40 CFR Part 63, Subpart U, Table 1 to Subpart U of Part 63 - Applicability of General Provisions to Subpart U Affected Sources

Status message

There are 7 Updates appearing in the Federal Register for 40 CFR 63. View below or at eCFR (GPOAccess)
prev | next
View PDF at GPO Pt. 63, Subpt. U, Table 1
Table 1 to Subpart U of Part 63—Applicability of General Provisions to Subpart U Affected Sources
Reference Applies to subpart U Explanation
a The plan and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.
§ 63.1(a)(1) Yes § 63.482 specifies definitions in addition to or that supersede definitions in § 63.2.
§ 63.1(a)(2) Yes.
§ 63.1(a)(3) Yes § 63.481(f) through (k) and § 63.160(b) identify those standards which may apply in addition to the requirements of subparts U and H of this part, and specify how compliance shall be achieved.
§ 63.1(a)(4) Yes Subpart U (this table) specifies the applicability of each paragraph in subpart A to subpart U.
§ 63.1(a)(5) No [Reserved.].
§ 63.1(a)(6)-(8) Yes.
§ 63.1(a)(9) No [Reserved.].
§ 63.1(a)(10) Yes.
§ 63.1(a)(11) Yes.
§ 63.1(a)(12)-(14) Yes.
§ 63.1(b)(1) No § 63.480(a) contains specific applicability criteria.
§ 63.1(b)(2) Yes.
§ 63.1(b)(3) No § 63.480(b) provides documentation requirements for EPPUs not considered affected sources.
§ 63.1(c)(1) Yes Subpart U (this table) specifies the applicability of each paragraph in subpart A to subpart U.
§ 63.1(c)(2) No Area sources are not subject to subpart U.
§ 63.1(c)(3) No [Reserved.].
§ 63.1(c)(4) Yes.
§ 63.1(c)(5) Yes Except that affected sources are not required to submit notifications that are not required by subpart U.
§ 63.1(d) No [Reserved.].
§ 63.1(e) Yes.
§ 63.2 Yes § 63.482 specifies those subpart A definitions that apply to subpart U.
§ 63.3 Yes.
§ 63.4(a)(1)-(3) Yes.
§ 63.4(a)(4) No [Reserved.].
§ 63.4(a)(5) Yes.
§ 63.4(b) Yes.
§ 63.4(c) Yes.
§ 63.5(a)(1) Yes Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source”.
§ 63.5(a)(2) Yes.
§ 63.5(b)(1) Yes Except § 63.480(i) defines when construction or reconstruction is subject to new source standards.
§ 63.5(b)(2) No [Reserved.].
§ 63.5(b)(3) Yes.
§ 63.5(b)(4) Yes Except that the Initial Notification and § 63.9(b) requirements do not apply.
§ 63.5(b)(5) Yes.
§ 63.5(b)(6) Yes Except that § 63.480(i) defines when construction or reconstruction is subject to the new source standards.
§ 63.5(c) No [Reserved.].
§ 63.5(d)(1)(i) Yes Except that the references to the Initial Notification and § 63.9(b)(5) do not apply.
§ 63.5(d)(1)(ii) Yes Except that § 63.5(d)(1)(ii)(H) does not apply.
§ 63.5(d)(1)(iii) No § 63.506(e)(5) and § 63.502(f) specify Notification of Compliance Status requirements.
§ 63.5(d)(2) No.
§ 63.5(d)(3) Yes Except § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.502 are exempt.
§ 63.5(d)(4) Yes.
§ 63.5(e) Yes.
§ 63.5(f)(1) Yes.
§ 63.5(f)(2) Yes Except that where § 63.9(b)(2) is referred to, the owner or operator need not comply.
§ 63.6(a) Yes.
§ 63.6(b)(1) No The dates specified in § 63.481(b) apply, instead.
§ 63.6(b)(2) No.
§ 63.6(b)(3) No.
§ 63.6(b)(4) No.
§ 63.6(b)(5) No.
§ 63.6(b)(6) No [Reserved.].
§ 63.6(b)(7) No.
§ 63.6(c)(1) Yes § 63.481 specifies the compliance date.
§ 63.6(c)(2) No.
§ 63.6(c)(3) No [Reserved.].
§ 63.6(c)(4) No [Reserved.].
§ 63.6(c)(5) Yes.
§ 63.6(d) No [Reserved.].
§ 63.6(e)(1)(i) No See § 63.483(a)(1) for general duty requirement. Any cross reference to § 63.6(e)(1)(i) in any other general provision incorporated by reference shall be treated as a cross reference to § 63.483(a)(1).
§ 63.6(e)(1)(ii) No
§ 63.6(e)(1)(iii) Yes.
§ 63.6(e)(2) No [Reserved]
§ 63.6(e)(3) No
§ 63.6(f)(1) No
§ 63.6(f)(2) Yes Except 63.7(c), as referred to in § 63.6(f)(2)(iii)(D) does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.502.
§ 63.6(f)(3) Yes.
§ 63.6(g) Yes.
§ 63.6(h) No Subpart U does not require opacity and visible emission standards.
§ 63.6(i)(1) Yes.
§ 63.6(i)(2) Yes.
§ 63.6(i)(3) Yes.
§ 63.6(i)(4)(i)(A) Yes.
§ 63.6(i)(4)(i)(B) No Dates are specified in § 63.481(e) and § 63.506(e)(3)(i).
§ 63.6(i)(4)(ii) No.
§ 63.6(i)(5)-(14) Yes.
§ 63.6(i)(15) No [Reserved.].
§ 63.6(i)(16) Yes.
§ 63.6(j) Yes.
§ 63.7(a)(1) Yes.
§ 63.7(a)(2) No. § 63.506(e)(5) specifies the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.
§ 63.7(a)(3) Yes.
§ 63.7(b) No § 63.504(a)(4) specifies notification requirements.
§ 63.7(c) No Except if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under § 63.6(g).
§ 63.7(d) Yes.
§ 63.7(e)(1) No See § 63.504(a)(1). Any cross-reference to § 63.7(e)(1) in any other general provision incorporated by reference shall be treated as a cross-reference to § 63.504(a)(1).
