40 CFR 35.2015 - State priority system and project priority list.

§ 35.2015 State priority system and project priority list.
(a) General. The Regional Administrator will award grant assistance from annual allotments to projects on a State project priority list developed in accordance with an approved State priority system. The State priority system and list must be designed to achieve optimum water quality management consistent with the goals and requirements of the Act. All projects for building treatment works to be funded by EPA must be included on a State project list, except training facilities funded under section 109(b) of the Act and marine CSO projects funded under section 201(n)(2) of the Act.
(b) State priority system. The State priority system describes the methodology used to rank projects that are considered eligible for assistance. The priority system should give high priority to projects in priority water quality areas. The priority system may also include the administrative, management, and public participation procedures required to develop and revise the State project priority list. The priority system includes at least the following elements:
(1) Criteria.
(i) The priority system shall include at least the following criteria for ranking projects:
(A) The impairment of classified water uses resulting from existing municipal pollutant discharges; and
(B) The extent of surface or ground water use restoration or public health improvement resulting from the reduction in pollution.
(ii) The State may also include other criteria in its priority system for ranking projects, such as the use of innovative or alternative technology, the need to complete a waste treatment system for which a grant for a phase or segment was previously awarded; and the category of need and the existing population affected.
(iii) In ranking phased and segmented projects States must comply with § 35.2108.
(2) Categories of need. All projects must fit into at least one of the categories of need described in this paragraph to be eligible for funding, except as provided in paragraphs (b)(2) (iii) and (iv) of this section. States will have sole authority to determine the priority for each category of need.
(i) Before October 1, 1984, these categories of need shall include at least the following:
(A) Secondary treatment (category I);
(B) Treatment more stringent than secondary (category II);
(C) Infiltration/inflow correction (category IIIA);
(D) Major sewer system rehabilitation (category IIIB);
(E) New collector sewers and appurtenances (category IVA);
(F) New interceptors and appurtenances (category IVB);
(G) Correction of combined sewer overflows (category V).
(ii) After September 30, 1984, except as provided in paragraphs (b)(2) (iii) and (iv) of this section, these categories of need shall include only the following:
(A) Secondary treatment or any cost-effective alternative;
(B) Treatment more stringent than secondary or any cost-effective alternative;
(C) New interceptors and appurtenances; and
(D) Infiltration/inflow correction.
(iii) After September 30, 1984, up to 20 percent (as determined by the Governor) of a State's annual allotment may be used for categories of need other than those listed in paragraph (b)(2)(ii) of this section and for any purpose for which grants may be made under sections 319 (h) and (i) of the Act (including any innovative and alternative approaches for the control of nonpoint sources of pollution).
(iv) After September 30, 1984, the Governor may include in the priority system a category for projects needed to correct combined sewer overflows which result in impaired uses in priority water quality areas. Only projects which comply with the requirements of § 35.2024(a) may be included in this category.
(c) Project priority list. The State's annual project priority list is an ordered listing of projects for which the State expects Federal financial assistance. The priority list contains two portions: the fundable portion, consisting of those projects anticipated to be funded from funds available for obligation; and the planning portion, consisting of projects anticipated to be funded from future authorized allotments.
(1) The State shall develop the project priority list consistent with the criteria established in the approved priority system. In ranking projects, the State must also consider total funds available, needs and priorities set forth in areawide water quality management plans, and any other factors contained in the State priority system.
(2) The list shall include an estimate of the eligible cost of each project.
(d) Public participation.
(1) In addition to any requirements in 40 CFR part 25, the State shall hold public hearings as follows:
(i) Before submitting its priority system to the Regional Administrator for approval and before adopting any significant change to an approved priority system; and
(ii) Before submitting its annual project priority list to the Regional Administrator for acceptance and before revising its priority list unless the State agency and the Regional Administrator determine that the revision is not significant.
(iii) If the approved State priority system contains procedures for bypassing projects on the fundable portion of the priority list, such bypasses will not be significant revisions for purposes of this section.
(2) Public hearings may be conducted as directed in the State's continuing planning process document or may be held in conjunction with any regular public meeting of the State agency.
(e) Regional Administrator review. The State must submit its priority system, project priority list and revisions of the priority system or priority list to the Regional Administrator for review. The State must also submit each year, by August 31, a new priority list for use in the next fiscal year.
(1) After submission and approval of the initial priority system and submission and acceptance of the project priority lists under paragraph (c) of this section, the State may revise its priority system and list as necessary.
(2) The Regional Administrator shall review the State priority system and any revisions to insure that they are designed to obtain compliance with the criteria established in accordance with paragraphs (b) and (d) of this section and the enforceable requirements of the Act as defined in § 35.2005(b)(15). The Regional Administrator shall complete review of the priority system within 30 days of receipt of the system from the State and will notify the State in writing of approval or disapproval of the priority system, stating any reasons for disapproval.
(3) The Regional Administrator will review the project priority list and any revisions to insure compliance with the State's approved priority system and the requirements of paragraph (c) of this section. The Regional Administrator will complete review of the project priority list within 30 days of receipt from the State and will notify the State in writing of acceptance or rejection, stating the reasons for the rejection. Any project which is not contained on an accepted current priority list will not receive funding.
(f) Compliance with the enforceable requirements of the Act.
(1) Except as limited under paragraph (f)(2) of this section, the Regional Administrator, after a public hearing, shall require the removal of a specific project or portion thereof from the State project priority list if the Regional Administrator determines it will not contribute to compliance with the enforceable requirements of the Act.
(2) The Regional Administrator shall not require removal of projects in categories under paragraphs (b)(2)(i) (D) through (G) of this section which do not meet the enforceable requirements of the Act unless the total Federal share of such projects would exceed 25 percent of the State's annual allotment.
[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27095, June 29, 1990]

