40 CFR Part 63, Subpart QQQQ, Table 4 to Subpart QQQQ of Part 63 - Applicability of General Provisions to Subpart QQQQ of Part 63

Status message

There are 7 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
View PDF at GPO Pt. 63, Subpt. QQQQ, Table 4
Table 4 to Subpart QQQQ of Part 63—Applicability of General Provisions to Subpart QQQQ of Part 63
You must comply with the applicable General Provisions requirements according to the following table:
Citation Subject Applicable to subpart QQQQ Explanation
§ 63.1(a)(1)-(14) General Applicability Yes.
§ 63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability to subpart QQQQ is also specified in § 63.4681.
§ 63.1(c)(1) Applicability After Standard Established Yes.
§ 63.1(c)(2)-(3) Applicability of Permit Program for Area Sources No Area sources are not subject to subpart QQQQ.
§ 63.1(c)(4)-(5) Extensions and Notifications Yes.
§ 63.1(e) Applicability of Permit Program Before Relevant Standard is Set Yes.
§ 63.2 Definitions Yes Additional definitions are specified in § 63.4781.
§ 63.3(a)-(c) Units and Abbreviations Yes.
§ 63.4(a)(1)-(5) Prohibited Activities Yes.
§ 63.4(b)-(c) Circumvention/Severability Yes.
§ 63.5(a) Construction/Reconstruction Yes.
§ 63.5(b)(1)-(6) Requirements for Existing, Newly Constructed, and Reconstructed Sources Yes.
§ 63.5(d) Application for Approval of Construction/Reconstruction Yes.
§ 63.5(e) Approval of Construction/Reconstruction Yes.
§ 63.5(f) Approval of Construction/Reconstruction Based on Prior State Review Yes.
§ 63.6(a) Compliance With Standards and Maintenance Requirements—Applicability Yes
§ 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes § 63.4683 specifies the compliance dates.
§ 63.6(c)(1)-(5) Compliance Dates for Existing Sources Yes § 63.4683 specifies the compliance dates.
§ 63.6(e)(1)-(2) Operation and Maintenance Yes
§ 63.6(e)(3) SSMP Yes Only sources using an add-on control device to comply with the standard must complete SSMP.
§ 63.6(f)(1) Compliance Except During SSM Yes Applies only to sources using an add-on control device to comply with the standard.
§ 63.6(f)(2)-(3) Methods for Determining Compliance Yes
§ 63.6(g)(1)-(3) Use of an Alternative Standard Yes
§ 63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart QQQQ does not establish opacity standards and does not require continuous opacity monitoring systems (COMS).
§ 63.6(i)(1)-(16) Extension of Compliance Yes
§ 63.6(j) Presidential Compliance Exemption Yes
§ 63.7(a)(1) Performance Test Requirements—Applicability Yes Applies to all affected sources. Additional requirements for performance testing are specified in §§ 63.4764, 63.4765, and 63.4766.
§ 63.7(a)(2) Performance Test Requirements—Dates Yes Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standard. § 63.4760 specifies the schedule for performance test requirements that are earlier than those specified in § 63.7(a)(2).
§ 63.7(a)(3) Performance Tests Required By the Administrator Yes.
§ 63.7(b)-(e) Performance Test Requirements—Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standard.
§ 63.7(f) Performance Test Requirements—Use of Alternative Test Method Yes Applies to all test methods except those used to determine capture system efficiency.
§ 63.7(g)-(h) Performance Test Requirements—Data Analysis, Recordkeeping, Reporting, Waiver of Test Yes Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standard.
§ 63.8(a)(1)-(3) Monitoring Requirements—Applicability Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standard. Additional requirements for monitoring are specified in § 63.4768.
§ 63.8(a)(4) Additional Monitoring Requirements No Subpart QQQQ does not have monitoring requirements for flares.
§ 63.8(b) Conduct of Monitoring Yes.
§ 63.8(c)(1)-(3) Continuous Monitoring System (CMS) Operation and Maintenance Yes Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standard. Additional requirements for CMS operations and maintenance are specified in § 63.4768.
§ 63.8(c)(4) CMSs No § 63.4768 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply.
§ 63.8(c)(5) COMS No Subpart QQQQ does not have opacity for visible emission standards.
§ 63.8(c)(6) CMS Requirements No § 63.4768 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply.
§ 63.8(c)(7) CMS Out-of-Control Periods Yes.
§ 63.8(c)(8) CMS Out-of-Control Periods Reporting No § 63.4720 requires reporting of CMS out-of-control periods.
