding the externally accessible portion of the tank system, including the secondary containment system (e.g., dikes) to detect erosion or signs of releases of hazardous waste (e.g., wet spots, dead vegetation).
(c) Owners or operators of tank systems that either use leak detection equipment to alert facility personnel to leaks, or implement established workplace practices to ensure leaks are promptly identified, must inspect at least weekly those areas described in paragraphs (b)(1) through (3) of this section. Use of the alternate inspection schedule must be documented in the facility's operating record. This documentation must include a description of the established workplace practices at the facility.
(d) Performance Track member facilities may inspect on a less frequent basis, upon approval by the Director, but must inspect at least once each month. To apply for a less than weekly inspection frequency, the Performance Track member facility must follow the procedures described in § 265.15(b)(5).
(e) Ancillary equipment that is not provided with secondary containment, as described in § 265.193(f)(1) through (4), must be inspected at least once each operating day.
(f) The owner or operator must inspect cathodic protection systems, if present, according to, at a minimum, the following schedule to ensure that they are functioning properly:
(1) The proper operation of the cathodic protection system must be confirmed within six months after initial installation, and annually thereafter; and
(2) All sources of impressed current must be inspected and/or tested, as appropriate, at least bimonthly (i.e., every other month).
Note:
The practices described in the National Association of Corrosion Engineers (NACE) standard, “Recommended Practice (RP-02-85)—Control of External Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” and the American Petroleum Institute (API) Publication 1632, “Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems,” may be used, where applicable, as guidelines in maintaining and inspecting cathodic protection systems.
(g) The owner or operator must document in the operating record of the facility an inspection of those items in paragraphs (a) and (b) of this section.
[51 FR 25479, July 14, 1986; 51 FR 29430, Aug. 15, 1986, as amended at 71 FR 16910, Apr. 4, 2006]

Title 40 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-02-07; vol. 79 # 26 - Friday, February 7, 2014
    1. 79 FR 7518 - Hazardous Waste Management System; Modification of the Hazardous Waste Manifest System; Electronic Manifests
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective as a final agency action on August 6, 2014. However, the implementation and compliance date for these regulations will be delayed until such time as the e-Manifest system is shown to be ready for operation and the schedule of fees for manifest related services has been announced. EPA will publish a further document subsequent to this rule's effective date to announce the user fee schedule for manifest related activities. This document will also announce the date upon which compliance with this regulation will be required and upon which EPA will be ready to receive electronic manifests through the national e-Manifest system, in accordance with 40 CFR 3.2(a)(2).
      40 CFR Parts 260, 262, 263, 264, 265, and 271

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 265 after this date.

  • 2014-02-07; vol. 79 # 26 - Friday, February 7, 2014
    1. 79 FR 7518 - Hazardous Waste Management System; Modification of the Hazardous Waste Manifest System; Electronic Manifests
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective as a final agency action on August 6, 2014. However, the implementation and compliance date for these regulations will be delayed until such time as the e-Manifest system is shown to be ready for operation and the schedule of fees for manifest related services has been announced. EPA will publish a further document subsequent to this rule's effective date to announce the user fee schedule for manifest related activities. This document will also announce the date upon which compliance with this regulation will be required and upon which EPA will be ready to receive electronic manifests through the national e-Manifest system, in accordance with 40 CFR 3.2(a)(2).
      40 CFR Parts 260, 262, 263, 264, 265, and 271