40 CFR Appendix Table 10 to Subpart HHHHH of Part 63 - Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart
Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart
As specified in § 63.8095, the parts of the general provisions that apply to you are shown in the following table:
Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart
Citation | Subject | Explanation |
---|---|---|
§ 63.1 | Applicability | Yes. |
§ 63.2 | Definitions | Yes. |
§ 63.3 | Units and Abbreviations | Yes. |
§ 63.4 | Prohibited Activities | Yes. |
§ 63.5 | Construction/Reconstruction | Yes. |
§ 63.6(a) | Applicability | Yes. |
§ 63.6(b)(1)–(4) | Compliance Dates for New and Reconstructed sources | Yes. |
§ 63.6(b)(5) | Notification | Yes. |
§ 63.6(b)(6) | [Reserved] | |
§ 63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Yes. |
§ 63.6(c)(1)–(2) | Compliance Dates for Existing Sources | Yes. |
§ 63.6(c)(3)–(4) | [Reserved] | |
§ 63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Yes. |
§ 63.6(d) | [Reserved] | |
§ 63.6(e)(1)(i) | General Duty to Minimize Emissions | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty requirement. |
§ 63.6(e)(1)(ii) | Requirement to Correct Malfunctions as Soon as Possible | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). |
§ 63.6(e)(1)(iii)–(2) | Operation and Maintenance | Yes. |
§ 63.6(e)(3) | SSM Plan | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). |
§ 63.6(f)(1) | Compliance with Non-Opacity Standards Except During SSM | No. See § 63.8000(a). |
§ 63.6(f)(2)–(3) | Methods for Determining Compliance | Yes. |
§ 63.6(g)(1)–(3) | Alternative Standard | Yes. |
§ 63.6(h)(1) | Compliance with Opacity/Visible Emission (VE) Standards Except During SSM | No. See § 63.8000(a). |
§ 63.6(h)(2)–(9) | Opacity/VE Standards | Only for flares for which Method 22 of 40 CFR part 60, appendix A–7, observations are required as part of a flare compliance assessment. |
§ 63.6(i)(1)–(14) | Compliance Extension | Yes. |
§ 63.6(j) | Presidential Compliance Exemption | Yes. |
§ 63.7(a)(1)–(2) | Performance Test Dates | Yes, except substitute 150 days for 180 days. |
§ 63.7(a)(3)–(4) | CAA Section 114 Authority, Force Majeure | Yes, and these paragraphs also apply to flare compliance assessments as specified under § 63.997(b)(2). |
§ 63.7(b)(1) | Notification of Performance Test | Yes. |
§ 63.7(b)(2) | Notification of Rescheduling | Yes. |
§ 63.7(c) | Quality Assurance/Test Plan | Yes, except the test plan must be submitted with the notification of the performance test if the control device controls process vessels. |
§ 63.7(d) | Testing Facilities | Yes. |
§ 63.7(e)(1) | Conditions for Conducting Performance Tests | Yes, before the compliance date specified in § 63.7995(e), except that performance tests for process vessels must be conducted under worst-case conditions as specified in § 63.8005. No, on and after the compliance date specified in § 63.7995(e). See § 63.8005(d). |
§ 63.7(e)(2) | Conditions for Conducting Performance Tests | Yes. |
§ 63.7(e)(3) | Test Run Duration | Yes. |
§ 63.7(f) | Alternative Test Method | Yes. |
§ 63.7(g) | Performance Test Data Analysis | Yes. |
§ 63.7(h) | Waiver of Tests | Yes. |
§ 63.8(a)(1) | Applicability of Monitoring Requirements | Yes. |
§ 63.8(a)(2) | Performance Specifications | Yes. |
§ 63.8(a)(3) | [Reserved] | |
§ 63.8(a)(4) | Monitoring with Flares | Yes. |
§ 63.8(b)(1) | Monitoring | Yes. |
§ 63.8(b)(2)–(3) | Multiple Effluents and Multiple Monitoring Systems | Yes. |
§ 63.8(c)(1) | Monitoring System Operation and Maintenance | Yes. |
§ 63.8(c)(1)(i) | Maintain and operate CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty to maintain and operate each CMS. |
§ 63.8(c)(1)(ii) | Routine repairs | Yes. |
§ 63.8(c)(1)(iii) | Requirement to develop SSM plan for CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). |
§ 63.8(c)(2)–(3) | Monitoring System Installation | Yes. |
§ 63.8(c)(4) | Requirements | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. This subpart does not contain requirements for continuous opacity monitoring systems (COMS). |
§ 63.8(c)(4)(i) | CMS Requirements | No. This subpart does not require COMS. |
§ 63.8(c)(4)(ii) | CMS requirements | Yes. |
§ 63.8(c)(5) | COMS Minimum Procedures | No. This subpart does not contain opacity or VE limits. |
§ 63.8(c)(6) | CMS Requirements | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.8(c)(7)–(8) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.8(d)(1)–(2) | CMS Quality Control | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.8(d)(3) | Written procedures for CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(d)(8). |
§ 63.8(e) | CMS Performance Evaluation | Section 63.8(e)(6)(ii) does not apply because this subpart does not require COMS. Other sections apply only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.8(f)(1)–(5) | Alternative Monitoring Method | Yes, except you may also request approval using the precompliance report. |
§ 63.8(f)(6) | Alternative to Relative Accuracy Test | Only for CEMS. |
§ 63.8(g)(1)–(4) | Data Reduction | Only when using CEMS, except § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.8000(d)(4)(iv).
