§ 45.150 Reports.
(a) Recipients must submit the reports required in 40 CFR 30.505.
(b) A draft of the final project report is required 90 days before the end of the project period. The recipient shall prepare the final projects report in accordance with the project officer's instructions, and submit the final project report within 30 days after the end of the project period.