40 CFR Part 63, Subpart JJJ, Table 1 to Subpart JJJ of Part 63 - Applicability of general provisions to subpart JJJ affected sources

Status message

There are 7 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
prev | next
View PDF at GPO Pt. 63, Subpt. JJJ, Table 1
Table 1 to Subpart JJJ of Part 63—Applicability of general provisions to subpart JJJ affected sources
Reference Applies toSubpart JJJ Explanation
a The plan and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.
§ 63.1(a)(1) Yes § 63.1312 specifies definitions in addition to or that supersede definitions in § 63.2.
§ 63.1(a)(2) Yes
§ 63.1(a)(3) Yes § 63.1311(g) through (l) and § 63.160(b) identify those standards which may apply in addition to the requirements of subparts JJJ and H of this part, and specify how compliance shall be achieved.
§ 63.1(a)(4) Yes Subpart JJJ (this table) specifies the applicability of each paragraph in subpart A to subpart JJJ.
§ 63.1(a)(5) No [Reserved.].
§ 63.1(a)(6)-(8) Yes
§ 63.1(a)(9) No [Reserved.].
§ 63.1(a)(10) Yes
§ 63.1(a)(11) Yes
§ 63.1(a)(12)-(14) Yes
§ 63.1(b)(1) No § 63.1310(a) contains specific applicability criteria.
§ 63.1(b)(2) Yes
§ 63.1(b)(3) No § 63.1310(b) provides documentation requirements for TPPUs not considered affected sources.
§ 63.1(c)(1) Yes Subpart JJJ (this table) specifies the applicability of each paragraph in subpart A to subpart JJJ.
§ 63.1(c)(2) No Area sources are not subject to subpart JJJ.
§ 63.1(c)(3) No [Reserved.].
§ 63.1(c)(4) Yes
§ 63.1(c)(5) Yes Except that affected sources are not required to submit notifications that are not required by subpart JJJ.
§ 63.1(d) No [Reserved.].
§ 63.1(e) Yes
§ 63.2 Yes § 63.1312 specifies those subpart A definitions that apply to subpart JJJ.
§ 63.3 Yes
§ 63.4(a)(1)-(3) Yes
§ 63.4(a)(4) No [Reserved.].
§ 63.4(a)(5) Yes
§ 63.4(b) Yes
§ 63.4(c) Yes
§ 63.5(a)(1) Yes Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.”
§ 63.5(a)(2) Yes
§ 63.5(b)(1) Yes Except § 63.1310(i) defines when construction or reconstruction is subject to new source standards.
§ 63.5(b)(2) No [Reserved.].
§ 63.5(b)(3) Yes
§ 63.5(b)(4) Yes Except that the Initial Notification and § 63.9(b) requirements do not apply.
§ 63.5(b)(5) Yes
§ 63.5(b)(6) Yes Except that § 63.1310(i) defines when construction or reconstruction is subject to new source standards.
§ 63.5(c) No [Reserved.]
§ 63.5(d)(1)(i) Yes Except that the references to the Initial Notification and § 63.9(b)(5) do not apply.
§ 63.5(d)(1)(ii) Yes Except that § 63.5(d)(1)(ii)(H) does not apply.
§ 63.5(d)(1)(iii) No §§ 63.1335(e)(5) and 63.1331(a)(4) specify Notification of Compliance Status requirements.
§ 63.5(d)(2) No
§ 63.5(d)(3) Yes Except § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.1331 are exempt.
§ 63.5(d)(4) Yes
§ 63.5(e) Yes
§ 63.5(f)(1) Yes
§ 63.5(f)(2) Yes Except that where § 63.9(b)(2) is referred to, the owner or operator need not comply.
§ 63.6(a) Yes
§ 63.6(b)(1) No The dates specified in § 63.1311(b) apply, instead.
§ 63.6(b)(2) No
§ 63.6(b)(3) No
§ 63.6(b)(4) No
§ 63.6(b)(5) No
§ 63.6(b)(6) No [Reserved.].
§ 63.6(b)(7) No
§ 63.6(c)(1) Yes Except that § 63.1311 specifies the compliance date.
§ 63.6(c)(2) No
§ 63.6(c)(3) No [Reserved.].
§ 63.6(c)(4) No [Reserved.].
§ 63.6(c)(5) Yes
§ 63.6(d) No [Reserved.].
