§ 265.302 Action leakage rate.
(a) The owner or operator of landfill units subject to § 265.301(a) must submit a proposed action leakage rate to the Regional Administrator when submitting the notice required under § 265.301(b). Within 60 days of receipt of the notification, the Regional Administrator will: Establish an action leakage rate, either as proposed by the owner or operator or modified using the criteria in this section; or extend the review period for up to 30 days. If no action is taken by the Regional Administrator before the original 60 or extended 90 day review periods, the action leakage rate will be approved as proposed by the owner or operator.
(b) The Regional Administrator shall approve an action leakage rate for land fill units subject to § 265.301(a). The action leakage rate is the maximum design flow rate that the leak detection system (LDS) can remove without the fluid head on the bottom liner exceeding 1 foot. The action leakage rate must include an adequate safety margin to allow for uncertainties in the design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation, and location of the LDS, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the LDS, and proposed response actions (e.g., the action leakage rate must consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.).
(c) To determine if the action leakage rate has been exceeded, the owner or operator must convert the weekly or monthly flow rate from the monitoring data obtained under § 265.304 to an average daily flow rate (gallons per acre per day) for each sump. Unless the Regional Administrator approves a different calculation, the average daily flow rate for each sump must be calculated weekly during the active life and closure period, and monthly during the post-closure care period when monthly monitoring is required under § 265.304(b).
[57 FR 3494, Jan. 29, 1992, as amended at 71 FR 40276, July 14, 2006]

Title 40 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-02-07; vol. 79 # 26 - Friday, February 7, 2014
    1. 79 FR 7518 - Hazardous Waste Management System; Modification of the Hazardous Waste Manifest System; Electronic Manifests
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective as a final agency action on August 6, 2014. However, the implementation and compliance date for these regulations will be delayed until such time as the e-Manifest system is shown to be ready for operation and the schedule of fees for manifest related services has been announced. EPA will publish a further document subsequent to this rule's effective date to announce the user fee schedule for manifest related activities. This document will also announce the date upon which compliance with this regulation will be required and upon which EPA will be ready to receive electronic manifests through the national e-Manifest system, in accordance with 40 CFR 3.2(a)(2).
      40 CFR Parts 260, 262, 263, 264, 265, and 271

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 265 after this date.

  • 2014-02-07; vol. 79 # 26 - Friday, February 7, 2014
    1. 79 FR 7518 - Hazardous Waste Management System; Modification of the Hazardous Waste Manifest System; Electronic Manifests
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective as a final agency action on August 6, 2014. However, the implementation and compliance date for these regulations will be delayed until such time as the e-Manifest system is shown to be ready for operation and the schedule of fees for manifest related services has been announced. EPA will publish a further document subsequent to this rule's effective date to announce the user fee schedule for manifest related activities. This document will also announce the date upon which compliance with this regulation will be required and upon which EPA will be ready to receive electronic manifests through the national e-Manifest system, in accordance with 40 CFR 3.2(a)(2).
      40 CFR Parts 260, 262, 263, 264, 265, and 271