40 CFR 98.456 - Data reporting requirements.

§ 98.456 Data reporting requirements.
In addition to the information required by § 98.3(c), each annual report must contain the following information for each chemical at the facility level:
(a) Pounds of SF6 and PFCs stored in containers at the beginning of the year.
(b) Pounds of SF6 and PFCs stored in containers at the end of the year.
(c) Pounds of SF6 and PFCs purchased in bulk.
(d) Pounds of SF6 and PFCs returned by equipment users with or inside equipment.
(e) Pounds of SF6 and PFCs returned to site from off site after recycling.
(f) Pounds of SF6 and PFCs inside new equipment delivered to customers.
(g) Pounds of SF6 and PFCs delivered to equipment users in containers.
(h) Pounds of SF6 and PFCs returned to suppliers.
(i) Pounds of SF6 and PFCs sent off site for destruction.
(j) Pounds of SF6 and PFCs sent off site to be recycled.
(k) The nameplate capacity of the equipment, in pounds, delivered to customers with SF6 or PFCs inside, if different from the quantity in paragraph (f) of this section.
(l) A description of the engineering methods and calculations used to determine emissions from hoses or other flow lines that connect the container to the equipment that is being filled.
(m) The values for EFC for each hose and valve combination and the associated valve fitting sizes and hose diameters.
(n) The total number of fill operations for each hose and valve combination, or, FCi of Equation SS-5 of this subpart.
(o) The mean value for each make, model, and group of conditions if the mass of SF6 or the PFC disbursed to customers in new equipment over the period p is determined by assuming that it is equal to the equipment's nameplate capacity or, in cases where equipment is shipped with a partial charge, equal to its partial shipping charge.
(p) The number of samples and the upper and lower bounds on the 95 percent confidence interval for each make, model, and group of conditions if the mass of SF6 or the PFC disbursed to customers in new equipment over the period p is determined by assuming that it is equal to the equipment's nameplate capacity or, in cases where equipment is shipped with a partial charge, equal to its partial shipping charge.
(q) Pounds of SF6 and PFCs used to fill equipment at off-site electric power transmission or distribution locations, or MF, of Equation SS-6 of this subpart.
(r) Pounds of SF6 and PFCs used to charge the equipment prior to leaving the electrical equipment manufacturer or refurbishment facility, or MC, of Equation SS-6 of this subpart.
(s) The nameplate capacity of the equipment, in pounds, installed at off-site electric power transmission or distribution locations used to determine emissions from installation, or NI, of Equation SS-6 of this subpart.
(t) For any missing data, you must report the reason the data were missing, the parameters for which the data were missing, the substitute parameters used to estimate emissions in their absence, and the quantity of emissions thereby estimated.

Title 40 published on 2014-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 98 after this date.

  • 2014-07-31; vol. 79 # 147 - Thursday, July 31, 2014
    1. 79 FR 44332 - Greenhouse Gas Reporting Program: Addition of Global Warming Potentials
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Proposed rule.
      Comments must be received on or before September 2, 2014, unless a hearing is requested. If a hearing is requested, comments must be received on or before September 15, 2014. Public Hearing. The EPA does not plan to conduct a public hearing unless requested. To request a hearing, please contact the person listed in the following FOR FURTHER INFORMATION CONTACT section by August 7, 2014. Upon such request, the EPA will hold the hearing on August 15, 2014, in the Washington, DC area. The EPA will provide further information about the hearing on the Greenhouse Gas Reporting Program Web site, http://www.epa.gov/climatechange/emissions/ghgrulemaking.html if a hearing is requested.
      40 CFR Part 98