Figure E-1 to Subpart E of Part 53—Designation Testing Checklist
DESIGNATION TESTING CHECKLIST
______________________________
AuditeeAuditor signatureDate
Compliance Status:Y = YesN = NoNA = Not applicable/Not available Verification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date)
Verification Verified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53 or 40 CFR Part 50, Appendix L
Y N NA
Performance Specification Tests
Sample flow rate coefficient of variation (§ 53.53) (L-7.4.3)
Filter temperature control (sampling) (§ 53.57) (L-7.4.10)
Elapsed sample time accuracy (§ 53.54) (L-7.4.13)
Filter temperature control (post sampling) (§ 53.57) (L-7.4.10)
Application Specification Tests
Field Precision (§ 53.58) (L-5.1)
Meets all Appendix L requirements (part 53, subpart A, § 53.2(a)(3)) (part 53, subpart E, § 53.51(a),(d))
Filter Weighing (L-8)
Field Sampling Procedure (§ 53.30, .31, .34)
Design Specification Tests
Filter (L-6)
Range of Operational Conditions (L-7.4.7)
The Following Requirements Apply Only to Class I Candidate Equivalent Methods
Aerosol Transport (§ 53.59)

Title 40 published on 2013-07-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE
Statutes at Large
Public Laws

91-604