Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to Subpart HHHHH
As specified in § 63.8095, the parts of the General Provisions that apply to you are shown in the following table:
Citation Subject Explanation
§ 63.1 Applicability Yes.
§ 63.2 Definitions Yes.
§ 63.3 Units and Abbreviations Yes.
§ 63.4 Prohibited Activities Yes.
§ 63.5 Construction/Reconstruction Yes.
§ 63.6(a) Applicability Yes.
§ 63.6(b)(1)-(4) Compliance Dates for New and Reconstructed sources Yes.
§ 63.6(b)(5) Notification Yes.
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become Major Yes.
§ 63.6(c)(1)-(2) Compliance Dates for Existing Sources Yes.
§ 63.6(c)(3)-(4) [Reserved]
§ 63.6(c)(5) Compliance Dates for Existing Area Sources That Become Major Yes.
§ 63.6(d) [Reserved]
§ 63.6(e)(1)-(2) Operation & Maintenance Yes.
§ 63.6(e)(3)(i), (ii), and (v) through (viii) SSMP Yes, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in § 63.8080(f).
§ 63.6(e)(3)(iii) and (iv) Recordkeeping and Reporting During Startup, Shutdown, and Malfunction (SSM) No, §§ 63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify the recordkeeping requirement for SSM events, and § 63.8075(e)(5) specifies reporting requirements.
§ 63.6(e)(3)(ix) Title V permit Yes.
§ 63.6(f)(1) Compliance Except During SSM Yes.
§ 63.6(f)(2)-(3) Methods for Determining Compliance Yes.
§ 63.6(g)(1)-(3) Alternative Standard Yes.
§ 63.6(h) Opacity/Visible Emission (VE) Standards Only for flares for which Method 22 observations are required as part of a flare compliance assessment.
§ 63.6(i)(1)-(14) Compliance Extension Yes.
§ 63.6(j) Presidential Compliance Exemption Yes.
§ 63.7(a)(1)-(2) Performance Test Dates Yes, except substitute 150 days for 180 days.
§ 63.7(a)(3) CAA Section 114 Authority Yes, and this paragraph also applies to flare compliance assessments as specified under § 63.997(b)(2).
§ 63.7(b)(1) Notification of Performance Test Yes.
§ 63.7(b)(2) Notification of Rescheduling Yes.
§ 63.7(c) Quality Assurance/Test Plan Yes, except the test plan must be submitted with the notification of the performance test if the control device controls process vessels.
§ 63.7(d) Testing Facilities Yes.
§ 63.7(e)(1) Conditions for Conducting Performance Tests Yes, except that performance tests for process vessels must be conducted under worst-case conditions as specified in § 63.8005.
§ 63.7(e)(2) Conditions for Conducting Performance Tests Yes.
§ 63.7(e)(3) Test Run Duration Yes.
§ 63.7(f) Alternative Test Method Yes.
§ 63.7(g) Performance Test Data Analysis Yes.
§ 63.7(h) Waiver of Tests Yes.
§ 63.8(a)(1) Applicability of Monitoring Requirements Yes.
§ 63.8(a)(2) Performance Specifications Yes.
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring with Flares Yes.
§ 63.8(b)(1) Monitoring Yes.
§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring Systems Yes.
§ 63.8(c)(1) Monitoring System Operation and Maintenance Yes.
§ 63.8(c)(1)(i) Maintain and operate CMS Yes.
§ 63.8(c)(1)(ii) Routine repairs Yes.
§ 63.8(c)(1)(iii) SSMP for CMS Yes.
§ 63.8(c)(2)-(3) Monitoring System Installation Yes.
§ 63.8(c)(4) Requirements Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63. This subpart does not contain requirements for continuous opacity monitoring systems (COMS).
§ 63.8(c)(4)(i) CMS Requirements No. This subpart does not require COMS.
§ 63.8(c)(4)(ii) CMS requirements Yes.
§ 63.8(c)(5) COMS Minimum Procedures No. This subpart does not contain opacity or VE limits.
§ 63.8(c)(6) CMS Requirements Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.8(c)(7)-(8) CMS Requirements Only for CEMS. Requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.8(d) CMS Quality Control Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.8(e) CMS Performance Evaluation Section 63.8(e)(6)(ii) does not apply because this subpart does not require COMS. Other sections apply only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.8(f)(1)-(5) Alternative Monitoring Method Yes, except you may also request approval using the precompliance report.
