40 CFR 65.167 - Other reports.

§ 65.167 Other reports.
(a) Replacing an existing control or recovery device. As specified in § 65.147(b)(2), § 65.148(b)(3), § 65.149(b)(3), § 65.150(b)(2), § 65.151(b)(2), § 65.152(b)(2), or § 65.153(b)(2), if an owner or operator at a facility not required to obtain a title V permit elects at a later date to use a different control or recovery device, then the Administrator shall be notified by the owner or operator before implementing the change. This notification may be included in the facility's periodic reporting and shall include a description of any changes made to the closed vent system.
(b) Startup, shutdown, and malfunction periodic reports. Startup, shutdown, and malfunction periodic reports shall be submitted as required in § 65.6(c).

Title 40 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code