40 CFR 35.927-5 - Project procedures.

Status message

There is 1 rule appearing in the Federal Register for 40 CFR 35. View below or at eCFR (GPOAccess)
§ 35.927-5 Project procedures.
(a) State certification. The State agency may (but need not) certify that excessive infiltration/inflow does or does not exist. The Regional Administrator will determine that excessive infiltration/inflow does not exist on the basis of State certification, if he finds that the State had adequately established the basis for its certification through submission of only the minimum information necessary to enable a judgment to be made. Such information could include a preliminary review by the applicant or State, for example, of such parameters as per capita design flow, ratio of flow to design flow, flow records or flow estimates, bypasses or overflows, or summary analysis of hydrological, geographical, and geological conditions, but this review would not usually be equivalent to a complete infiltration/inflow analysis. State certification must be on a project-by-project basis. If, on the basis of State certification, the Regional Administrator determines that the treatment works is or may be subject to excessive infiltration/inflow, no step 2 or step 3 grant assistance may be awarded except as paragraph (c) of this section provides.
(b) Pre-award sewer system evaluation. Generally, except as otherwise provided in paragraph (c) of this section, an adequate sewer system evaluation, consisting of a sewer system analysis and, if required, an evaluation survey, is an essential element of step 1 facilities planning. It is a prerequisite to the award of step 2 or 3 grant assistance. If the Regional Administrator determines through State Certification or an infiltration/inflow analysis that excessive infiltration/inflow does not exist, step 2 or 3 grant assistance may be awarded. If on the basis of State certification or the infiltration/inflow analysis, the Regional Administrator determines that possible excessive infiltration/inflow exists, an adequate sewer system evaluation survey and, if required, a rehabilitation program must be furnished, except as set forth in paragraph (c) of this section before grant assistance for step 2 or 3 can be awarded. A step 1 grant may be awarded for the completion of this segment of step 1 work, and, upon completion of step 1, grant assistance for a step 2 or 3 project (for which priority has been determined under § 35.915) may be awarded.
(c) Exception. If the Regional Administrator determines that the treatment works would be regarded (in the absence of an acceptable program of correction) as being subject to excessive infiltration/inflow, grant assistance may be awarded if the applicant establishes to the Regional Administrator's satisfaction that the treatment works project for which grant application is made will not be significantly changed by any subsequent rehabilitation program or will be a component part of any rehabilitated system. The applicant must agree to complete the sewer system evaluation and any resulting rehabilitation on an implementation schedule the State accepts (subject to approval by the Regional Administrator), which shall be inserted as a special condition in the grant agreement.
(d) Regional Administrator review. Municipalities may submit through the State agency the infiltration/inflow analysis and, when appropriate, the sewer system evaluation survey to the Regional Administrator for his review at any time before application for a treatment works grant. Based on such a review, the Regional Administrator shall provide the municipality with a written response indicating either his concurrence or nonconcurrence. In order for the survey to be an allowable cost, the Regional Administrator must concur with the sewer system evaluation survey plan before the work is performed.

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-12-19; vol. 79 # 244 - Friday, December 19, 2014
    1. 79 FR 75872 - Federal Awarding Agency Regulatory Implementation of Office of Management and Budget's Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards
      GPO FDSys XML | Text
      DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, AGENCY FOR INTERNATIONAL DEVELOPMENT, NATIONAL SCIENCE FOUNDATION, CORPORATION FOR NATIONAL AND COMMUNITY SERVICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION, DEPARTMENT OF TREASURY, NATIONAL ENDOWMENT FOR THE ARTS, DEPARTMENT OF TRANSPORTATION, GULF COAST ECOSYSTEM RESTORATION COUNCIL, DEPARTMENT OF HEALTH AND HUMAN SERVICES, EXECUTIVE OFFICE OF THE PRESIDENT, DEPARTMENT OF LABOR, ENVIRONMENTAL PROTECTION AGENCY, INSTITUTE OF MUSEUM AND LIBRARY SERVICES, DEPARTMENT OF DEFENSE, NATIONAL ENDOWMENT FOR THE HUMANITIES, NATIONAL AERONAUTICS AND SPACE ADMINISTRATION, DEPARTMENT OF THE INTERIOR, DEPARTMENT OF COMMERCE, DEPARTMENT OF AGRICULTURE, DEPARTMENT OF ENERGY, DEPARTMENT OF HOMELAND SECURITY, SOCIAL SECURITY ADMINISTRATION, DEPARTMENT OF STATE, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF EDUCATION, DEPARTMENT OF JUSTICE, SMALL BUSINESS ADMINISTRATION, National Institute of Food and Agriculture, Rural Utilities Service, Rural Housing Service, Office of the Chief Financial Officer, Farm Service Agency, Office of National Drug Control Policy, Office of Management and Budget, Commodity Credit Corporation, Rural Business-Cooperative Service, Federal Emergency Management Agency
      Interim final rule.
      Effective date: This interim final rule is effective on December 26, 2014. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of December 26, 2014. Implementation dates: For grants authorized under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, this rule is applicable for emergency or major disaster declarations issued on or after December 26, 2014. For non-Federal entities that are nonprofit organizations or institutions of higher education (IHEs), there is a one-year grace period for implementation of the procurement standards in 2 CFR 200.317 through 200.326. As will be detailed in the 2015 OMB Compliance Supplement, non-Federal entities choosing to delay implementation for the procurement standards will need to specify in their documented policies and procedures that they continue to comply with OMB circular A-110 for one additional fiscal year which begins after December 26, 2014. Comment date: To be assured of consideration, comments must be received by OMB electronically through www.regulations.gov no later than midnight Eastern Standard Time (E.S.T.) on February 17, 2015.
      2 CFR Parts 1, 25, 170, 180, and 200