§ 63.8(f)(6) Alternative to Relative Accuracy Test Only for CEMS.
§ 63.8(g)(1)-(4) Data Reduction Only when using CEMS, except § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.8000(d)(4)(iv).
The requirements for COMS do not apply because this subpart has no opacity or VE limits.
§ 63.8(g)(5) Data Reduction No. Requirements for CEMS are specified in § 63.8000(d)(4).
Requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.9(a) Notification Requirements Yes.
§ 63.9(b)(1)-(5) Initial Notifications Yes.
§ 63.9(c) Request for Compliance Extension Yes.
§ 63.9(d) Notification of Special Compliance Requirements for New Source Yes.
§ 63.9(e) Notification of Performance Test Yes.
§ 63.9(f) Notification of VE/Opacity Test No. This subpart does not contain opacity or VE limits.
§ 63.9(g) Additional Notifications When Using CMS Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.9(h)(1)-(6) Notification of Compliance Status Yes, except this subpart has no opacity or VE limits, and § 63.9(h)(2) does not apply because § 63.8075(d) specifies the required contents and due date of the notification of compliance status report.
§ 63.9(i) Adjustment of Submittal Deadlines Yes.
§ 63.9(j) Change in Previous Information No, § 63.8075(e)(8) specifies reporting requirements for process changes.
§ 63.10(a) Recordkeeping/Reporting Yes.
§ 63.10(b)(1) Recordkeeping/Reporting Yes.
§ 63.10(b)(2)(i)-(iv) Records related to SSM No, §§ 63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify recordkeeping requirements for periods of SSM.
§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipment Yes.
§ 63.10(b)(2)(vi), (x), and (xi) CMS Records Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.10(b)(2)(vii)-(ix) Records Yes.
§ 63.10(b)(2)(xii) Records Yes.
§ 63.10(b)(2)(xiii) Records Yes.
§ 63.10(b)(2)(xiv) Records Yes.
§ 63.10(b)(3) Records Yes.
§ 63.10(c)(1)-(6),(9)-(15) Records Only for CEMS; requirements for CPMS are specified in referenced subpart SS of 40 CFR part 63.
§ 63.10(c)(7)-(8) Records No. Recordkeeping requirements are specified in § 63.8080.
§ 63.10(d)(1) General Reporting Requirements Yes.
§ 63.10(d)(2) Report of Performance Test Results Yes.
§ 63.10(d)(3) Reporting Opacity or VE Observations No. This subpart does not contain opacity or VE limits.
§ 63.10(d)(4) Progress Reports Yes.
§ 63.10(d)(5)(i) SSM Reports No, § 63.8075(e)(5) and (6) specify the SSM reporting requirements.
§ 63.10(d)(5)(ii) Immediate SSM reports No.
§ 63.10(e)(1)-(2) Additional CMS Reports Only for CEMS, but § 63.10(e)(2)(ii) does not apply because this subpart does not require COMS.
§ 63.10(e)(3) Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(i)-(iii) Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(iv)-(v) Excess Emissions Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(vi-viii) Excess Emissions Report and Summary Report No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(4) Reporting COMS data No. This subpart does not contain opacity or VE limits.
§ 63.10(f) Waiver for Recordkeeping/Reporting Yes.
§ 63.11 Control and work practice requirements Yes
§ 63.12 Delegation Yes.
§ 63.13 Addresses Yes.
§ 63.14 Incorporation by Reference Yes.
§ 63.15 Availability of Information Yes.
[68 FR 69185, Dec. 11, 2003, as amended at 71 FR 20468, Apr. 20, 2006; 73 FR 78216, Dec. 22, 2008]

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-25; vol. 79 # 227 - Tuesday, November 25, 2014
    1. 79 FR 70102 - National Emission Standards for Hazardous Air Pollutants; Delegation of Authority to Texas
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Direct final rule; delegation of authority.
      This rule is effective on January 26, 2015 without further notice, unless EPA receives relevant adverse comment by December 26, 2014. If EPA receives such comment, EPA will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-12-12; vol. 79 # 239 - Friday, December 12, 2014
    1. 79 FR 73872 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing; Extension of Comment Period
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of proposed rulemaking; extension of public comment period.
      Comments. The public comment period for the proposed rule published in the Federal Register on November 7, 2014, (79 FR 66512) is being extended for 30 days to January 21, 2015.
      40 CFR Parts 60 and 63