40 CFR Appendix Table 10 to Subpart HHHHH of Part 63 - Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart

Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart

As specified in § 63.8095, the parts of the general provisions that apply to you are shown in the following table:

Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart

Citation Subject Explanation
§ 63.1 Applicability Yes.
§ 63.2 Definitions Yes.
§ 63.3 Units and Abbreviations Yes.
§ 63.4 Prohibited Activities Yes.
§ 63.5 Construction/Reconstruction Yes.
§ 63.6(a) Applicability Yes.
§ 63.6(b)(1)–(4) Compliance Dates for New and Reconstructed sources Yes.
§ 63.6(b)(5) Notification Yes.
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become Major Yes.
§ 63.6(c)(1)–(2) Compliance Dates for Existing Sources Yes.
§ 63.6(c)(3)–(4) [Reserved]
§ 63.6(c)(5) Compliance Dates for Existing Area Sources That Become Major Yes.
§ 63.6(d) [Reserved]
§ 63.6(e)(1)(i) General Duty to Minimize Emissions Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty requirement.
§ 63.6(e)(1)(ii) Requirement to Correct Malfunctions as Soon as Possible Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e).
§ 63.6(e)(1)(iii)–(2) Operation and Maintenance Yes.
§ 63.6(e)(3) SSM Plan Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e).
§ 63.6(f)(1) Compliance with Non-Opacity Standards Except During SSM No. See § 63.8000(a).
§ 63.6(f)(2)–(3) Methods for Determining Compliance Yes.
§ 63.6(g)(1)–(3) Alternative Standard Yes.
§ 63.6(h)(1) Compliance with Opacity/Visible Emission (VE) Standards Except During SSM No. See § 63.8000(a).
§ 63.6(h)(2)–(9) Opacity/VE Standards Only for flares for which Method 22 of 40 CFR part 60, appendix A–7, observations are required as part of a flare compliance assessment.
§ 63.6(i)(1)–(14) Compliance Extension Yes.
§ 63.6(j) Presidential Compliance Exemption Yes.
§ 63.7(a)(1)–(2) Performance Test Dates Yes, except substitute 150 days for 180 days.
§ 63.7(a)(3)–(4) CAA Section 114 Authority, Force Majeure Yes, and these paragraphs also apply to flare compliance assessments as specified under § 63.997(b)(2).
§ 63.7(b)(1) Notification of Performance Test Yes.
§ 63.7(b)(2) Notification of Rescheduling Yes.
§ 63.7(c) Quality Assurance/Test Plan Yes, except the test plan must be submitted with the notification of the performance test if the control device controls process vessels.
§ 63.7(d) Testing Facilities Yes.
§ 63.7(e)(1) Conditions for Conducting Performance Tests Yes, before the compliance date specified in § 63.7995(e), except that performance tests for process vessels must be conducted under worst-case conditions as specified in § 63.8005. No, on and after the compliance date specified in § 63.7995(e). See § 63.8005(d).
§ 63.7(e)(2) Conditions for Conducting Performance Tests Yes.
§ 63.7(e)(3) Test Run Duration Yes.
§ 63.7(f) Alternative Test Method Yes.
§ 63.7(g) Performance Test Data Analysis Yes.
§ 63.7(h) Waiver of Tests Yes.
§ 63.8(a)(1) Applicability of Monitoring Requirements Yes.
§ 63.8(a)(2) Performance Specifications Yes.
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring with Flares Yes.
§ 63.8(b)(1) Monitoring Yes.
§ 63.8(b)(2)–(3) Multiple Effluents and Multiple Monitoring Systems Yes.
§ 63.8(c)(1) Monitoring System Operation and Maintenance Yes.
§ 63.8(c)(1)(i) Maintain and operate CMS Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty to maintain and operate each CMS.
§ 63.8(c)(1)(ii) Routine repairs Yes.
§ 63.8(c)(1)(iii) Requirement to develop SSM plan for CMS Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e).
§ 63.8(c)(2)–(3) Monitoring System Installation Yes.
§ 63.8(c)(4) Requirements Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. This subpart does not contain requirements for continuous opacity monitoring systems (COMS).
§ 63.8(c)(4)(i) CMS Requirements No. This subpart does not require COMS.
§ 63.8(c)(4)(ii) CMS requirements Yes.
§ 63.8(c)(5) COMS Minimum Procedures No. This subpart does not contain opacity or VE limits.
§ 63.8(c)(6) CMS Requirements Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(c)(7)–(8) CMS Requirements Only for CEMS. Requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(d)(1)–(2) CMS Quality Control Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(d)(3) Written procedures for CMS Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(d)(8).