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 7 - AGRICULTURE
U.S. Code: Title 15 - COMMERCE AND TRADE
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 1251 - Congressional declaration of goals and policy

§ 1252 - Comprehensive programs for water pollution control

§ 1252a - Reservoir projects, water storage; modification; storage for other than for water quality, opinion of Federal agency, committee...certain prescribed water quality benefits in relation to total project benefits

§ 1253 - Interstate cooperation and uniform laws

§ 1254 - Research, investigations, training, and information

§ 1254a - Research on effects of pollutants

§ 1255 - Grants for research and development

§ 1256 - Grants for pollution control programs

§ 1257 - Mine water pollution control demonstrations

§ 1257a - State demonstration programs for cleanup of abandoned mines for use as waste disposal sites; authorization of appropriations

§ 1258 - Pollution control in the Great Lakes

§ 1259 - Training grants and contracts

§ 1260 - Applications; allocation

§ 1261 - Scholarships

§ 1262 - Definitions and authorizations

§ 1263 - Alaska village demonstration projects

§ 1263a - Grants to Alaska to improve sanitation in rural and Native villages

§ 1264 - Omitted

§ 1265 - In-place toxic pollutants

§ 1266 - Hudson River reclamation demonstration project

§ 1267 - Chesapeake Bay

§ 1268 - Great Lakes

§ 1269 - Long Island Sound

§ 1270 - Lake Champlain Basin Program

§ 1271 - Sediment survey and monitoring

§ 1271a - Research and development program

§ 1272 - Environmental dredging

§ 1273 - Lake Pontchartrain Basin

§ 1274 - Watershed pilot projects

§ 1285 - Allotment of grant funds

§ 1330 - National estuary program

§ 1361 - Administration

§ 1381 - Grants to States for establishment of revolving funds

§ 1382 - Capitalization grant agreements

§ 1383 - Water pollution control revolving loan funds

§ 1384 - Allotment of funds

§ 1385 - Corrective action

§ 1386 - Audits, reports, and fiscal controls; intended use plan

§ 1387 - Authorization of appropriations

U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE

§ 300f - Definitions

42 U.S. Code § 300e–2, 300e–3 - Repealed.

§ 6901 - Congressional findings

§ 6901a - Congressional findings: used oil recycling

§ 6902 - Objectives and national policy

§ 6903 - Definitions

§ 6904 - Governmental cooperation

§ 6905 - Application of chapter and integration with other Acts

§ 6906 - Financial disclosure

§ 6907 - Solid waste management information and guidelines

§ 6908 - Small town environmental planning

§ 6908a - Agreements with Indian tribes

§ 7401 - Congressional findings and declaration of purpose

§ 7402 - Cooperative activities

§ 7403 - Research, investigation, training, and other activities

§ 7404 - Research relating to fuels and vehicles

§ 7405 - Grants for support of air pollution planning and control programs

§ 7406 - Interstate air quality agencies; program cost limitations

§ 7407 - Air quality control regions

§ 7408 - Air quality criteria and control techniques

§ 7409 - National primary and secondary ambient air quality standards

§ 7410 - State implementation plans for national primary and secondary ambient air quality standards

§ 7411 - Standards of performance for new stationary sources

§ 7412 - Hazardous air pollutants

§ 7413 - Federal enforcement

§ 7414 - Recordkeeping, inspections, monitoring, and entry

§ 7415 - International air pollution

§ 7416 - Retention of State authority

§ 7417 - Advisory committees

§ 7418 - Control of pollution from Federal facilities

§ 7419 - Primary nonferrous smelter orders

§ 7420 - Noncompliance penalty

§ 7421 - Consultation

§ 7422 - Listing of certain unregulated pollutants

§ 7423 - Stack heights

§ 7424 - Assurance of adequacy of State plans

§ 7425 - Measures to prevent economic disruption or unemployment

§ 7426 - Interstate pollution abatement

§ 7427 - Public notification

§ 7428 - State boards

§ 7429 - Solid waste combustion

§ 7430 - Emission factors

§ 7431 - Land use authority

§ 9601 - Definitions

§ 9602 - Designation of additional hazardous substances and establishment of reportable released quantities; regulations

