40 CFR Part 63, Subpart LLLLLL, Table 1 to Subpart LLLLLL of Part 63 - Applicability of General Provisions to Subpart LLLLLL

Status message

There are 6 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
prev | next
View PDF at GPO Pt. 63, Subpt. LLLLLL, Table 1
Table 1 to Subpart LLLLLL of Part 63—Applicability of General Provisions to Subpart LLLLLL
Citation Subject Applies to subpart LLLLLL? Explanation
63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes
63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No
63.2 Definitions Yes
63.3 Units and Abbreviations Yes
63.4 Prohibited Activities and Circumvention Yes
63.5 Preconstruction Review and Notification Requirements No
63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f) (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes Subpart LLLLLL requires new and existing sources to comply with requirements for startups, shutdowns, and malfunctions in § 63.6(e)(3).
63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) Reserved No
63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) No Subpart LLLLLL does not include opacity or visible emissions standards or require a continuous opacity monitoring system.
63.7(a), (e), (f), (g), (h) Performance Testing Requirements Yes/No Subpart LLLLLL requires performance tests for new and existing sources; a test for an existing source is not required if a prior test meets the conditions in § 63.11395(h).
63.7(b), (c) Yes/No Requirements for notification of performance test and for quality assurance program apply to new sources but not existing sources.
63.8(a)(1), (a)(2), (b), (c)(1)-(c)(3), (f)(1)-(5) Monitoring Requirements Yes
63.8(a)(3) Reserved No
63.8(a)(4) Yes Requirements apply to new sources if flares are the selected control option.
63.8(c)(4)-(c)(8), (d), (e), (f)(6), (g) Yes Requirements apply to new sources but not to existing sources.
63.9(a), (b)(1), (b)(5), (c), (d), (i), (j) Notification Requirements Yes
63.9(e) Yes/No Notification of performance test is required for new area sources.
63.9(b)(2) Yes Initial notification of applicability is required for new and existing area sources.
63.9(b)(3), (h)(4) Reserved No
63.9(b)(4), (h)(5) No
63.9(f), (g) No Subpart LLLLLL does not require a continuous opacity monitoring system or continuous emissions monitoring system.
63.9(h)(1)-(h)(3), (h)(6) Yes Notification of compliance status is required for new and existing area sources.
63.10(a) Recordkeeping Requirements Yes
63.10(b)(1) Yes/No Record retention requirement applies to new area sources but not existing area sources. Subpart LLLLLL establishes 2-year retention period for existing area sources.
63.10(b)(2) Yes Recordkeeping requirements for startups, shutdowns, and malfunctions apply to new and existing area sources.
63.10(b)(3) Yes Recordkeeping requirements for applicability determinations apply to new area sources.
63.10(c)(1), (c)(5)-(c)(14) Yes/No Recordkeeping requirements for continuous parameter monitoring systems apply to new sources but not existing sources.
63.10(c)(2)-(c)(4), (c)(9) Reserved No
63.10(d)(1), (d)(4), (e)(1), (e)(2), (f) Reporting Requirements Yes
63.10(d)(2) Yes Report of performance test results applies to each area source required to conduct a performance test.
63.10(d)(3) No Subpart LLLLLL does not include opacity or visible emissions limits.
63.10(d)(5) Yes Requirements for startup, shutdown, and malfunction reports apply to new and existing area sources.
(e)(1)-(e)(2), (e)(4) No Subpart LLLLLL does not require a continuous emissions monitoring system or continuous opacity monitoring system.
63.10(e)(3) Yes/No Semiannual reporting requirements for excess emissions and parameter monitoring exceedances apply to new area sources but not existing area sources.
63.11 Control Device Requirements Yes Requirements apply to new sources if flares are the selected control option.
63.12 State Authorities and Delegations Yes
63.13 Addresses Yes
63.14 Incorporations by Reference Yes
63.15 Availability of Information and Confidentiality Yes
63.16 Performance Track Provisions. Yes

Title 40 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-03-27; vol. 79 # 59 - Thursday, March 27, 2014
    1. 79 FR 17340 - National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins; Pesticide Active Ingredient Production; and Polyether Polyols Production
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on March 27, 2014. The incorporation by reference of certain publications listed in this final rule was approved by the Director of the Federal Register as of March 27, 2014.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-03-27; vol. 79 # 59 - Thursday, March 27, 2014
    1. 79 FR 17340 - National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins; Pesticide Active Ingredient Production; and Polyether Polyols Production
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on March 27, 2014. The incorporation by reference of certain publications listed in this final rule was approved by the Director of the Federal Register as of March 27, 2014.
      40 CFR Part 63