§ 63.8(d)-(e) Quality Control Program and CMS Performance Evaluation No Subpart QQQQ does not require the use of continuous emissions monitoring systems.
§ 63.8(f)(1)-(5) Use of an Alternative Monitoring Method Yes.
§ 63.8(f)(6) Alternative to Relative Accuracy Test No Subpart QQQQ does not require the use of continuous emissions monitoring systems.
§ 63.8(g)(1)-(5) Data Reduction No §§ 63.4767 and 63.4768 specify monitoring data reduction.
§ 63.9(a)-(d) Notification Requirements Yes.
§ 63.9(e) Notification of Performance Test Yes Applies only to capture system and add-on control device performance tests at sources using these to comply with the standard.
§ 63.9(f) Notification of Visible Emissions/Opacity Test No Subpart QQQQ does not have opacity or visible emission standards.
§ 63.9(g)(1)-(3) Additional Notifications When Using CMS No Subpart QQQQ does require the use of continuous emissions monitoring systems.
§ 63.9(h) Notification of Compliance Status Yes § 63.4710 specifies the dates for submitting the notification of compliance status.
§ 63.9(i) Adjustment of Submittal Deadlines Yes.
§ 63.9(j) Change in Previous Information Yes.
§ 63.10(a) Recordkeeping/Reporting—Applicability and General Information Yes.
§ 63.10(b)(1) General Recordkeeping Requirements Yes Additional requirements are specified in §§ 63.4730 and 63.4731.
§ 63.10(b)(2)(i)-(v) Recordkeeping Relevant to SSM Periods and CMS Yes Requirements for SSM records only apply to add-on control devices used to comply with the standard.
§ 63.10(b)(2)(vi)-(xi) Yes.
§ 63.10(b)(2)(xii) Records Yes.
§ 63.10(b)(2)(xiii) No Subpart QQQQ does not require the use of continuous emissions monitoring systems.
§ 63.10(b)(2)(xiv) Yes.
§ 63.10(b)(3) Recordkeeping Requirements for Applicability Determinations Yes.
§ 63.10(c)(1)-(6) Additional Recordkeeping Requirements for Sources with CMS Yes.
§ 63.10(c)(7)-(8) No The same records are required in § 63.4720(a) (7).
§ 63.10(c)(9)-(15) Yes.
§ 63.10(d)(1) General Reporting Requirements Yes Additional requirements are specified in § 63.4720.
§ 63.10(d)(2) Report of Performance Test Results Yes Additional requirements are specified in § 63.4720(b).
§ 63.10(d)(3) Reporting Opacity or Visible Emissions Observations No Subpart QQQQ does not require opacity or visible emissions observations.
§ 63.10(d)(4) Progress Reports for Sources With Compliance Extensions Yes.
§ 63.10(d)(5) SSM Reports Yes Applies only to add-on control devices at sources using these to comply with the standard.
§ 63.10(e)(1)-(2) Additional CMS Reports No Subpart QQQQ does not require the use of continuous emissions monitoring systems.
§ 63.10(e)(3) Excess Emissions/CMS Performance Reports No § 63.4720(b) specifies the contents of periodic compliance reports.
§ 63.10(e)(4) COMS Data Reports No Subpart QQQQ does not specify requirements for opacity or COMS.
§ 63.10(f) Recordkeeping/Reporting Waiver Yes.
§ 63.11 Control Device Requirements/Flares No Subpart QQQQ does not specify use of flares for compliance.
§ 63.12 State Authority and Delegations Yes.
§ 63.13 Addresses Yes.
§ 63.14 Incorporation by Reference Yes Test Methods ANSI/ASME PTC 19.10-1981, Part 10, ASTM D2697-86 (Reapproved 1998), and ASTM D6093-97 (incorporated by reference, see § 63.14).
§ 63.15 Availability of Information/Confidentiality Yes.

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-25; vol. 79 # 227 - Tuesday, November 25, 2014
    1. 79 FR 70102 - National Emission Standards for Hazardous Air Pollutants; Delegation of Authority to Texas
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Direct final rule; delegation of authority.
      This rule is effective on January 26, 2015 without further notice, unless EPA receives relevant adverse comment by December 26, 2014. If EPA receives such comment, EPA will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-12-12; vol. 79 # 239 - Friday, December 12, 2014
    1. 79 FR 73872 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing; Extension of Comment Period
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of proposed rulemaking; extension of public comment period.
      Comments. The public comment period for the proposed rule published in the Federal Register on November 7, 2014, (79 FR 66512) is being extended for 30 days to January 21, 2015.
      40 CFR Parts 60 and 63