Title 40 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 7 - AGRICULTURE
U.S. Code: Title 15 - COMMERCE AND TRADE
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 1251 - Congressional declaration of goals and policy

§ 1252 - Comprehensive programs for water pollution control

§ 1252a - Reservoir projects, water storage; modification; storage for other than for water quality, opinion of Federal agency, committee...certain prescribed water quality benefits in relation to total project benefits

§ 1253 - Interstate cooperation and uniform laws

§ 1254 - Research, investigations, training, and information

§ 1254a - Research on effects of pollutants

§ 1255 - Grants for research and development

§ 1256 - Grants for pollution control programs

§ 1257 - Mine water pollution control demonstrations

§ 1257a - State demonstration programs for cleanup of abandoned mines for use as waste disposal sites; authorization of appropriations

§ 1258 - Pollution control in the Great Lakes

§ 1259 - Training grants and contracts

§ 1260 - Applications; allocation

§ 1261 - Scholarships

§ 1262 - Definitions and authorizations

§ 1263 - Alaska village demonstration projects

§ 1263a - Grants to Alaska to improve sanitation in rural and Native villages

§ 1264 - Omitted

§ 1265 - In-place toxic pollutants

§ 1266 - Hudson River reclamation demonstration project

§ 1267 - Chesapeake Bay

§ 1268 - Great Lakes

§ 1269 - Long Island Sound

§ 1270 - Lake Champlain Basin Program

§ 1271 - Sediment survey and monitoring

§ 1271a - Research and development program

§ 1272 - Environmental dredging

§ 1273 - Lake Pontchartrain Basin

§ 1274 - Wet weather watershed pilot projects

§ 1285 - Allotment of grant funds

§ 1330 - National estuary program

§ 1361 - Administration

§ 1381 - Grants to States for establishment of revolving funds

§ 1382 - Capitalization grant agreements

§ 1383 - Water pollution control revolving loan funds

§ 1384 - Allotment of funds

§ 1385 - Corrective action

§ 1386 - Audits, reports, and fiscal controls; intended use plan

§ 1387 - Authorization of appropriations

U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE

§ 300f - Definitions

42 U.S. Code § 300e–2, 300e–3 - Repealed.

§ 6901 - Congressional findings

§ 6901a - Congressional findings: used oil recycling

§ 6902 - Objectives and national policy

§ 6903 - Definitions

§ 6904 - Governmental cooperation

§ 6905 - Application of chapter and integration with other Acts

§ 6906 - Financial disclosure

§ 6907 - Solid waste management information and guidelines

§ 6908 - Small town environmental planning

§ 6908a - Agreements with Indian tribes

§ 7401 - Congressional findings and declaration of purpose

§ 7402 - Cooperative activities

§ 7403 - Research, investigation, training, and other activities

§ 7404 - Research relating to fuels and vehicles

§ 7405 - Grants for support of air pollution planning and control programs

§ 7406 - Interstate air quality agencies; program cost limitations

§ 7407 - Air quality control regions