§ 9603 - Notification requirements respecting released substances

§ 9604 - Response authorities

§ 9605 - National contingency plan

§ 9606 - Abatement actions

§ 9607 - Liability

§ 9608 - Financial responsibility

§ 9609 - Civil penalties and awards

§ 9610 - Employee protection

§ 9611 - Uses of Fund

§ 9612 - Claims procedure

§ 9613 - Civil proceedings

§ 9614 - Relationship to other law

§ 9615 - Presidential delegation and assignment of duties or powers and promulgation of regulations

§ 9616 - Schedules

§ 9617 - Public participation

§ 9618 - High priority for drinking water supplies

§ 9619 - Response action contractors

§ 9620 - Federal facilities

§ 9621 - Cleanup standards

§ 9622 - Settlements

§ 9623 - Reimbursement to local governments

§ 9624 - Methane recovery

§ 9625 -

§ 9626 - Indian tribes

§ 9627 - Recycling transactions

§ 9628 - State response programs

§ 13101 - Findings and policy

§ 13102 - Definitions

§ 13103 - EPA activities

§ 13104 - Grants to States for State technical assistance programs

§ 13105 - Source Reduction Clearinghouse

§ 13106 - Source reduction and recycling data collection

§ 13107 - EPA report

§ 13108 - Savings provisions

§ 13109 - Authorization of appropriations

Statutes at Large
Presidential Documents

Executive Order ... 12580

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 35 after this date.

  • 2014-12-19; vol. 79 # 244 - Friday, December 19, 2014
    1. 79 FR 75872 - Federal Awarding Agency Regulatory Implementation of Office of Management and Budget's Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards
      GPO FDSys XML | Text
      DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, AGENCY FOR INTERNATIONAL DEVELOPMENT, NATIONAL SCIENCE FOUNDATION, CORPORATION FOR NATIONAL AND COMMUNITY SERVICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION, DEPARTMENT OF TREASURY, NATIONAL ENDOWMENT FOR THE ARTS, DEPARTMENT OF TRANSPORTATION, GULF COAST ECOSYSTEM RESTORATION COUNCIL, DEPARTMENT OF HEALTH AND HUMAN SERVICES, EXECUTIVE OFFICE OF THE PRESIDENT, DEPARTMENT OF LABOR, ENVIRONMENTAL PROTECTION AGENCY, INSTITUTE OF MUSEUM AND LIBRARY SERVICES, DEPARTMENT OF DEFENSE, NATIONAL ENDOWMENT FOR THE HUMANITIES, NATIONAL AERONAUTICS AND SPACE ADMINISTRATION, DEPARTMENT OF THE INTERIOR, DEPARTMENT OF COMMERCE, DEPARTMENT OF AGRICULTURE, DEPARTMENT OF ENERGY, DEPARTMENT OF HOMELAND SECURITY, SOCIAL SECURITY ADMINISTRATION, DEPARTMENT OF STATE, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF EDUCATION, DEPARTMENT OF JUSTICE, SMALL BUSINESS ADMINISTRATION, National Institute of Food and Agriculture, Rural Utilities Service, Rural Housing Service, Office of the Chief Financial Officer, Farm Service Agency, Office of National Drug Control Policy, Office of Management and Budget, Commodity Credit Corporation, Rural Business-Cooperative Service, Federal Emergency Management Agency
      Interim final rule.
      Effective date: This interim final rule is effective on December 26, 2014. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of December 26, 2014. Implementation dates: For grants authorized under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, this rule is applicable for emergency or major disaster declarations issued on or after December 26, 2014. For non-Federal entities that are nonprofit organizations or institutions of higher education (IHEs), there is a one-year grace period for implementation of the procurement standards in 2 CFR 200.317 through 200.326. As will be detailed in the 2015 OMB Compliance Supplement, non-Federal entities choosing to delay implementation for the procurement standards will need to specify in their documented policies and procedures that they continue to comply with OMB circular A-110 for one additional fiscal year which begins after December 26, 2014. Comment date: To be assured of consideration, comments must be received by OMB electronically through www.regulations.gov no later than midnight Eastern Standard Time (E.S.T.) on February 17, 2015.
      2 CFR Parts 1, 25, 170, 180, and 200