The requirements for COMS do not apply because this subpart has no opacity or VE limits. |
§ 63.8(g)(5) | Data Reduction | No. Requirements for CEMS are specified in § 63.8000(d)(4). Requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.9(a) | Notification Requirements | Yes. |
§ 63.9(b)(1)–(5) | Initial Notifications | Yes. |
§ 63.9(c) | Request for Compliance Extension | Yes. |
§ 63.9(d) | Notification of Special Compliance Requirements for New Source | Yes. |
§ 63.9(e) | Notification of Performance Test | Yes. |
§ 63.9(f) | Notification of VE/Opacity Test | No. This subpart does not contain opacity or VE limits. |
§ 63.9(g) | Additional Notifications When Using CMS | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.9(h)(1)–(6) | Notification of Compliance Status | Yes, except this subpart has no opacity or VE limits, and § 63.9(h)(2) does not apply because § 63.8075(d) specifies the required contents and due date of the notification of compliance status report. |
§ 63.9(i) | Adjustment of Submittal Deadlines | Yes. |
§ 63.9(j) | Change in previous information | Yes, for change in major source status, otherwise § 63.8075(e)(8) specifies reporting requirements for process changes. |
§ 63.9(k) | Electronic reporting procedures | Yes, as specified in § 63.9(j). |
§ 63.10(a) | Recordkeeping/Reporting | Yes. |
§ 63.10(b)(1) | Recordkeeping/Reporting | Yes. |
§ 63.10(b)(2)(i)–(ii) | Records related to SSM | No. Before the compliance date specified in § 63.7995(e), see § 63.998(c)(1)(ii)(D) through (G) and (d)(3) for recordkeeping requirements for periods of SSM. On and after the compliance date specified in § 63.7995(e), see § 63.8080(i). |
§ 63.10(b)(2)(iii) | Records related to maintenance of air pollution control equipment | Yes. |
§ 63.10(b)(2)(iv)–(v) | Records related to SSM | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). |
§ 63.10(b)(2)(vi), (x), and (xi) | CMS Records | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.10(b)(2)(vii)–(ix) | Records | Yes. |
§ 63.10(b)(2)(xii) | Records | Yes. |
§ 63.10(b)(2)(xiii) | Records | Yes. |
§ 63.10(b)(2)(xiv) | Records | Yes. |
§ 63.10(b)(3) | Records | Yes. |
§ 63.10(c)(1)–(6), (9)–(14) | Records | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. |
§ 63.10(c)(7)–(8), (15) | Records | No. Recordkeeping requirements are specified in § 63.8080. |
§ 63.10(d)(1) | General Reporting Requirements | Yes. |
§ 63.10(d)(2) | Report of Performance Test Results | Yes. |
§ 63.10(d)(3) | Reporting Opacity or VE Observations | No. This subpart does not contain opacity or VE limits. |
§ 63.10(d)(4) | Progress Reports | Yes. |
§ 63.10(d)(5)(i) | SSM Reports | No. Before the compliance date specified in § 63.7995(e), see § 63.8075(e)(5) and (6) for the SSM reporting requirements. On and after the compliance date specified in § 63.7995(e), these requirements no longer apply. |
§ 63.10(d)(5)(ii) | Immediate SSM reports | No. |
§ 63.10(e)(1)–(2) | Additional CMS Reports | Only for CEMS, but § 63.10(e)(2)(ii) does not apply because this subpart does not require COMS. |
§ 63.10(e)(3) | Reports | No. Reporting requirements are specified in § 63.8075. |
§ 63.10(e)(3)(i)–(iii) | Reports | No. Reporting requirements are specified in § 63.8075. |
§ 63.10(e)(3)(iv)–(v) | Excess Emissions Reports | No. Reporting requirements are specified in § 63.8075. |
§ 63.10(e)(3)(vi–viii) | Excess Emissions Report and Summary Report | No. Reporting requirements are specified in § 63.8075. |
§ 63.10(e)(4) | Reporting COMS data | No. This subpart does not contain opacity or VE limits. |
§ 63.10(f) | Waiver for Recordkeeping/Reporting | Yes. |
§ 63.11 | Control and work practice requirements | Yes. |
§ 63.12 | Delegation | Yes. |
§ 63.13 | Addresses | Yes. |
§ 63.14 | Incorporation by Reference | Yes. |
§ 63.15 | Availability of Information | Yes. |
[85 FR 49749, Aug. 14, 2020, as amended at 85 FR 73914, Nov. 19, 2020]