40 CFR Part 63, Subpart PPP, Table 1 of Subpart PPP of Part 63 - Applicability of General Provisions to Subpart PPP Affected Sources

Status message

There are 6 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
prev | next
View PDF at GPO Pt. 63, Subpt. PPP, Table 1
Table 1 of Subpart PPP of Part 63—Applicability of General Provisions to Subpart PPP Affected Sources
Reference Applies tosubpart PPP Explanation
a The plan, and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points.
63.1(a)(1) Yes § 63.1423 specifies definitions in addition to or that supersede definitions in § 63.2.
63.1(a)(2) Yes.
63.1(a)(3) Yes § 63.1422(f) through (k) of this subpart and § 63.160(b) identify those standards which overlap with the requirements of subparts PPP and H and specify how compliance shall be achieved.
63.1(a)(4) Yes Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP.
63.1(a)(5) No Reserved.
63.1(a)(6)-(8) Yes.
63.1(a)(9) No. Reserved.
63.1(a)(10) Yes.
63.1(a)(11) Yes.
63.1(a)(12)-(14) Yes.
63.1(b)(1) No § 63.1420(a) contains specific applicability criteria.
63.1(b)(2) Yes.
63.1(b)(3) Yes.
63.1(c)(1) Yes Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP.
63.1(c)(2) No Area sources are not subject to subpart PPP.
63.1(c)(3) No Reserved.
63.1(c)(4) Yes.
63.1(c)(5) Yes Except that affected sources are not required to submit notifications overridden by this table.
63.1(d) No Reserved.
63.1(e) Yes.
63.2 Yes § 63.1423 specifies those subpart A definitions that apply to subpart PPP.
63.3 Yes.
63.4(a)(1)-(3) Yes.
63.4(a)(4) No Reserved.
63.4(a)(5) Yes.
63.4(b) Yes.
63.4(c) Yes.
63.5(a)(1) Yes Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.”
63.5(a)(2) Yes.
63.5(b)(1) Yes Except § 63.1420(g) defines when construction or reconstruction is subject to new source standards.
63.5(b)(2) No Reserved.
63.5(b)(3) Yes.
63.5(b)(4) Yes Except that the initial notification requirements in § 63.1439(e)(3) shall apply instead of the requirements in § 63.9(b).
63.5(b)(5) Yes.
63.5(b)(6) Yes Except that § 63.1420(g) defines when construction or reconstruction is subject to the new source standards.
63.5(c) No Reserved.
63.5(d)(1)(i) Yes.
63.5(d)(1)(ii) Yes Except that § 63.5(d)(1)(ii)(H) does not apply.
63.5(d)(1)(iii) No § 63.1439(e)(5) and § 63.1434(e) specify notification of compliance status requirements.
63.5(d)(2) No.
63.5(d)(3) Yes Except § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.1434 are exempt.
63.5(d)(4) Yes.
63.5(e) Yes.
63.5(f)(1) Yes.
63.5(f)(2) Yes Except that where § 63.9(b)(2) is referred to, the owner or operator need not comply.
63.6(a) Yes.
63.6(b)(1) Yes.
63.6(b)(2) Yes.
63.6(b)(3) Yes.
63.6(b)(4) Yes.
63.6(b)(5) Yes.
63.6(b)(6) No Reserved.
63.6(b)(7) No.
63.6(c)(1) Yes § 63.1422 specifies the compliance date.
63.6(c)(2) No.
63.6(c)(3) No Reserved.
63.6(c)(4) No Reserved.
63.6(c)(5) Yes.
63.6(d) No Reserved.
63.6(e) Yes Except as otherwise specified for individual paragraphs (below), and § 63.6(e) does not apply to Group 2 emission points.
63.6(e)(1)(i) No This is addressed by § 63.1420(h)(4).
63.6(e)(1)(ii) Yes.
63.6(e)(1)(iii) Yes.
63.6(e)(2) Yes.
63.6(e)(3)(i) Yes For equipment leaks (subject to § 63.1434), the start-up, shutdown, and malfunction plan requirement of § 63.6(e)(3)(i) is limited to combustion, recovery, or recapture devices and is optional for other equipment. The start-up, shutdown, and malfunction plan may include written procedures that identify conditions that justify a delay of repair.a
63.6(e)(3)(i)(A) Yes This is also addressed by § 63.1420(h)(4).
63.6(e)(3)(i)(B) Yes.
63.6(e)(3)(i)(C) Yes.
63.6(e)(3)(ii) Yes.
63.6(e)(3)(iii) No Recordkeeping and reporting are specified in § 63.1439(b)(1).
63.6(e)(3)(iv) No Recordkeeping and reporting are specified in § 63.1439(b)(1).
63.6(e)(3)(v) No Requirement is specified in § 63.1439(b)(1).
63.6(e)(3)(vi) Yes.
63.6(e)(3)(vii) Yes.
63.6(e)(3)(vii) (A) Yes.
63.6(e)(3)(vii) (B) Yes Except the plan shall provide for operation in compliance with § 63.1420(i)(4).
63.6(e)(3)(vii) (C) Yes.
63.6(e)(3)(viii) Yes.
63.6(e)(3)(ix) Yes.
63.6(f)(1) Yes.
63.6(f)(2) Yes Except 63.7(c), as referred to in § 63.6(f)(2)(iii)(D) does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.1434.
63.6(f)(3) Yes.
63.6(g) Yes.
63.6(h) No Subpart PPP does not require opacity and visible emission standards.
63.6(i)(1) Yes.
63.6(i)(2) Yes.
63.6(i)(3) Yes.
63.6(i)(4)(i)(A) Yes.
63.6(i)(4)(i)(B) No Dates are specified in § 63.1422(e) and § 63.1439(e)(4)(i) for all emission points except equipment leaks, which are covered under § 63.182(a)(6)(i).
63.6(i)(4)(ii) No.
63.6(i)(5)-(14) Yes.
