40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

§ 35.938-5 Negotiation of contract amendments (change orders).
(a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function may be performed by the grantee directly or, if authorized, by his engineer. During negotiations with the contractor the grantee shall:
(1) Make certain that the contractor has a clear understanding of the scope and extent of work and other essential requirements;
(2) Assure that the contractor demonstrates that he will make available or will obtain the necessary personnel, equipment and materials to accomplish the work within the required time; and
(3) Assure a fair and reasonable price for the required work.
(b) Changes in contract price or time. The contract price or time may be changed only by a change order. When negotiations are required, they shall be conducted in accordance with paragraph (c) or (d) of this section, as appropriate. The value of any work covered by a change order or of any claim for increase or decrease in the contract price shall be determined by the method set forth in paragraphs (b) (1) through (3) of this section which is most advantageous to the grantee.
(1) Unit prices—
(i) Original bid items. Unit prices previously approved are acceptable for pricing changes of original bid items. However, when changes in quantities exceed 15 percent of the original bid quantity and the total dollar change of that bid item is significant, the grantee shall review the unit price to determine if a new unit price should be negotiated.
(ii) New items. Unit prices of new items shall be negotiated.
(2) A lump sum to be negotiated.
(3) Cost reimbursement— the actual cost for labor, direct overhead, materials, supplies, equipment, and other services necessary to complete the work plus an amount to be agreed upon to cover the cost of general overhead and profit to be negotiated.
(c) For each change order not in excess of $100,000 the contractor shall submit sufficient cost and pricing data to the grantee to enable the grantee to determine the necessity and reasonableness of costs and amounts proposed, and the allowability and eligibility of costs proposed.
(d) For each change order in excess of $100,000, the contractor shall submit to the grantee for review sufficient cost and pricing data as described in paragraphs (d) (1) through (6) of this section to enable the grantee to ascertain the necessity and reasonableness of costs and amounts proposed, and the allowability and eligibility of costs proposed.
(1) As a minimum, proposed change order costs shall be presented on EPA Form 5700-41 on which the contractor shall certify that proposed costs reflect complete, current, and accurate cost and pricing data applicable to the date of the change order.
(2) In addition to the specific elements of cost, the estimated amount of profit shall be set forth separately in the cost summary for fixed price change orders and a specific total dollar amount of profit will be set forth separately in the cost summary for cost reimbursement change orders.
(3) The grantee may require more detailed cost data than the form requires in order to substantiate the reasonableness of proposed change order costs. EPA normally requires more detailed documentation only when the contractor is unable to certify that proposed change order cost data are complete, current, and accurate. EPA may, on a selected basis, perform a detailed cost analysis on any change order.
(4) Appropriate consideration should be given to § 30.710 of this subchapter which contains general cost principles which must be used for the determination and allowability of costs under grants. The contractor's actual costs, direct and indirect, allowable for Federal participation shall be determined in accordance with the terms and conditions of the contract, this subpart and the cost principles included in 41 CFR 1-15.2 and 1-15.4. Examples of costs which are not allowable under those cost principles include, but are not limited to, entertainment, interest on borrowed capital and bad debts.
(5) For costs under cost reimbursement change orders, the contractor shall have an accounting system which accounts for such costs in accordance with generally accepted accounting principles. This system shall provide for the identification, accumulation and segregation of allowable and unallowable change orders. Allowable change order costs shall be determined in accordance with paragraph (d)(4) of this section. The contractor must propose and account for such costs in a manner consistent with his normal accounting procedures.
(6) Change orders awarded on the basis of review of a cost element summary and a certification of complete, current, and accurate cost and pricing data shall be subject to downward renegotiation or recoupment of funds where subsequent audit substantiates that such certification was not based on complete, current and accurate cost and pricing data and on costs allowable under the appropriate FPR cost principles (41 CFR 1-15.2 and 1-15.4) at the time of change order execution.
(e) EPA review. In addition to the requirements of §§ 35.935-10 (copies of contract documents) and 35.935-11 (project changes), the grantee shall submit, before the execution of any change order in excess of $100,000, to the EPA Project Officer for review:
(1) The cost and pricing data the contractor submitted;
(2) A certification of review and acceptance of the contractor's cost or price; and
(3) A copy of the proposed change order.
(f) Profit. The objective of negotiations shall be the exercise of sound business judgment and good administrative practice including the determination of a fair and reasonable profit based on the contractor's assumption of risk and input to total performance and not merely the application of a predetermined percentage factor. For the purpose of negotiated change orders to construction contracts under EPA grants, profit is defined as the net proceeds obtained by deducting all allowable costs (direct and indirect) from the price. The grantee should review the estimate or profit as he reviews all other elements of price.
(g) Related work. Related work shall not be split into two amendments or change orders merely to keep it under $100,000 and thereby avoid the requirements of paragraph (d) of this section. For change orders which include both additive and deductive items:
(1) If any single item (additive or deductive) exceeds $100,000, the requirements of paragraph (d) of this section shall be applicable.
(2) If no single additive or deductive item has a value of $100,000, but the total price of the change order is over $100,000, the requirements of paragraph (d) of this section shall be applicable.
(3) If the total of additive items of work in the change order exceeds $100,000, or the total of deductive items of work in the change order exceeds $100,000, and the net price of the change order is less than $100,000, the requirements of paragraph (d) of this section shall apply.