§ 7408 - Air quality criteria and control techniques

§ 7409 - National primary and secondary ambient air quality standards

§ 7410 - State implementation plans for national primary and secondary ambient air quality standards

§ 7411 - Standards of performance for new stationary sources

§ 7412 - Hazardous air pollutants

§ 7413 - Federal enforcement

§ 7414 - Recordkeeping, inspections, monitoring, and entry

§ 7415 - International air pollution

§ 7416 - Retention of State authority

§ 7417 - Advisory committees

§ 7418 - Control of pollution from Federal facilities

§ 7419 - Primary nonferrous smelter orders

§ 7420 - Noncompliance penalty

§ 7421 - Consultation

§ 7422 - Listing of certain unregulated pollutants

§ 7423 - Stack heights

§ 7424 - Assurance of adequacy of State plans

§ 7425 - Measures to prevent economic disruption or unemployment

§ 7426 - Interstate pollution abatement

§ 7427 - Public notification

§ 7428 - State boards

§ 7429 - Solid waste combustion

§ 7430 - Emission factors

§ 7431 - Land use authority

§ 9601 - Definitions

§ 9602 - Designation of additional hazardous substances and establishment of reportable released quantities; regulations

§ 9603 - Notification requirements respecting released substances

§ 9604 - Response authorities

§ 9605 - National contingency plan

§ 9606 - Abatement actions

§ 9607 - Liability

§ 9608 - Financial responsibility

§ 9609 - Civil penalties and awards

§ 9610 - Employee protection

§ 9611 - Uses of Fund

§ 9612 - Claims procedure

§ 9613 - Civil proceedings

§ 9614 - Relationship to other law

§ 9615 - Presidential delegation and assignment of duties or powers and promulgation of regulations

§ 9616 - Schedules

§ 9617 - Public participation

§ 9618 - High priority for drinking water supplies

§ 9619 - Response action contractors

§ 9620 - Federal facilities

§ 9621 - Cleanup standards

§ 9622 - Settlements

§ 9623 - Reimbursement to local governments

§ 9624 - Methane recovery

§ 9625 -

§ 9626 - Indian tribes

§ 9627 - Recycling transactions

§ 9628 - State response programs

§ 13101 - Findings and policy

§ 13102 - Definitions

§ 13103 - EPA activities

§ 13104 - Grants to States for State technical assistance programs

§ 13105 - Source Reduction Clearinghouse

§ 13106 - Source reduction and recycling data collection

§ 13107 - EPA report

§ 13108 - Savings provisions

§ 13109 - Authorization of appropriations

Statutes at Large
Presidential Documents

Executive Order ... 12580

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 35 after this date.

  • 2014-03-18; vol. 79 # 52 - Tuesday, March 18, 2014
    1. 79 FR 15090 - Clean Air Act Grant: South Coast Air Quality Management District; Opportunity for Public Hearing
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Proposed Action; determination with request for comments and notice of opportunity for public hearing.
      Comments and/or requests for a public hearing must be received by EPA at the address stated below by April 17, 2014.
      40 CFR Part 35