63.6(i)(15) No Reserved.
63.6(i)(16) Yes.
63.6(j) Yes.
63.7(a)(1) Yes.
63.7(a)(2) No § 63.1439(e) (5) and (6) specify the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.
63.7(a)(3) Yes.
63.7(b) No § 63.1437(a)(4) specifies notification requirements.
63.7(c) No Except if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under § 63.6(g).
63.7(d) Yes.
63.7(e)(1) Yes Except that all performance tests shall be conducted during worst case operating conditions.
63.7(e)(2) Yes.
63.7(e)(3) No Subpart PPP specifies requirements.
63.7(e)(4) Yes.
63.7(f) Yes Since a site-specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site-specific test plan.
63.7(g) Yes Except the notification of compliance status report requirements in § 63.1439(e)(5) shall apply instead of those in § 63.9(h). In addition, equipment leaks subject to § 63.1434 are not required to conduct performance tests.
63.7(h) Yes Except § 63.7(h)(4)(ii) is not applicable, since the site-specific test plans in § 63.7(c)(2) are not required.
63.8(a)(1) Yes.
63.8(a)(2) No.
63.8(a)(3) No Reserved.
63.8(a)(4) Yes.
63.8(b)(1) Yes.
63.8(b)(2) No Subpart PPP specifies locations to conduct monitoring.
63.8(b)(3) Yes.
63.8(c)(1) Yes.
63.8(c)(1)(i) Yes.
63.8(c)(1)(ii) No For all emission points except equipment leaks, comply with § 63.1439(b)(1)(i)(B); for equipment leaks, comply with § 63.181(g)(2)(ii).
63.8(c)(1)(iii) Yes.
63.8(c)(2) Yes.
63.8(c)(3) Yes.
63.8(c)(4) No § 63.1438 specifies monitoring requirements; not applicable to equipment leaks, because § 63.1434 does not require continuous monitoring systems.
63.8(c)(5)-(8) No.
63.8(d) No.
63.8(e) No.
63.8(f)(1)-(3) Yes.
63.8(f)(4)(i) Yes Except the timeframe for submitting request is specified in § 63.1439(f) or (g); not applicable to equipment leaks, because § 63.1434 (through subpart H of this part) specifies acceptable alternative methods.
63.8(f)(4)(ii) Yes.
63.8(f)(4)(iii) Yes.
63.8(f)(5)(i) Yes.
63.8(f)(5)(ii) No.
63.8(f)(5)(iii) Yes.
63.8(f)(6) No Subpart PPP does not require CEMs.
63.8(g) No Data reduction procedures specified in § 63.1439(d) and (h); not applicable to equipment leaks.
63.9(a) Yes.
63.9(b) No The initial notification requirements are specified in § 63.1439(e)(3).
63.9(c) Yes.
63.9(d) Yes.
63.9(e) No § 63.1437(a)(4) specifies notification deadline.
63.9(f) No Subpart PPP does not require opacity and visible emission standards.
63.9(g) No.
63.9(h) No § 63.1439(e)(5) specifies notification of compliance status requirements.
63.9(i) Yes.
63.9(j) No.
63.10(a) Yes.
63.10(b)(1) No § 63.1439(a) specifies record retention requirements.
63.10(b)(2) No Subpart PPP specifies recordkeeping requirements.
63.10(b)(3) Yes.
63.10(c) No § 63.1439 specifies recordkeeping requirements.
63.10(d)(1) Yes.
63.10(d)(2) No § 63.1439(e)(5) and (6) specify performance test reporting requirements; not applicable to equipment leaks.
63.10(d)(3) No Subpart PPP does not require opacity and visible emission standards.
63.10(d)(4) Yes.
63.10(d)(5)(i) Yes Except that reports required by § 63.10(d)(5)(i) shall be submitted at the same time as Periodic Reports specified in § 63.1439(e)(6). The start-up, shutdown, and malfunction plan, and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points.
63.10(d)(5)(ii) No.
63.10(e) No § 63.1439 specifies reporting requirements.
63.10(f) Yes.
63.11 Yes.
63.12 Yes Except that the authority of § 63.177 (for equipment leaks) will not be delegated to States.
63.13-63.15 Yes.
[65 FR 26502, May 8, 2000, as amended at 71 FR 20461, Apr. 20, 2006]

Title 40 published on 2013-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-03-27; vol. 79 # 59 - Thursday, March 27, 2014
    1. 79 FR 17340 - National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins; Pesticide Active Ingredient Production; and Polyether Polyols Production
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on March 27, 2014. The incorporation by reference of certain publications listed in this final rule was approved by the Director of the Federal Register as of March 27, 2014.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2013-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-03-27; vol. 79 # 59 - Thursday, March 27, 2014
    1. 79 FR 17340 - National Emission Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins; Pesticide Active Ingredient Production; and Polyether Polyols Production
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on March 27, 2014. The incorporation by reference of certain publications listed in this final rule was approved by the Director of the Federal Register as of March 27, 2014.
      40 CFR Part 63