§ 63.8(e) CMS Performance Evaluation Section 63.8(e)(6)(ii) does not apply because this subpart does not require COMS. Other sections apply only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(f)(1)–(5) Alternative Monitoring Method Yes, except you may also request approval using the precompliance report.
§ 63.8(f)(6) Alternative to Relative Accuracy Test Only for CEMS.
§ 63.8(g)(1)–(4) Data Reduction Only when using CEMS, except § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.8000(d)(4)(iv).
The requirements for COMS do not apply because this subpart has no opacity or VE limits.
§ 63.8(g)(5) Data Reduction No. Requirements for CEMS are specified in § 63.8000(d)(4). Requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.9(a) Notification Requirements Yes.
§ 63.9(b)(1)–(5) Initial Notifications Yes.
§ 63.9(c) Request for Compliance Extension Yes.
§ 63.9(d) Notification of Special Compliance Requirements for New Source Yes.
§ 63.9(e) Notification of Performance Test Yes.
§ 63.9(f) Notification of VE/Opacity Test No. This subpart does not contain opacity or VE limits.
§ 63.9(g) Additional Notifications When Using CMS Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.9(h)(1)–(6) Notification of Compliance Status Yes, except this subpart has no opacity or VE limits, and § 63.9(h)(2) does not apply because § 63.8075(d) specifies the required contents and due date of the notification of compliance status report.
§ 63.9(i) Adjustment of Submittal Deadlines Yes.
§ 63.9(j) Change in previous information Yes, for change in major source status, otherwise § 63.8075(e)(8) specifies reporting requirements for process changes.
§ 63.9(k) Electronic reporting procedures Yes, as specified in § 63.9(j).
§ 63.10(a) Recordkeeping/Reporting Yes.
§ 63.10(b)(1) Recordkeeping/Reporting Yes.
§ 63.10(b)(2)(i)–(ii) Records related to SSM No. Before the compliance date specified in § 63.7995(e), see § 63.998(c)(1)(ii)(D) through (G) and (d)(3) for recordkeeping requirements for periods of SSM. On and after the compliance date specified in § 63.7995(e), see § 63.8080(i).
§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipment Yes.
§ 63.10(b)(2)(iv)–(v) Records related to SSM Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e).
§ 63.10(b)(2)(vi), (x), and (xi) CMS Records Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.10(b)(2)(vii)–(ix) Records Yes.
§ 63.10(b)(2)(xii) Records Yes.
§ 63.10(b)(2)(xiii) Records Yes.
§ 63.10(b)(2)(xiv) Records Yes.
§ 63.10(b)(3) Records Yes.
§ 63.10(c)(1)–(6), (9)–(14) Records Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.10(c)(7)–(8), (15) Records No. Recordkeeping requirements are specified in § 63.8080.
§ 63.10(d)(1) General Reporting Requirements Yes.
§ 63.10(d)(2) Report of Performance Test Results Yes.
§ 63.10(d)(3) Reporting Opacity or VE Observations No. This subpart does not contain opacity or VE limits.
§ 63.10(d)(4) Progress Reports Yes.
§ 63.10(d)(5)(i) SSM Reports No. Before the compliance date specified in § 63.7995(e), see § 63.8075(e)(5) and (6) for the SSM reporting requirements. On and after the compliance date specified in § 63.7995(e), these requirements no longer apply.
§ 63.10(d)(5)(ii) Immediate SSM reports No.
§ 63.10(e)(1)–(2) Additional CMS Reports Only for CEMS, but § 63.10(e)(2)(ii) does not apply because this subpart does not require COMS.
§ 63.10(e)(3) Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(i)–(iii) Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(iv)–(v) Excess Emissions Reports No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(3)(vi–viii) Excess Emissions Report and Summary Report No. Reporting requirements are specified in § 63.8075.
§ 63.10(e)(4) Reporting COMS data No. This subpart does not contain opacity or VE limits.
§ 63.10(f) Waiver for Recordkeeping/Reporting Yes.
§ 63.11 Control and work practice requirements Yes.
§ 63.12 Delegation Yes.
§ 63.13 Addresses Yes.
§ 63.14 Incorporation by Reference Yes.
§ 63.15 Availability of Information Yes.
[85 FR 49749, Aug. 14, 2020, as amended at 85 FR 73914, Nov. 19, 2020]