Title 40 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 7 - AGRICULTURE
U.S. Code: Title 15 - COMMERCE AND TRADE
U.S. Code: Title 33 - NAVIGATION AND NAVIGABLE WATERS

§ 1251 - Congressional declaration of goals and policy

§ 1252 - Comprehensive programs for water pollution control

§ 1252a - Reservoir projects, water storage; modification; storage for other than for water quality, opinion of Federal agency, committee...certain prescribed water quality benefits in relation to total project benefits

§ 1253 - Interstate cooperation and uniform laws

§ 1254 - Research, investigations, training, and information

§ 1254a - Research on effects of pollutants

§ 1255 - Grants for research and development

§ 1256 - Grants for pollution control programs

§ 1257 - Mine water pollution control demonstrations

§ 1257a - State demonstration programs for cleanup of abandoned mines for use as waste disposal sites; authorization of appropriations

§ 1258 - Pollution control in the Great Lakes

§ 1259 - Training grants and contracts

§ 1260 - Applications; allocation

§ 1261 - Scholarships

§ 1262 - Definitions and authorizations

§ 1263 - Alaska village demonstration projects

§ 1263a - Grants to Alaska to improve sanitation in rural and Native villages

§ 1264 - Omitted

§ 1265 - In-place toxic pollutants

§ 1266 - Hudson River reclamation demonstration project

§ 1267 - Chesapeake Bay

§ 1268 - Great Lakes

§ 1269 - Long Island Sound

§ 1270 - Lake Champlain Basin Program

§ 1271 - Sediment survey and monitoring

§ 1271a - Research and development program

§ 1272 - Environmental dredging

§ 1273 - Lake Pontchartrain Basin

§ 1274 - Watershed pilot projects

§ 1285 - Allotment of grant funds

§ 1330 - National estuary program

§ 1361 - Administration

§ 1381 - Grants to States for establishment of revolving funds

§ 1382 - Capitalization grant agreements

§ 1383 - Water pollution control revolving loan funds

§ 1384 - Allotment of funds

§ 1385 - Corrective action

§ 1386 - Audits, reports, and fiscal controls; intended use plan

§ 1387 - Authorization of appropriations

U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE

§ 300f - Definitions

42 U.S. Code § 300e–2, 300e–3 - Repealed.

§ 6901 - Congressional findings

§ 6901a - Congressional findings: used oil recycling

§ 6902 - Objectives and national policy

§ 6903 - Definitions

§ 6904 - Governmental cooperation

§ 6905 - Application of chapter and integration with other Acts

§ 6906 - Financial disclosure

§ 6907 - Solid waste management information and guidelines

§ 6908 - Small town environmental planning

§ 6908a - Agreements with Indian tribes

§ 7401 - Congressional findings and declaration of purpose

§ 7402 - Cooperative activities

§ 7403 - Research, investigation, training, and other activities

§ 7404 - Research relating to fuels and vehicles

§ 7405 - Grants for support of air pollution planning and control programs

§ 7406 - Interstate air quality agencies; program cost limitations

§ 7407 - Air quality control regions

§ 7408 - Air quality criteria and control techniques

§ 7409 - National primary and secondary ambient air quality standards

§ 7410 - State implementation plans for national primary and secondary ambient air quality standards

§ 7411 - Standards of performance for new stationary sources

§ 7412 - Hazardous air pollutants

§ 7413 - Federal enforcement

§ 7414 - Recordkeeping, inspections, monitoring, and entry

§ 7415 - International air pollution

§ 7416 - Retention of State authority

§ 7417 - Advisory committees

§ 7418 - Control of pollution from Federal facilities

§ 7419 - Primary nonferrous smelter orders

§ 7420 - Noncompliance penalty

§ 7421 - Consultation

§ 7422 - Listing of certain unregulated pollutants

§ 7423 - Stack heights

§ 7424 - Assurance of adequacy of State plans

§ 7425 - Measures to prevent economic disruption or unemployment

§ 7426 - Interstate pollution abatement

§ 7427 - Public notification

§ 7428 - State boards

§ 7429 - Solid waste combustion

§ 7430 - Emission factors

§ 7431 - Land use authority

§ 9601 - Definitions

§ 9602 - Designation of additional hazardous substances and establishment of reportable released quantities; regulations

§ 9603 - Notification requirements respecting released substances

§ 9604 - Response authorities

§ 9605 - National contingency plan

§ 9606 - Abatement actions

§ 9607 - Liability

§ 9608 - Financial responsibility

§ 9609 - Civil penalties and awards

§ 9610 - Employee protection

§ 9611 - Uses of Fund

§ 9612 - Claims procedure

§ 9613 - Civil proceedings

§ 9614 - Relationship to other law

§ 9615 - Presidential delegation and assignment of duties or powers and promulgation of regulations

§ 9616 - Schedules

§ 9617 - Public participation

§ 9618 - High priority for drinking water supplies

§ 9619 - Response action contractors

§ 9620 - Federal facilities

§ 9621 - Cleanup standards

§ 9622 - Settlements

§ 9623 - Reimbursement to local governments

§ 9624 - Methane recovery

§ 9625 -

§ 9626 - Indian tribes

§ 9627 - Recycling transactions

§ 9628 - State response programs

§ 13101 - Findings and policy

§ 13102 - Definitions

§ 13103 - EPA activities

§ 13104 - Grants to States for State technical assistance programs

§ 13105 - Source Reduction Clearinghouse

§ 13106 - Source reduction and recycling data collection

§ 13107 - EPA report

§ 13108 - Savings provisions

§ 13109 - Authorization of appropriations

Statutes at Large
Presidential Documents

Executive Order ... 12580

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 35 after this date.

  • 2014-07-03; vol. 79 # 128 - Thursday, July 3, 2014
    1. 79 FR 37974 - Clean Air Act Grant: Santa Barbara County Air Pollution Control District; Opportunity for Public Hearing
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Proposed action; Determination with request for comments and notice of opportunity for public hearing.
      Comments and/or requests for a public hearing must be received by EPA at the address stated below by August 4, 2014.
      40 CFR Part 35