40 CFR Part 63, Subpart OOO, Table 5 to Subpart OOO of Part 63 - Reports Required by This Subpart

Status message

There are 7 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
View PDF at GPO Pt. 63, Subpt. OOO, Table 5
Table 5 to Subpart OOO of Part 63—Reports Required by This Subpart
Reference Description of report Due date
a Note that the APPU remains subject to this subpart until the notification under § 63.1400(g)(7) is made.
§ 63.1400(j) and Subpart A of this part Refer to Table 1 and Subpart A of this part Refer to Subpart A of this part.
63.1417(d) Precompliance Report Existing affected sources—12 months prior to the compliance date. New affected sources—with application for approval of construction or reconstruction.
63.1417(e) Notification of Compliance Status Within 150 days after the compliance date.
63.1417(f) Periodic Reports Semiannually, no later than 60 days after the end of each 6-month period. See § 63.1417(f)(1) for the due date for the first report.
63.1417(f)(12) Quarterly reports upon request of the administrator No later than 60 days after the end of each quarter.
63.1417(g) Start-up, shutdown, and malfunction reports Semiannually (same schedule as Periodic reports).
63.1417(h)(1) Notification of storage vessel inspection As specified in 40 CFR part 63, subpart WW.
63.1417(h)(2) Site-specific test plan 90 days prior to planned date of test.
63.1417(h)(3) Notification of planned performance test 30 days prior to planned date of test.
63.1417(h)(4) Notification of change in primary product As specified in § 63.1400 (g)(7) or (g)(8).
63.1417(h)(5) Notification of added emission points 180 days prior to the appropriate compliance date.
63.1417(h)(6) Notification that a small control device has been redesignated as a large control device Within 60 days of the redesignation of control device size.
63.1417(h)(7) Notification of process change Within 60 days after performance test or applicability assessment, whichever is sooner.

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-25; vol. 79 # 227 - Tuesday, November 25, 2014
    1. 79 FR 70102 - National Emission Standards for Hazardous Air Pollutants; Delegation of Authority to Texas
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Direct final rule; delegation of authority.
      This rule is effective on January 26, 2015 without further notice, unless EPA receives relevant adverse comment by December 26, 2014. If EPA receives such comment, EPA will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-12-12; vol. 79 # 239 - Friday, December 12, 2014
    1. 79 FR 73872 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing; Extension of Comment Period
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of proposed rulemaking; extension of public comment period.
      Comments. The public comment period for the proposed rule published in the Federal Register on November 7, 2014, (79 FR 66512) is being extended for 30 days to January 21, 2015.
      40 CFR Parts 60 and 63