§ 63.6(e) Yes Except as otherwise specified for individual paragraphs. Does not apply to Group 2 emission points, unless they are included in an emissions average.a
§ 63.6(e)(1)(i) No This is addressed by § 63.1310(j)(4).
§ 63.6(e)(1)(ii) Yes
§ 63.6(e)(1)(iii) Yes
§ 63.6(e)(2) Yes
§ 63.6(e)(3)(i) Yes For equipment leaks (subject to § 63.1331), the start-up, shutdown, and malfunction plan requirement of § 63.6(e)(3)(i) is limited to control devices and is optional for other equipment. The start-up, shutdown, malfunction plan may include written procedures that identify conditions that justify a delay of repair.
§ 63.6(e)(3)(i)(A) No This is addressed by § 63.1310(j)(4).
§ 63.6(e)(3)(i)(B) Yes
§ 63.6(e)(3)(i)(C) Yes
§ 63.6(e)(3)(ii) Yes
§ 63.6(e)(3)(iii) No Recordkeeping and reporting are specified in § 63.1335(b)(1).
§ 63.6(e)(3)(iv) No Recordkeeping and reporting are specified in § 63.1335(b)(1).
§ 63.6(e)(3)(v) Yes
§ 63.6(e)(3)(vi) Yes
§ 63.6(e)(3)(vii) Yes
§ 63.6(e)(3)(vii)(A) Yes
§ 63.6(e)(3)(vii)(B) Yes Except the plan shall provide for operation in (B) compliance with § 63.1310(j)(4).
§ 63.6(e)(3)(vii)(C) Yes
§ 63.6(e)(3)(viii) Yes
§ 63.6(e)(3)(ix) Yes
§ 63.6(f)(1) Yes
§ 63.6(f)(2) Yes Except § 63.7(c), as referred to in § 63.6(f)(2)(iii)(D), does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.1331.
§ 63.6(f)(3) Yes
§ 63.6(g) Yes
§ 63.6(h) No Subpart JJJ does not require opacity and visible emission standards.
§ 63.6(i)(1) Yes
§ 63.6(i)(2) Yes
§ 63.6(i)(3) Yes
§ 63.6(i)(4)(i)(A) Yes
§ 63.6(i)(4)(i)(B) No Dates are specified in § 63.1311(e) and § 63.1335(e)(3)(i).
§ 63.6(i)(4)(ii) No
§ 63.6(i)(5)-(14) Yes
§ 63.6(i)(15) No [Reserved.].
§ 63.6(i)(16) Yes
§ 63.6(j) Yes
§ 63.7(a)(1) Yes
§ 63.7(a)(2) No § 63.1335(e)(5) specifies the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.
§ 63.7(a)(3) Yes
§ 63.7(b) No § 63.1333(a)(4) specifies notification requirements.
§ 63.7(c) No
§ 63.7(d) Yes
§ 63.7(e)(1) Yes Except that all performance tests shall be conducted at maximum representative operating conditions achievable at the time without disruption of operations or damage to equipment.
§ 63.7(e)(2) Yes
§ 63.7(e)(3) No Subpart JJJ specifies requirements.
§ 63.7(e)(4) Yes
§ 63.7(f) Yes Except that § 63.144(b)(5)(iii)(A) and (B) shall apply for process wastewater. Also, because a site specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3), approval or disapproval of the alternative test method shall not be tied to the site specific test plan.
§ 63.7(g) Yes Except that the requirements in § 63.1335(e)(5) shall apply instead of references to the Notification of Compliance Status report in § 63.9(h). In addition, equipment leaks subject to § 63.1331 are not required to conduct performance tests.
§ 63.7(h) Yes Except § 63.7(h)(4)(ii) is not applicable, because the site-specific test plans in § 63.7(c)(2) are not required.
§ 63.8(a)(1) Yes
§ 63.8(a)(2) No
§ 63.8(a)(3) No [Reserved]
§ 63.8(a)(4) Yes
§ 63.8(b)(1) Yes
§ 63.8(b)(2) No Subpart JJJ specifies locations to conduct monitoring.
§ 63.8(b)(3) Yes
§ 63.8(c)(1) Yes
§ 63.8(c)(1)(i) Yes
§ 63.8(c)(1)(ii) No For all emission points except equipment leaks, comply with § 63.1335(b)(1)(i)(B); for equipment leaks, comply with § 63.181(g)(2)(iii).