§ 63.7(e)(2) Yes.
§ 63.7(e)(3) No Subpart U specifies requirements.
§ 63.7(e)(4) Yes.
§ 63.7(f) Yes Except that § 63.144(b)(5)(iii)(A) & (B) shall apply for process wastewater. Also, since a site specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site specific test plan.
§ 63.7(g) Yes Except that the requirements in § 63.506(e)(5) shall apply instead of references to the Notification of Compliance Status report in 63.9(h). In addition, equipment leaks subject to § 63.502 are not required to conduct performance tests.
§ 63.7(h) Yes Except § 63.7(h)(4)(ii) is not applicable, since the site-specific test plans in § 63.7(c)(2) are not required.
§ 63.8(a)(1) Yes.
§ 63.8(a)(2) No.
§ 63.8(a)(3) No [Reserved.].
§ 63.8(a)(4) Yes.
§ 63.8(b)(1) Yes.
§ 63.8(b)(2) No Subpart U specifies locations to conduct monitoring.
§ 63.8(b)(3) Yes.
§ 63.8(c)(1) Yes.
§ 63.8(c)(1)(i) Yes.
§ 63.8(c)(1)(ii) No For all emission points except equipment leaks, comply with § 63.506(b)(1)(i)(B); for equipment leaks, comply with § 63.181(g)(2)(iii).
§ 63.8(c)(1)(iii) Yes.
§ 63.8(c)(2) Yes.
§ 63.8(c)(3) Yes.
§ 63.8(c)(4) No § 63.505 specifies monitoring frequency; not applicable to equipment leaks, because § 63.502 does not require continuous monitoring systems.
§ 63.8(c)(5)-(8) No.
§ 63.8(d) No.
§ 63.8(e) No.
§ 63.8(f)(1)-(3) Yes.
§ 63.8(f)(4)(i) No Timeframe for submitting request is specified in § 63.506(f) or (g); not applicable to equipment leaks, because § 63.502 (through reference to subpart H) specifies acceptable alternative methods.
§ 63.8(f)(4)(ii) No Contents of request are specified in § 63.506(f) or (g).
§ 63.8(f)(4)(iii) No.
§ 63.8(f)(5)(i) Yes.
§ 63.8(f)(5)(ii) No.
§ 63.8(f)(5)(iii) Yes.
§ 63.8(f)(6) No Subpart U does not require CEM's.
§ 63.8(g) No Data reduction procedures specified in § 63.506(d) and (h); not applicable to equipment leaks.
§ 63.9(a) Yes.
§ 63.9(b) No Subpart U does not require an initial notification.
§ 63.9(c) Yes.
§ 63.9(d) Yes.
§ 63.9(e) No § 63.504(a)(4) specifies notification deadline.
§ 63.9(f) No Subpart U does not require opacity and visible emission standards.
§ 63.9(g) No.
§ 63.9(h) No § 63.506(e)(5) specifies Notification of Compliance Status requirements.
§ 63.9(i) Yes.
§ 63.9(j) No.
§ 63.10(a) Yes
§ 63.10(b)(1) No § 63.506(a) specifies record retention requirements.
§ 63.10(b)(2) No Subpart U specifies recordkeeping requirements.
§ 63.10(b)(3) No § 63.480(b) requires documentation of sources that are not affected sources.
§ 63.10(c) No § 63.506 specifies recordkeeping requirements.
§ 63.10(d)(1) Yes
§ 63.10(d)(2) No § 63.506(e)(5) specifies performance test reporting requirements; not applicable to equipment leaks.
§ 63.10(d)(3) No Subpart U does not require opacity and visible emission standards.
§ 63.10(d)(4) Yes
63.10(d)(5)(i) No
§ 63.10(d)(5)(ii) No
§ 63.10(e) No § 63.506 specifies reporting requirements.
§ 63.10(f) Yes
§ 63.11 Yes § 63.11(b) specifies requirements for flares used to comply with provisions of this subpart. § 63.504(c) contains the requirements to conduct compliance demonstrations for flares subject to this subpart. § 63.11(c), (d), and (e) specifies requirements for an alternative work practice for equipment leaks.
§ 63.12 Yes Except that the authority of § 63.503(i) and the authority of § 63.177 (for equipment leaks) will not be delegated to States.
§§ 63.13-63.15 Yes
[66 FR 36928, July 16, 2001, as amended at 71 FR 20457, Apr. 20, 2006; 73 FR 78213, Dec. 22, 2008]

Title 40 published on 2014-07-01

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-25; vol. 79 # 227 - Tuesday, November 25, 2014
    1. 79 FR 70102 - National Emission Standards for Hazardous Air Pollutants; Delegation of Authority to Texas
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Direct final rule; delegation of authority.
      This rule is effective on January 26, 2015 without further notice, unless EPA receives relevant adverse comment by December 26, 2014. If EPA receives such comment, EPA will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR 63 after this date.

  • 2014-12-12; vol. 79 # 239 - Friday, December 12, 2014
    1. 79 FR 73872 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing; Extension of Comment Period
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice of proposed rulemaking; extension of public comment period.
      Comments. The public comment period for the proposed rule published in the Federal Register on November 7, 2014, (79 FR 66512) is being extended for 30 days to January 21, 2015.
      40 CFR Parts 60 and 63