§ 63.8(c)(1)(iii) Yes
§ 63.8(c)(2) Yes
§ 63.8(c)(3) Yes
§ 63.8(c)(4) No § 63.1334 specifies monitoring frequency; not applicable to equipment leaks because § 63.1331 does not require continuous monitoring systems.
§ 63.8(c)(5)-(8) No.
§ 63.8(d) No.
§ 63.8(e) No.
§ 63.8(f)(1)-(3) Yes.
§ 63.8(f)(4)(i) No Timeframe for submitting request is specified in § 63.1335(f) or (g); not applicable to equipment leaks because § 63.1331 (through reference to subpart H) specifies acceptable alternative methods.
§ 63.8(f)(4)(ii) No Contents of requests are specified in § 63.1335(f) or (g).
§ 63.8(f)(4)(iii) No.
§ 63.8(f)(5)(i) Yes.
§ 63.8(f)(5)(ii) No.
§ 63.8(f)(5)(iii) Yes.
§ 63.8(f)(6) No Subpart JJJ does not require continuous emission monitors.
§ 63.8(g) No Data reduction procedures specified in § 63.1335(d) and (h); not applicable to equipment leaks.
§ 63.9(a) Yes.
§ 63.9(b) No Subpart JJJ does not require an initial notification.
§ 63.9(c) Yes.
§ 63.9(d) Yes.
§ 63.9(e) No § 63.1333(a)(4) specifies notification deadline.
§ 63.9(f) No Subpart JJJ does not require opacity and visible emission standards.
§ 63.9(g) No.
§ 63.9(h) No § 63.1335(e)(5) specifies Notification of Compliance Status requirements.
§ 63.9(i) Yes.
§ 63.9(j) No.
§ 63.10(a) Yes.
§ 63.10(b)(1) No § 63.1335(a) specifies record retention requirements.
§ 63.10(b)(2) No Subpart JJJ specifies recordkeeping requirements.
§ 63.10(b)(3) No § 63.1310(b) requires documentation of sources that are not affected sources.
§ 63.10(c) No § 63.1335 specifies recordkeeping requirements.
§ 63.10(d)(1) Yes.
§ 63.10(d)(2) No § 63.1335(e) specifies performance test reporting requirements; not applicable to equipment leaks.
§ 63.10(d)(3) No Subpart JJJ does not require opacity and visible emission standards.
§ 63.10(d)(4) Yes.
§ 63.10(d)(5)(i) Yes Except that reports required by § 63.10(d)(5)(i) may be submitted at the same time as Periodic Reports specified in § 63.1335(e)(6). The start-up, shutdown, and malfunction plan, and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.
§ 63.10(d)(5)(ii) No.
§ 63.10(e) No § 63.1335 specifies reporting requirements.
§ 63.10(f) Yes.
§ 63.11 Yes § 63.11(b) specifies requirements for flares used to comply with provisions of this subpart. § 63.1333(e) contains the requirements to conduct compliance demonstrations for flares subject to this subpart. § 63.11(c), (d), and (e) specifies requirements for an alternative work practice for equipment leaks.
§ 63.12 Yes Except that the authority of § 63.1332(i) and the authority of § 63.177 (for equipment leaks) shall not be delegated to States.
§§ 63.13-63.15 Yes.
[66 FR 36939, July 16, 2001, as amended at 71 FR 20460, Apr. 20, 2006; 73 FR 78214, Dec. 22, 2008]

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-25; vol. 79 # 227 - Tuesday, November 25, 2014
    1. 79 FR 70102 - National Emission Standards for Hazardous Air Pollutants; Delegation of Authority to Texas
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Direct final rule; delegation of authority.
      This rule is effective on January 26, 2015 without further notice, unless EPA receives relevant adverse comment by December 26, 2014. If EPA receives such comment, EPA will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-12-12; vol. 79 # 239 - Friday, December 12, 2014
    1. 79 FR 73872 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing; Extension of Comment Period
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of proposed rulemaking; extension of public comment period.
      Comments. The public comment period for the proposed rule published in the Federal Register on November 7, 2014, (79 FR 66512) is being extended for 30 days to January 21, 2015.
      40 CFR Parts 60 and 63